space. |f a vertical manifold that fs supporied fram the column is used selina.
spuur 14 available for other piping systems ar operatar acoess.
The client must live with the plant long afler the engineering and construction piuinas
are over Tha operators will be walking through the facility each day and will be
continually reminded of who took the time and effart to plan tha project thorswatly
and they will keep that in mind shod Gg Oe @xpansion is planned.
TER NOLOGY
ABBREVATIONS, SANDAL DS, AND. IE
This section aetines id. siimmanzes (ha abbreviations, athe, and tennire ay
used trough aatt inthis Courseigeeerial { .
The fallowing abbreviations are Ged in jon and inusteanon
+ AG —Aboje ground -
ANS! — Afherican Nati dards institute,
ASME, - American Soci Es Engibedis
BBP Botjom of base Ee Jats
BL ~Battory imit
CL Ganteyine a
EL - Elevati -
ARI = Irie ‘ak Risk Insaaes ~ .
N- i » us
OD _ oui 2
hb - Diameter ae tinea e iE
NEPA — National sg Bssociation,
NPSHI— Net Positive, Suction Head
PRIO Piping an ‘
POS . Paint Or supptiy~
TL - Tangent line
TOS - Top OF Stee!
TP - Typical
UG — Underground
1g — Inctian Standacd