Professional Documents
Culture Documents
000 DG Ic04 0133
000 DG Ic04 0133
000 DG Ic04 0133
BY PIPING
IMC567 IMC567 BY INSTRUMENTS
IMC567
L
FLOW
L H H
IMC567
NOTE 4
MINIMUM
24" MAX
SIT493 SIT493
SIT493 SIT493 IMC567 IMC567
MINIMUM
FLOW
IMC567
SEE DETAIL "A"
IMC567
TIME: 10:17:15
DETAIL 'A'
24" MAX NOTE 4
HOOK-UP: FT-STD-027
3. INSTRUMENT TUBING TO BE FIELD ROUTED AND SUPPORTED LIQUID SERVICE - LINE MOUNT
AS REQUIRED.
4. MANIFOLD & MOUNTING BRACKET SUPPLIED WITH TRANSMITTER. CARTAGENA EXPANSION PROJECT
0 ISSUED FOR CONSTRUCTION GC DS GN 08-Oct-10
THIS DOCUMENT IS THE PROPERTY OF CHICAGO BRIDGE & IRON COMPANY ("CB&I"). IT MAY CONTAIN INFORMATION DESCRIBING TECHNOLOGY
OWNED BY CB&I AND DEEMED TO BE COMMERCIALLY SENSITIVE. IT IS TO BE USED ONLY IN CONNECTION WITH WORK PERFORMED BY CB&I.
REPRODUCTION IN WHOLE OR IN PART FOR ANY PURPOSE OTHER THAN WORK PERFORMED BY CB&I IS FORBIDDEN EXCEPT BY EXPRESS WRITTEN
PERMISSION OF CB&I. IT IS TO BE SAFEGUARDED AGAINST BOTH DELIBERATE AND INADVERTENT DISCLOSURE TO ANY THIRD PARTY.
FOR: Refineria de Cartagena S.A.
DRAWN: CK'D: APPD: DATE: SCALE:
NO. REVISION DRAWN CK'D APPD DATE
GC DS GN 19-Jul-10 N/A PROJ NO: 166000 DWG NO: 000-DG-IC04-0133 REV: 0