Refractory Installation Preparation Guidelines 2.1 Preparation Prior To The Refractory Installation in The Cement Rotary Kiln
Refractory Installation Preparation Guidelines 2.1 Preparation Prior To The Refractory Installation in The Cement Rotary Kiln
Refractory Installation Preparation Guidelines 2.1 Preparation Prior To The Refractory Installation in The Cement Rotary Kiln
11
IN CEMENT INDUSTRY
Chapter 2
Refractory Installation Preparation Guidelines
SRIC
SRIC
Angle
steel
welded
- After the Kiln has been shutdown, allow the Grate Cooler
to continue running for a while until there is as little
clinker left as possible so that it becomes easier to work.
- After 24 hours of kiln shutdown, an inspection of
refractory linings inside the Clinker Cooler can be
REFRACTOTRY INSTALLATION TECHNIQUES
20
IN CEMENT INDUSTRY