BOQ for P & F Spartex Tiles in the Water Tanks at Banyan Park

Sr No DESCRIPTION OF ITEM Quantity Unit


Removing of the existing loose and bulged
1 tiles in the water tanks and dispossing of the 20.00 Sq Mtr
debris out of site
P / L 300mmX 300mm Spartex tiles ( Matching
the Existing colour and shade ) in the water
tanks at required locations and positions
using Bal Endura Adhesive as per
2 manufacturers specifications and cleaning the 20.00 Sq Mtr
area after carrying out the works.

Vendor to take care of HSE requirements as


required by the HSE team

TOTAL