ESTIMATING AND

Top width ofCOSTING OF CIVIL ENGINEERING


an embankment PROJECTS
is 2m. Side Slope on both sides of this bank is 2:1.
Natural Surface Level at 30 m interval are given below. Workout the quantity of
Depth Method.

RD 0 30 60 90 120 150
NSL 248.145 248.5 249.25 248.75 248.15 247.75

Breadth at the Top of Bank = B = 2 m


Side Slope on Each Side = S = 2:1 = 2
Length of Each Section (Interval) = L = 30 m
Top Level = TL = 250.00 m
Depth or Height of Bank = d = TL - N.S.L
Note: Blue Colour cells are input values cells
EARTH WORK OF ROAD EMBANKMENT BY MEAN DEPTH METHOD

Mean Depth Area of Area of


Top Level Length of
Depth (D) (d) Centre (AC) Sides (AS) Total Area
Station or D = TL- dm=(D1+D2)/ AC= B x Each
Chainage N.S.L TL NSL 2 dm AS= S x d2A= AC+AS Section (L)
m m m m m m2 m2 m2 m

0 248.15 250.00 1.85


1.68 3.35 5.63 8.98 30.00
30 248.50 250.00 1.50
1.13 2.25 2.53 4.78 30.00
60 249.25 250.00 0.75
1.00 2.00 2.00 4.00 30.00
90 248.75 250.00 1.25
1.55 3.10 4.80 7.90 30.00
120 248.15 250.00 1.85
2.05 4.10 8.40 12.51 30.00
150 247.75 250.00 2.25
Total Quantity of Earth Work =
this bank is 2:1. Levels of top surface of(LECTURED BY:toEngr.
this bank is WASEEM
be 250 m, RAJA)
t the quantity of earth work for this embankment according to Mean

B= 2 m

Area of Centre
S= 2:1 Area = B x S= 2:1
sd2/2 d sd2/2
d

Area of Sides = sd2/2 + sd2/2 = 2sd2/2 = sd2


Total Area = Area of Cenrre + Area of Sides = Bd + sd2
TH METHOD

Length of Quantity of
Each Section
Each
Section (L) Q = A x L
m m3

30.00 269.49
30.00 143.44
30.00 120.00
30.00 237.15
30.00 375.15
y of Earth Work = 1145.23 m3

3D View of Embankment
ESTIMATING AND
Top width ofCOSTING OF CIVIL ENGINEERING
an embankment PROJECTS
is 2m. Side Slope on both sides of this bank is 2:1.
Natural Surface Level at 30 m interval are given below. Workout the quantity of
Depth Method.

RD 0 30 60 90 120 150
NSL 248.145 248.5 249.25 248.75 248.15 247.75

Breadth at the Top of Bank = B = 2 m


Side Slope on Each Side = S = 2:1 = 2
Length of Each Section (Interval) = L = 30 m
Top Level = TL = 250.00 m
Depth or Height of Bank = d = TL - N.S.L
Note: Blue Colour cells are input values cells
EARTH WORK OF ROAD EMBANKMENT BY MEAN DEPTH METHOD

Mean Depth Area of Area of


Top Level Length of
Depth (D) (d) Centre (AC) Sides (AS) Total Area
Station or D = TL- dm=(D1+D2)/ AC= B x Each
Chainage N.S.L TL NSL 2 dm AS= S x d2A= AC+AS Section (L)
m m m m m m2 m2 m2 m

Total Quantity of Earth Work =


this bank is 2:1. Levels of top surface of(LECTURED BY:toEngr.
this bank is WASEEM
be 250 m, RAJA)
t the quantity of earth work for this embankment according to Mean

B= 2 m

Area of Centre
S= 2:1 Area = B x S= 2:1
sd2/2
d d sd2/2

Area of Sides = sd2/2 + sd2/2 = 2sd2/2 = sd2


Total Area = Area of Cenrre + Area of Sides = Bd + sd2
TH METHOD

Length of Quantity of
Each Section
Each
Section (L) Q = A x L
m m3

y of Earth Work = m3

3D View of Embankment