Excavation Qty COS-3 Agrakhal

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 7

PROJECT- AGRAKHAL TO CHAMBA ROAD PROJECT (NH-94)

QUANTITY OF EXCAVATION FROM CHAINAGE 43+500 TO CHAINAGE 43+680


Average
Sr. No. ChainageLength (meter)
Area (sqm) Area Quantity (cum)
(sqm)
1 43+500 0 170.46 170.456 0.00

2 43+510 10 134.94 152.70 1527.00

3 43+520 10 196.46 165.70 1657.00

4 43+530 10 133.79 165.12 1651.22

5 43+540 10 49.59 91.69 916.88

6 43+550 10 92.36 70.98 709.76

7 43+560 10 132.56 112.46 1124.64

8 43+570 10 67.56 100.06 1000.64

9 43+580 10 168.20 117.88 1178.83

10 43+590 10 152.33 160.27 1602.66

11 43+600 10 272.52 212.42 2124.23

12 43+610 10 66.71 169.61 1696.13

13 43+620 10 58.85 62.78 627.78

14 43+630 10 134.00 96.42 964.21

15 43+640 10 179.39 156.69 1566.94

16 43+650 10 210.05 194.72 1947.19

17 43+660 10 201.56 205.80 2058.01

18 43+670 10 127.24 164.40 1643.99

TOTAL QUANTITY (CUM) 23997.06


QUANTITY OF EXCAVATION FROM CHAINAGE 35+000 TO CHAINAGE 35+100
Average
Sr. No. ChainageLength (meter)
Area (sqm) Area Quantity (cum)
(sqm)
1 35+000 0 345.42 345.42 0.00

2 35+010 10 335.73 340.58 3405.76

3 35+020 10 226.91 281.32 2813.22

4 35+030 10 522.86 374.88 3748.84

5 35+040 10 516.81 519.84 5198.36

6 35+050 10 498.36 507.59 5075.86

7 35+060 10 490.63 494.49 4944.94

8 35+070 10 466.98 478.80 4788.04

9 35+080 10 447.28 457.13 4571.30

10 35+090 10 345.93 396.61 3966.07

11 35+100 10 490.63 418.28 4182.81

TOTAL QUANTITY (CUM) 42695.18


QUANTITY OF EXCAVATION FROM CHAINAGE 44+220 TO CHAINAGE 44+260
Average
Sr. No. ChainageLength (meter)
Area (sqm) Area Quantity (cum)
(sqm)
1 44+220 0 58.64 58.64 0.00

2 44+230 10 201.19 129.92 1299.17

3 44+240 10 251.83 226.51 2265.10

4 44+250 10 300.99 276.41 2764.11

5 44+260 10 319.19 310.09 3100.90

TOTAL QUANTITY (CUM) 9429.275


QUANTITY OF EXCAVATION FROM CHAINAGE 30+640 TO CHAINAGE 30+740
Average
Sr. No. ChainageLength (meter)
Area (sqm) Area Quantity (cum)
(sqm)
1 30+640 0 267.94 267.94 0.00

2 30+650 10 119.14 193.54 1935.41

3 30+660 10 195.24 157.19 1571.90

4 30+670 10 140.00 167.62 1676.19

5 30+680 10 116.16 128.08 1280.78

6 30+690 10 201.66 158.91 1589.08

7 30+700 10 223.77 212.71 2127.13

8 30+710 10 459.28 341.53 3415.25

9 30+720 10 580.03 519.65 5196.54

10 30+730 10 282.20 431.11 4311.13

11 30+740 10 142.60 212.40 2123.99

TOTAL QUANTITY (CUM) 25227.38


QUANTITY OF EXCAVATION FROM CHAINAGE 40+460 TO CHAINAGE 40+510
Average
Sr. No. ChainageLength (meter)
Area (sqm) Area Quantity (cum)
(sqm)
1 40+460 0 762.65 762.65 0.00

2 40+470 10 792.52 777.58 7775.85

3 40+480 10 518.71 655.61 6556.15

4 40+490 10 344.11 431.41 4314.09

5 40+500 10 266.39 305.25 3052.49

6 40+510 10 593.12 429.75 4297.52

TOTAL QUANTITY (CUM) 25996.09


QUANTITY OF EXCAVATION FROM CHAINAGE 29+760 TO CHAINAGE 29+820
Average
Sr. No. ChainageLength (meter)
Area (sqm) Area Quantity (cum)
(sqm)
1 29+760 0 96.58 96.58 0.00

2 29+770 10 208.88 152.73 1527.30

3 29+780 10 253.64 231.26 2312.62

4 29+790 10 60.62 157.13 1571.30

5 29+800 10 210.69 135.65 1356.54

6 29+810 10 302.00 256.35 2563.46

7 29+820 10 182.62 242.31 2423.12

TOTAL QUANTITY (CUM) 11754.33


QUANTITY OF EXCAVATION FROM CHAINAGE 38+275 TO CHAINAGE 38+400
Average
Sr. No. ChainageLength (meter)
Area (sqm) Area Quantity (cum)
(sqm)
1 38+275 0 257.72 345.42 0.00

2 38+280 5 222.61 240.17 1200.83

3 38+300 20 246.47 234.54 4690.80

4 38+320 20 286.53 266.50 5330.08

5 38+340 20 311.06 298.80 5975.94

6 38+360 20 227.93 269.50 5389.91

7 38+380 20 182.07 205.00 4100.05

8 38+400 20 318.50 250.29 5005.74

TOTAL QUANTITY (CUM) 31693.35