MODULE-2

THE GREEDY METHOD

THE GENERAL METHOD:

DAA, Module-2 Page 1


DAA, Module-2 Page 2
Example for Greedy Method:

KNAPSACK PROBLEM:

Algorithm for Knapsack Problem:

DAA, Module-2 Page 3


Three feasible solutions are,

Out of three feasible solutions, solution 4 yields maximum profit. This solution is an optimal solution for
a given problem. All the solutions are shown below.

2st Feasible solution: Select the objects according to decreasing order of their profits.

DAA, Module-2 Page 4


3rd Feasible solution: Select the objects according to increasing order of their weights.

4th Feasible solution: Select the objects according to decreasing order of their profit/weight(pi/wi)

DAA, Module-2 Page 5


JOB SEQUENCING WITH DEADLINES :

DAA, Module-2 Page 6


Using greedy method to get an optimal solution:

DAA, Module-2 Page 7


OPTIMAL STORAGE ON TAPES:

DAA, Module-2 Page 8


DAA, Module-2 Page 9
MINIMUM COST SPANNING TREE:

DAA, Module-2 Page 10


For any problem, there are some greedy methods that are useful for finding minimum cost spanning
tree. These methods are,
 Prim’s Algorithm
 Kruskal’s Algorithm

PRIM’S ALGORITHM:

DAA, Module-2 Page 11


DAA, Module-2 Page 12
KRUSKAL’S ALGORITHM :
In this, always minimum coat edge has to be selected. It is not necessary to select the edge from already
connected vertices.

DAA, Module-2 Page 13


Algorithm :

DAA, Module-2 Page 14


SINGLE SOURCE SHORTEST PATHS (Dijkstra’s Algorithm):

DAA, Module-2 Page 15