Professional Documents
Culture Documents
SAIC N 2034 InspofRepairstoExtErosResistRefractInst EL Rev
SAIC N 2034 InspofRepairstoExtErosResistRefractInst EL Rev
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Repairs are per the SA Inspection Requirement Form 175-328110 & per SAES-N-110,
A2
Company Approval & SAES-N-120 procedure. See Attachment 1. Para. 11.1.1
The removal of defective lining was restricted to the use of hand tools. SAES-N-120,
B2
Power tools (electric, pneumatic) were not used to remove refractory. Para. 12.4.2
All hexagons adjacent to a repair area were found with sound refractory SAES-N-120,
B3
prior to the execution of the repair (Hammer Test, visual). See Note 2. Para. 12.4.3
Refractory lining cracks (Width of 1/8″ and larger, Depth above 20%) SAES-N-120,
B4
thoroughly excavated to their full depth to sound refractory. See Note 3. Para. 12.4.4
Linings backing surface temperatures are monitored & do not exceed SAES-N-120,
C1
32°C during repairs (this includes curing). Para. 10.1.6
Linings & lining materials are kept above 10°C during the lining SAES-N-120,
C3
application and for a period 48 hours after the lining application. Para. 10.1.9
SAES-N-120,
C4 Surfaces are kept dry after installation (during curing). No spraying!
Para. 10.1.10
Applied linings are allowed an air set (48 hour minimum) & are protected SAES-N-120,
E1
from injury at all times, particularly during the early stages of hardening. Para. 11.2.1
During a 48-hour air set, no water contacts the lining that is sealed from SAES-N-120,
E2
contact with the atmosphere & moist curing is not permitted. Para. 11.2.2
Page 1 of 3
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Inspection of Repairs to Extreme Erosion Resistant
SAIC-N-2034 25-May-05 MECH-
Refractory
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Maximum dryout temperature is controlled & does not reduce chemical SAES-N-120,
F3
composition or mechanical properties of lined equipment materials. Para. 11.3.2
Minimum holding times during dryout are 1 hour per 25 mm refractory SAES-N-120,
F5
thickness, unless otherwise specified by the Refractory Manufacturer. Para. 11.3.4
The repair, testing, and inspection procedure was the same as the SAES-N-120,
G1
procedure used for the original installation. Para. 12.4.3
Independent laboratory & personnel were available on site & present SAES-N-120,
G2
during entire repair process for testing purposes relative to sampling. Para. 12.1.2
At completion of curing & drying of repairs, linings are checked by lightly SAES-N-120,
G3
tapping them with a 1-pound hammer and are acceptable. Para. 12.1.1
Repaired areas are free from lining cracks with a width of 1/8" & larger SAES-N-120,
G4
and a depth of more than 20% of refractory thickness. Para. 12.4.4
REMARKS:
Page 2 of 3
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Inspection of Repairs to Extreme Erosion Resistant
SAIC-N-2034 25-May-05 MECH-
Refractory
Attachment 1 -- SA INSP FORM 175-328110
Page 3 of 3