The document provides a schedule of work for roof repair with 8 items. It involves inspecting the dome roof and ceiling frame for cracks, rot, and damage and making replacements. It also involves inspecting and repairing the remaining roof area, timber roof structure, and adding a galvanized iron flashing system. Further repairs to valance boards and installing a galvanized iron gutter and downpipe system are also included.
The document provides a schedule of work for roof repair with 8 items. It involves inspecting the dome roof and ceiling frame for cracks, rot, and damage and making replacements. It also involves inspecting and repairing the remaining roof area, timber roof structure, and adding a galvanized iron flashing system. Further repairs to valance boards and installing a galvanized iron gutter and downpipe system are also included.
The document provides a schedule of work for roof repair with 8 items. It involves inspecting the dome roof and ceiling frame for cracks, rot, and damage and making replacements. It also involves inspecting and repairing the remaining roof area, timber roof structure, and adding a galvanized iron flashing system. Further repairs to valance boards and installing a galvanized iron gutter and downpipe system are also included.
Check for cracks on roof sheets, damaged ridges, valley gutters, R -1 Inspection of the dome roof above the alter check for shortage of ‘J’ bolts and washers and repair accordingly. Check for rotted timber members of the ceiling frame system and replace same where necessary, R-2 Checking frame system of the ceiling above the alter complete with application of wood preservatives, re-fixing back the ceiling panels etc. Check for cracked roofing sheets, ridges, valley gutters, ‘J’ bolts and R-3 Inspections of the rest of the roof area washers and effect repairs to them. Inspect, replace all rotted and damaged 4”x 2” Palmyra rafters where ever necessary (As per the instructions already given), R-4 Repairs to the exciting timber roof structure application of 02 coats wood preservatives after thoroughly cleaning surface on the entire roof timber structure Introduction of a galvanised iron flashing system (As per the given R-5 Flashing system details) on all surfaces where ever the roof meets the wall fixed firmly on to the wall. Repairs to be executed to the existing valance and barch boards with all necessary modifications to receive the GI R-6 Repairs to the existing valance and barch boards Gutter system complete with application of 02 coats od AL primer and 02 coats of enamel paints of an approved colour. Fixing of the GI gutter system firmly fixed on to the valance R-7 Fixing of the GI Gutter system board using steel bracket system (Painted with 02 coats of anti- corrosive) at 2’0” CC Fixing the GI down pipe system firmly on to the wall using Steel R-8 Fixing of GI down piping bracket system (Painted with 02 coats of anti-corrosive) at 2’0” CC and hanging SS chains.