RD 0 30 60 90 120 150
NSL 248.145 248.5 249.25 248.75 248.15 247.75
B= 2 m
Area of Centre
S= 2:1 Area = B x S= 2:1
sd2/2 d sd2/2
d
Length of Quantity of
Each Section
Each
Section (L) Q = A x L
m m3
30.00 269.49
30.00 143.44
30.00 120.00
30.00 237.15
30.00 375.15
y of Earth Work = 1145.23 m3
3D View of Embankment
ESTIMATING AND
Top width ofCOSTING OF CIVIL ENGINEERING
an embankment PROJECTS
is 2m. Side Slope on both sides of this bank is 2:1.
Natural Surface Level at 30 m interval are given below. Workout the quantity of
Depth Method.
RD 0 30 60 90 120 150
NSL 248.145 248.5 249.25 248.75 248.15 247.75
B= 2 m
Area of Centre
S= 2:1 Area = B x S= 2:1
sd2/2
d d sd2/2
Length of Quantity of
Each Section
Each
Section (L) Q = A x L
m m3
y of Earth Work = m3
3D View of Embankment