Elixir Piping Handbook Volume 2 PDF

You might also like

Download as pdf
Download as pdf
You are on page 1of 1
Pace 6 MIPET, Thane Tm aor activites of the plant layout designer to achieve an optmum plant configuration lake place during the study phase of the project. The diagram shown in Figure 12 outlines the sequence of these aélivities, along with the principal input required and output generated. Aithough prejecl schadules often dictale variations in {his apjuoach, it is intended to be an optimum conditions for the most aftective usa of siaffime The study phase can make er break a project. Working oul of Sequence is acceptable within reason. but d it ig gverdene, a project will never recover during the aetall phase. Thé ideal situations Fe ARGS ig to do the jab right the first tre 33 Ske BASIC LAYOUT PHIKGSOPY a Each plant leyguldesigner ciqualops dn. iidividual layotk, philosophy Although cardilrons 42g. a Specifeations, Seeder tee ang. availability of information) ee chénge significanlly amor’ projects, the exignee suo son ins consistent. Qp@ bagic rue to cemgbiber ig fo avoid designing oneine at a tive - that Ig routing a RAG irgm one piece offquipmient lo, another before thinking alt Ihe next one. Athough f isipossibls to complete an-acea detign using this: proach, the cesult is a lace af Gongistency. 3 1 oversee all the piping Bin a given ma | shuld ne 28 Inked before the eesigner pr je,with the as Thid tan-be adFigved throug close review of thé ping, and instrugeantation diagrams and freehi ing ef mayor PIDINg Sonhiguratignsto efrsucé a piping Mall be ceuted ft ap a manner, Plan view Lait, = vs we Both approaches, afer na ang and dev velop Se are workable piping leyours The design in t = Ve at arinrie appr lang up with reyuiring more pipefitings and steel it daveioped as @ Wiait, Fines running én the unit san be upmeriba ie fayoupe Iris approach saves fittings de debe ean nrc gato suppor tha piping It shoud se apted thal the toa atta if there is a likelhosd of future expangien in an a he attemalive to Eee Futuee ining running noth at the same elevation is to change elevation for tha piping fL.nning ast and west to the drums. Allhaugh ils nol alays necessary to plan for future expansion, it can oflen be dona wilh very litle additional affort and cost Each area should he thought on a case-by-case basis.

You might also like