Professional Documents
Culture Documents
First Day (December 17, 2018) (Monday) : Formatted: Top: (Custom, Accent 5, 30.8 PT Line
First Day (December 17, 2018) (Monday) : Formatted: Top: (Custom, Accent 5, 30.8 PT Line
8 pt Line
width), Bottom: (Custom, Accent 5, 30.8 pt Line width),
Left: (Custom, Accent 5, 30.8 pt Line width), Right:
(Custom, Accent 5, 30.8 pt Line width)
Formatted: Font: Bold
Formatted: Left
On the first Day of my Industrial Work Emersion, me and my fellow classmate (co-OJTs)
were introduced by our adviser and also the coordinator of Work Immersion of our school in
Computer System Servicing (CSS) Ma’am Sheryl S. Sualibio to the owner of the business. We
were having 4 weeks Emersion (20 Days). After we’ve meet the owner of the business we have a
brief orientation about the Do’s and Don'ts during the Imersion, he also made 3 groups and after
the groupings every group go to their station, the group 1 go to the first station which is “Sales”,
and the second group go to the second station which is the “Repairing Station” and the group 3
go to the last station which is the “Computer Room”. I’m included in group 1.
On my first day on the first station which is the sales I feel a little nervous, I afraid to
welcome costumers because as all we know first day is full of nervous but to exciting.
One of the stuff thought us how to Xerox on the Xerox machine, she thought us how to
adjust the paper size and Xerox a paper that not exact size of long and short.
On my first day at my Work Emersion, I’ve been too busy whole day just doing a
photocopy of I.D, Birth Certificate, Etc.
Second Day (December 18,2018) (Tuesday)
On my second day at my work emersion at Bestfreind cyber Net Enterprise. I’m on the
2nd station which is the Repair Station, they introduced us to the technician. After introducing
oneself. One of the technician gave us a brand new case and part of a system unit, he said we will
assemble the system unit that given to us. He assisted on assembling the system unit. After
assembling the system unit. he told us that the next thing we will do is to install a windows 10
OS. After installing a windows 10 OS, we need to install the apps like Microsoft office, mozilla
firefox, antivirus and many more. after that its finish.
After I complete the assembling and programming of the brand new system unit I’ll go to the
Computer Station and have some photo copy of papers of the costumer. A new costumer came
and she said that she need to laminate her I.D so I told her that I can laminate her I.D.
By the way there are 5 technicians on the repair station Mr. Cesar Pago the technician
Supervisor, Mr. Elpidio San Juan, Richard O. Salinas, Jeremie Garcia, Kenneth Pizzaro they are
the staffs at the repair station and Mr. Sony Sapico the technician on Cellular Phone, Ma’am
Julie ann Timanel She is the messenger or the adm. Aide and the driver of the are technician Mr.
Caleb Torres and Mr. Jay Eel Tanteo.
All of the technician thought us all they know and what we need to learn.
Third Day (December 19, 2018) (Wednesday)
On my third day, I assembled again a brand new system unit and installed windows 10
and also I installed the necessary apps that need for computer. Apps like chrome, firefox, anti-
virus, etc.
Sa ika apat na araw ko sa aking pag Immersion ay nag xerox ako ng mga papers ng ga
costumers at naglaminate din ako pagkatapos ko gawing ang mga bagay na iyon ay pumunta ako
sa station ng na aayos ng cellphone at nagpaturo kung papano mag format ng cellphone.
Sa ikalimang araw ko naman sa pag I’Immersion ay naging abala ako sa pag photocopy
ng mga papers ng mga costumer at nag print rin ako ng mga forms para sa examination sa state
kasi maraming kumukuha ng form. After ko mag photocopy at magprint ay pumunta ako ng
repair station at pinaassemble ako ng bagong system unit ng isa sa mga technician at after
assembling the system ay ipinrogram ko na ito at nag install ng mga needed na application for a
computer specially a Microsoft office.
Sixth Day (December 22, 2018) Saturday
Sa ikaanim na araw ko sa Bestfriend ay nagging busy ako sa pag xerox, pag print at pag
encode ng mga papers ng costumer. Pagkatapos ng mga iyon ay pumunta ako ng repair station at
may isang printer na nais ipa generate ng costumer at binigay saakin ang Gawain na iyon ng
technician at tinuruan ako kung pano mag generate ng printer. Nagawa at natapos ko ang pag
generate ng printer ng tama.
Sa ikapitong araw ko sa Bestfriend bilang isang mag aaral na nag Immersion ay nag
scan at nag encode ako ng mga papers ng mga costumers.
On my 8th day naman ay nag program ako ng bagong billing laptop na acer after mag
program ay nag install ako ng mga necessary application for the laptop. Pagkatapos ko iprogram
ang laptop ay nag generate ako ng Epson L360 na printer.
Sa ika Siyam na araw ko bilang nag oOJT sa Bestfriend ay bung maghapon kami nag
install ng CCTV sa DAR.
Tenth Day (December 29, 2018) Saturday
On 10th day naman ay hindi na kami ppinapasok sa bestfriend dahil sa may typhoon na
dumating .
Sa ika labing isang araw naman ay mejo mahina ang costumer dahil kakasapit palang ng
bagong taon at ang tanging nagawa ko lamang ay nag generate pagkatapos ay nagpaturo ako
kung pano mag reset ng printer.
Twentieth Day (January 12, 2019) Saturday Formatted: Font: 14 pt, Italic, Underline
Formatted: Centered
On the twentieth day or last day ko sa Bestfriend ay nag generate ako ng
printer, I also program a new acer laptop. On the last day ay nag picture kami
kasama ng mga staff, technician at ng may ari ng shop bilang patunay an we
complete the 20 days Immersion and yung picture ay mag sisilbi na ring
remembrance na aming madadala kung ano ang nagging karanasan namin as a
Immersion student sa Bestfriend Cyber Net Interprise. Formatted: Font: 14 pt, Not Italic