Building Estimate
Building Estimate
Estimate
sundries
a). Foundation :
sundries
b) Basement:
Sundries
Sundries
b).First floor
sundries
deduction:
add sundrises
sundries
Supplying and fabrication reinforcement
7 for
R.C.C. works such as lintel, roof slab,
columns,
beams, sunshade etc., complete.
sundries
surfaces.
ground floor:-
sundries
first floor:
sundries
Total
sundries
sundrises
first floor:
sundrises
total
sundries -
sundries
mortar.
Qty as per item No:13/0.08
=19/0.08
sundries
Sundries -
Sundries
chool Building
54.48
25.23
0.30
m
3 m
3
6.85
5.61
0.55
26.46
26.46
26.46
11.16
12.81
8.93
0.71
m
3 m
3
13.00
25.11
0.89
m
3 m
3
53.72
21.05
53.72
21.05
23.89
173.42
-4.40
-13.41
-1.51
0.89
m
3 m
3
6.44
-2.27
0.83
m
3 m
3
11.31
12.66
10.03
7.35
1.35
61.14
1.40
0.76
106.00 5000 530000
m
3 m
3
10600.00
0.00
10600.00 90 954000
kg kg
5.46
64.90
43.60
31.97
21.07
509.54
12.80
0.66
m
2 m
2
43.38
43.38
43.38
18.30
21.00
14.64
38.20
0.72
223.00
m
2
43.38
43.38
43.38
18.30
21.00
14.64
38.20
0.72
223.00
m
2 m
2
1347.83
10.00
0.17
m
2 m
2
43.38
43.38
43.38
18.30
21.00
12.98
0.58
183.00
m
2
43.38
43.38
43.38
18.30
21.00
38.20
12.98
0.38
221.00
404.00 1400 565600
m
2 m
2
97.64
-23.26
0.62
m
2 m
2
18.92
0.08
m
3 m
3
237.50
0.50
m
2 m
2
19.11
18.90
0.99
m
2
58.31
0.55
0.15
m
2 m
2
17 Supplying and fixing of White washing and colour washing of wall
Qty as per item No 9(a+b) +10 (a+b)
= (446) + (1358) 1804 300
2 2
m m
221.00 300
2 2
m m
20 Provision for Water tank and water supply lines & fittings L.S.
22 Provision for septic tank & sanitary lines & fittings L.S.
TOTAL
Say as Rs.72,50,000 /-
(Rupees Seventy two lakhs and Fifty Thousand only)
541200
66300
650000
350000
200000
100000
30000
90000
60000
650000
14450
7250000