Sr. No. Structure Type Drawing no. Title of Drawing No. of Structures Completion Date Status
Sr. No. Structure Type Drawing no. Title of Drawing No. of Structures No. of Drawings No. of Days
Required
Head Regulator Plan
Head Regulator Sections
1 Head Regulator 10 40 30
Head Regulator Sections
Head Regulator Sections
Cross Regulator Plan
2 CrossRegulator Cross Regulator Sections 4 12 12
Cross Regulator Sections
Escape Structure Plan
Escape Structure Sections
3 Escape Structure 1 4 3
Escape Structure Sections
Escape Structure Sections
Proportional Distributor Plan
4 Proportional Distributor 7 14 14
Proportional Distributor Sections
Vertical Fall Plan
5 Vertical Fall 29 58 58
Vertical Fall Sections
Aqueduct Plan and Section
6 Aqueduct 2 4 4
Aqueduct Section and Detail
Drainage Culvert Plan and Section
7 Drainage Culvert 22 44 66
Drainage Culvert Section and Detail
8 Pipe outlet Pipe outlet Plan and Sections 233 233 Table
Total Time required (In Months) 8.5
Note
1 Time schedule has been worked on the basis of one CAD Draft's man.
2 It is subjected to availability of CAD Draft's man.
3 Only Hydraulic Design of Structures/ Arrangement Drawings.
Chart Title
12
10
0
Completion 43199 43203 43208
Date
No. of 10 4 1
Structures
Ti tl e of Hea d Hea d Head Hea d Cros s Cros s Cros s Es ca pe Es ca pe
Drawi ng Regul ator Regulator Regul ator Regul ator Regul ator Regulator Regul ator Structure Pl a n Structure
Pla n Sections Sections Sections Pla n Sections Sections Sections
Drawing no.
Structure Type Hea d Regulator Cross Regul ator Es ca pe Structure