Title: RISK ASSESSMENT FIBRECO PROJECT

No.: BRN-HSE-ZTE-PLN-012 - Rev 2

SAFETY, HEALTH AND ENVIRONMENTAL RISK ANALYSIS

Location or Controls to eliminate or Severity Risk Risk Target/objective


Hazards Value Assessed
conditions mitigate the Risk. (Also

Environmental

Health & Safety


Task or "hazard" means a (1 – (High,
for Risks to refer to the applicable Safe
activity source of or exposure 25) Medium

Likelihood

Damage
task or Work Procedures and Safety
to danger. (OHS Act) or low)
activity Guidelines)

Driving Driver not Accident, Medical Employment controls for C 2 2 6 H Zero accidents/incidents
competent, condition persons required to do related to driving,
wrong driving. (License, alert, obeys monitor via near miss
posture, falling Traffic Act.) Safe driving reports, audits,
asleep techniques, Warning of use of inspections. Evaluated
Drunk driver drugs, fatigue controls. monthly

Speeding Driver Accident, fatalities, Clear speed regulation signs, c 3 4 6 H Zero accidents/incidents
disobeying, medical condition visible traffic control vehicles related to driving,
road rules and on site, law enforcement monitor via near miss
signs,driver authorities, security officers reports, audits,
overtaking on inspections. Evaluated
stop and go’s monthly

23-03-2012
Title: RISK ASSESSMENT FIBRECO PROJECT

No.: BRN-HSE-ZTE-PLN-012 - Rev 2

Location or Controls to eliminate or Severity Risk Risk Target/objective


Hazards Value Assessed
conditions mitigate the Risk. (Also

Environmenta

Health&Safet
Likelihoo

Damag
d

e
y
l
Task or "hazard" means a (1 – (High,
for Risks to refer to the applicable Safe
activity source of or exposure 25) Medium
task or Work Procedures and Safety
to danger. (OHS Act) or low)
activity Guidelines)

Working on Adjacent to Obstruction of Protection of the public and C 4 4 12 M No reported incidents,


site, Public construction signage, creation of controls for entering an area monitored via
Safety sites fall hazards, material where workers are working at suggestions, audits,
Awareness falling from vehicles, elevations. Where necessary, inspections.
vehicle accidents near post a flagman to safely direct
work areas, passing traffic and
obstruction of pedestrians. Never allow
roadway and cranes to load and unload
pavements. vehicles over passing traffic or
pedestrians. Construct
temporary protective gantries
or covered walkways to
provide protection when
workers are working above
areas where the public or
other workers need to pass.
Barricade areas under cranes
to separate passing traffic

23-03-2012
Title: RISK ASSESSMENT FIBRECO PROJECT

No.: BRN-HSE-ZTE-PLN-012 - Rev 2

Location or Controls to eliminate or Severity Risk Risk Target/objective


Hazards Value Assessed
conditions mitigate the Risk. (Also

Health & Safety


Environmental
Task or "hazard" means a (1 – (High,
for Risks to refer to the applicable Safe
activity source of or exposure 25) Medium

Likelihood
task or Work Procedures and Safety

Damage
to danger. (OHS Act) or low)
activity Guidelines)

from crane-lifted loads.


Traffic control around
excavations and trenching –
Barriers, hazard cones, signs,
flagmen, two-way radios, etc.
as per risk assessment.

Traffic Roadsides Traffic accidents Traffic management plan to C 3 3 9 M No reported incidents,


management resulting in injuries or be adhered to, induction monitored via
fatalities and property training, RA training, signs, suggestions, audits,
damage. flagmen, proper supervision inspections. Traffic
Failure of drivers to management plan to be
adhere to safety adhered to Areas to be
signage, flagmen kept clear, discussed at
resulting in injury. HSE meetings.
Workers not adhering
to traffic management
plan requirements and
being involved in

23-03-2012
Title: RISK ASSESSMENT FIBRECO PROJECT

No.: BRN-HSE-ZTE-PLN-012 - Rev 2

Location or Controls to eliminate or Severity Risk Risk Target/objective


Hazards Value Assessed
conditions mitigate the Risk. (Also

Health & Safety


Environmental
Task or "hazard" means a (1 – (High,
for Risks to refer to the applicable Safe
activity source of or exposure 25) Medium

Likelihood
task or Work Procedures and Safety

Damage
to danger. (OHS Act) or low)
activity Guidelines)

accidents.
People working too
close to side of road
and being hit by
vehicles.

Flagman Roadside Run over by vehicles. Training, Use of correct PPE C 3 4 12 H adhered to Areas to be
when entering the kept clear, discussed at
construction site. (High visible HSE meetings.
clothing, Safety shoes, etc.)
Safety Signage, Induction

Delivery Work Area Obstruction of traffic, Flagman to control traffic, c 3 3 8 M No reported incidents,
vehicles/ accident, derailment, bunksman to direct vehicles, monitored via
offload and Hazard communication suggestions, audits,
loading signage inspections.

Rainy Roadside Slippery road Correct signage, avoid oil c 4 4 12 H No reported incidents,
Conditions accidents, legal liability, spillage, speed control, monitored via
losses suggestions, audits,
inspections.

23-03-2012
Title: RISK ASSESSMENT FIBRECO PROJECT

No.: BRN-HSE-ZTE-PLN-012 - Rev 2

Location or Controls to eliminate or Severity Risk Risk Target/objective


Hazards Value Assessed
conditions mitigate the Risk. (Also

Health & Safety


Environmental
Task or "hazard" means a (1 – (High,
for Risks to refer to the applicable Safe
activity source of or exposure 25) Medium

Likelihood
task or Work Procedures and Safety

Damage
to danger. (OHS Act) or low)
activity Guidelines)

vehicles Roadside Injuries Site manager/Project manager or c 3 3 9 M No reported incidents,


parking at the Fatalities authority on site to speak to the monitored via
side of the Legal liability driver. suggestions, audits,
road Production/Serves inspections.

Construction Road closure vehicles not adhering to Temporary Speed humps, c 5 5 12 H No reported incidents,
close to stop/go signs security personnel, highway monitored via
roadside patrol suggestions, audits,
inspections.

Workers and roadside Accidents, run over by Road signage, Induction c 5 5 12 H No reported incidents,
civilians vehicles, Injuries, control, monitored via
working or fatalities suggestions, audits,
passing the inspections.
roadside

Emergency Work area or Collision/ Derailment Flagman to direct traffic, c 3 3 9 M No reported incidents,
vehicles roadside Induction training, monitored via

23-03-2012
Title: RISK ASSESSMENT FIBRECO PROJECT

No.: BRN-HSE-ZTE-PLN-012 - Rev 2

Location or Controls to eliminate or Severity Risk Risk Target/objective


Hazards Value Assessed

Health & Safety


conditions mitigate the Risk. (Also

Environmental
Task or "hazard" means a (1 – (High,
to refer to the applicable Safe
activity for Risks source of or exposure 25) Medium

Likelihood
task or Work Procedures and Safety

Damage
to danger. (OHS Act) or low)
activity Guidelines)

suggestions, audits,
inspections.

Construction Dust and Diseases and disability. Personnel Protection Equipment c 3 2 9 M No reported incidents,
works close to Noise Use of correct PPE when entering monitored via
road the construction site. (High visible suggestions, audits,
clothing, Safety shoes, etc.) inspections.

23-03-2012
Title: RISK ASSESSMENT FIBRECO PROJECT

No.: BRN-HSE-ZTE-PLN-012 - Rev 2

23-03-2012
Title: RISK ASSESSMENT FIBRECO PROJECT

No.: BRN-HSE-ZTE-PLN-012 - Rev 2

THIS MATRIX MUST BE USED TO RATE THE CRITICALITY OF TASKS

1. SEVERITY INDEX

0 – No risk of injury, illness or quality / problems.

2 – Minor risk of injury, illness not a lost time, non disruptive property damage, quality/production problems resulting
in loss between R1 000-00 – R10 000-00.

4 – Risk of a lost time injury without permanent disability, disruptive property damage quality / production or other
losses between R10 000-00 – R50 000-00.

6 – Risk of permanent disabling injury, loss of life/body part or other losses exceeding R50 000-00.

2. Frequency Index

NO TIMES TASK PERFORMED BY EACH

PERSON

NO OF PERSONS PERFORMING LESS THAN FEW TIMES MANY TIMES

TASK DAILY PER DAY PER DAY

FEW 1 1 2

MODERATE NO. 1 2 3

MANY 2 3 3

3. Probability Index

-1 Low probability

0 Moderate probability

+1High probability

Factors to be Considered

- How dangerous is the task

23-03-2012
Title: RISK ASSESSMENT FIBRECO PROJECT

No.: BRN-HSE-ZTE-PLN-012 - Rev 2

- How difficult is the task

- Complexity of task

- The chance that there will be a loss if task is performed improperly

- Any rating above 8 will require actions to address issues e.g. procedures, guarding, training etc.

PRIORITY GUIDE

Once a risk rating has been calculated, the following scheme should be used to assign priority of action. It should be
noted that if action is not taken within the time specified, then the continued toleration of the residual ‘downside’ risk
should be explicitly authorized. The suggested level of seniority for authorization is as shown below.

Priority Risk Suggested action Authority for continued


toleration of residual risk
Rating

1 Greater than 8 Cessation until the residual risk is PD


reduced to 8 or below - unless
exposure is authorized as
indicated.

2 6–8 Take action to reduce residual risk PD


to 6 or below

3 4–6 Specific action to deal with risk PD


daily

4 2–4 Plan in keeping with all other PD


priorities

5 Below 2 Low priority PD

Related Documents

Document Ref. Document Title


ZTE-HSE-FBC-PLN- EHS Management Plan ZTE project
001Rev 1

23-03-2012