Problem > Solution - 5 Why's Analysis Worksheet

Department: PRODUCTION Location: NEW-PAN/6A Date: 05/07/2019 Product/Process: Oil filling through Vacuum

Problem Description: Breakdown of Oil insulation/Di-electric strength of Oil is Low during inspection/at Site
Corrective &
Preventive Actions Date
Root Cause Responsible Party
Therefore
Why? PRODUCTION - The
Partial breakdown of Process should be
insulating material supervised without
Therefore
Why? Flash Over any deviation which
during creates bubbles in oil
application of which is very
High Voltage dangerous for
Therefore
Transformer
Why? Deviation in Oil
operation at high
PPM Therefore voltage. If there is
Why? Presence of bubble in oil then at
moisture content the time of
in the
application of high 5/7/2019
voltage it offers less
oil/Formation of dielectric strength
Bubbles in Oil Therefore than oil resulting in
Why? Oil in the partial breakdown of
Transformer tank is an insulating material
not filled through which further result
Vacuum at initial in breakdown of
stage/Deviation in whole oil insulation
work

Why?

Problem > Solution Completed: Solution Date: To be done Break point of the change in the process: Implementation Date: