Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

4.1.6.12.

2 Optical fiber cable installation

1 Insert the SFP on the MPT-HC. 2 Insert the optical fiber on the hole.
For the position refer to par. 4.1.6.2.1.1.

3 Take the gland body and move it on the 4 Fix the gland body. The gland body must
hole. be fixed on the indication present on the
heat shrink tube.

Reference

Gland

Warning: The end of the heat-shrink tube 


reference must be outside the gland.

5 Tighten the gland nut with the dynamometric 6 Remove the protection caps from the fiber
wrench (10 N). connectors.

9500 MPR Rel. 3.1 User Manual


698/980 3DB18809AAAA Issue 1 Installation

You might also like