Combine PDF
Environmental
Likelihood
Damage
task or Work Procedures and Safety
to danger. (OHS Act) or low)
activity Guidelines)
Driving Driver not Accident, Medical Employment controls for C 2 2 6 H Zero accidents/incidents
competent, condition persons required to do related to driving,
wrong driving. (License, alert, obeys monitor via near miss
posture, falling Traffic Act.) Safe driving reports, audits,
asleep techniques, Warning of use of inspections. Evaluated
Drunk driver drugs, fatigue controls. monthly
Speeding Driver Accident, fatalities, Clear speed regulation signs, c 3 4 6 H Zero accidents/incidents
disobeying, medical condition visible traffic control vehicles related to driving,
road rules and on site, law enforcement monitor via near miss
signs,driver authorities, security officers reports, audits,
overtaking on inspections. Evaluated
stop and go’s monthly
23-03-2012
Title: RISK ASSESSMENT FIBRECO PROJECT
Environmenta
Health&Safet
Likelihoo
Damag
d
e
y
l
Task or "hazard" means a (1 – (High,
for Risks to refer to the applicable Safe
activity source of or exposure 25) Medium
task or Work Procedures and Safety
to danger. (OHS Act) or low)
activity Guidelines)
23-03-2012
Title: RISK ASSESSMENT FIBRECO PROJECT
Likelihood
task or Work Procedures and Safety
Damage
to danger. (OHS Act) or low)
activity Guidelines)
23-03-2012
Title: RISK ASSESSMENT FIBRECO PROJECT
Likelihood
task or Work Procedures and Safety
Damage
to danger. (OHS Act) or low)
activity Guidelines)
accidents.
People working too
close to side of road
and being hit by
vehicles.
Flagman Roadside Run over by vehicles. Training, Use of correct PPE C 3 4 12 H adhered to Areas to be
when entering the kept clear, discussed at
construction site. (High visible HSE meetings.
clothing, Safety shoes, etc.)
Safety Signage, Induction
Delivery Work Area Obstruction of traffic, Flagman to control traffic, c 3 3 8 M No reported incidents,
vehicles/ accident, derailment, bunksman to direct vehicles, monitored via
offload and Hazard communication suggestions, audits,
loading signage inspections.
Rainy Roadside Slippery road Correct signage, avoid oil c 4 4 12 H No reported incidents,
Conditions accidents, legal liability, spillage, speed control, monitored via
losses suggestions, audits,
inspections.
23-03-2012
Title: RISK ASSESSMENT FIBRECO PROJECT
Likelihood
task or Work Procedures and Safety
Damage
to danger. (OHS Act) or low)
activity Guidelines)
Construction Road closure vehicles not adhering to Temporary Speed humps, c 5 5 12 H No reported incidents,
close to stop/go signs security personnel, highway monitored via
roadside patrol suggestions, audits,
inspections.
Workers and roadside Accidents, run over by Road signage, Induction c 5 5 12 H No reported incidents,
civilians vehicles, Injuries, control, monitored via
working or fatalities suggestions, audits,
passing the inspections.
roadside
Emergency Work area or Collision/ Derailment Flagman to direct traffic, c 3 3 9 M No reported incidents,
vehicles roadside Induction training, monitored via
23-03-2012
Title: RISK ASSESSMENT FIBRECO PROJECT
Environmental
Task or "hazard" means a (1 – (High,
to refer to the applicable Safe
activity for Risks source of or exposure 25) Medium
Likelihood
task or Work Procedures and Safety
Damage
to danger. (OHS Act) or low)
activity Guidelines)
suggestions, audits,
inspections.
Construction Dust and Diseases and disability. Personnel Protection Equipment c 3 2 9 M No reported incidents,
works close to Noise Use of correct PPE when entering monitored via
road the construction site. (High visible suggestions, audits,
clothing, Safety shoes, etc.) inspections.
23-03-2012
Title: RISK ASSESSMENT FIBRECO PROJECT
23-03-2012
Title: RISK ASSESSMENT FIBRECO PROJECT
1. SEVERITY INDEX
2 – Minor risk of injury, illness not a lost time, non disruptive property damage, quality/production problems resulting
in loss between R1 000-00 – R10 000-00.
4 – Risk of a lost time injury without permanent disability, disruptive property damage quality / production or other
losses between R10 000-00 – R50 000-00.
6 – Risk of permanent disabling injury, loss of life/body part or other losses exceeding R50 000-00.
2. Frequency Index
PERSON
FEW 1 1 2
MODERATE NO. 1 2 3
MANY 2 3 3
3. Probability Index
-1 Low probability
0 Moderate probability
+1High probability
Factors to be Considered
23-03-2012
Title: RISK ASSESSMENT FIBRECO PROJECT
- Complexity of task
- Any rating above 8 will require actions to address issues e.g. procedures, guarding, training etc.
PRIORITY GUIDE
Once a risk rating has been calculated, the following scheme should be used to assign priority of action. It should be
noted that if action is not taken within the time specified, then the continued toleration of the residual ‘downside’ risk
should be explicitly authorized. The suggested level of seniority for authorization is as shown below.