Rencana Anggaran Biaya: NO. Uraian Pekerjaan Satuan Volume Harga Satuan 1 2 3 4 5 I Pekerjaan Persiapan
Rencana Anggaran Biaya: NO. Uraian Pekerjaan Satuan Volume Harga Satuan 1 2 3 4 5 I Pekerjaan Persiapan
II PEKERJAAN TANAH/URUGAN
1 Pek. Galian tanah pondasi M3 122.0 Rp 55,900.00
2 Pek. Urugan Tanah kembali (1/3xgalian tanah pondasi) M3 40.7 Rp 26,792.50
3 Pek. Urugan Pasir di bawah pondasi M3 6.1 Rp 625,975.00
4 Pek. Urugan Pasir di bawah lantai M3 102.6 Rp 625,975.00
5 Pek. Urugan sirtu di bawah lantai / Peninggian lantai M3 68.8 Rp 442,937.50
IV PEKERJAAN BETON
1 Pek. Footplat M3 5.25 Rp 6,795,401.13
2 Pek. Lantai Kerja Footplate M3 0.06 Rp 201,010.00
3 Pek. Sloof beton 20/25 M3 4.33 Rp 12,781,834.20
4 Pek. Sloof beton 15/20 M3 1.07 Rp 13,186,441.56
5 Pek. balok beton 20/20 cm M3 3.46 Rp 18,444,344.63
6 Pek. balok beton 15/20 cm M3 1.07 Rp 19,700,092.52
7 Pek. Ring Balok 20/20 cm M3 3.46 Rp 18,444,093.00
8 Pek. Ring Balok 15/20 cm M3 1.07 Rp 19,700,092.52
9 Pek. Kolom beton utama 25/25 cm M3 5.00 Rp 11,699,459.67
10 Pek. Kolom beton praktis 15/15 cm M3 1.53 Rp 21,326,410.71
11 Pek Cor Lantai Beton Tumbuk M3 17.88 Rp 1,493,490.53
IX PEKERJAAN SANITASI
1 Kloset Duduk BUAH 3.0 Rp 2,172,150.00
2 Flor Drain BUAH 3.0 Rp 69,937.50
3 Memasang Pipa Galvanis diameter 1/2" M 20.0 Rp 116,511.34
4 Memasang pipa PVC tpe AW diameter 4" M 20.0 Rp 264,253.51
5 Septtang+ Resapan LS 1.0 Rp 3,000,000.00
6 TANDON 1100 lt bh 2.0 Rp 1,500,000.00
6
1
2
3
4
5
6
A PUTRI TOLIKARA
JUMLAH HARGA
Rp 6,300,000.00 371.8
Rp 11,184,264.60 80.0
Rp 6,819,800.00
Rp 1,089,561.67
Rp 3,812,187.75 465
Rp 64,244,766.98
Rp 30,484,619.77
Rp 9,482,108.40
Rp 68,441,187.94
Rp 217,997,182.00
Rp 71,328,847.20
Rp 3,944,664.50
Rp -
Rp 35,675,855.94
Rp 12,161.11
Rp 55,281,432.93
Rp 14,043,560.26
Rp 63,817,432.42
Rp 20,980,598.54
Rp 63,816,561.79
Rp 20,980,598.54
Rp 58,497,298.35
Rp 32,629,408.39
Rp 26,703,610.59
Rp 8,616,197.30
Rp 6,298,634.30
Rp 25,189,665.58
Rp 30,340,643.84
Rp 14,557,919.42
Rp 18,678,892.69
Rp 4,893,808.70
Rp 12,895,694.06
Rp 2,557,197.50
Rp 26,206,510.50 x
Rp 2,941,601.55 168701.688613
6858.23
261
29850
Rp 43,181,283.08 98750
Rp 1,534,680.46 28480
Rp 1,282,443.25 48,249.50
Rp 762,805.92
Rp 11,252,125.00
Rp 397,375.00
Rp 1,000,000.00
Rp 2,266,162.50
Rp 1,522,005.00
Rp 2,902,270.00
Rp 20,000,000.00
29.5
42.8
Rp 6,516,450.00
Rp 209,812.50
Rp 2,330,226.89
Rp 5,285,070.17 ###
Rp 3,000,000.00
Rp 3,000,000.00
Rp 2,139,375.00
Rp 1,990,976.04
Rp 1,896,380.83
Rp 1,048,526.94
Rp 1,048,526.94
Rp 10,000,000.00
VIII PEKERJAAN KOLAM RENANG
1 Cor Lantai Tumbuk 1:3:5
2 Cor Dinding Beton
3 Pas granit 60/60 kasar
4 Timbunan kolam dan Taman
###
AN KOLAM RENANG
Tumbuk 1:3:5 M3 4.4 #REF! #REF!
M3 6.4 ### ###
60/60 kasar M2 72.3 ### ###
kolam dan Taman M3 134.4 ### ###
#REF!
ANALISA HARGA SATUAN
STANDAR NASIONAL INDONESIA
(SNI)
HARGA SATUAN
NO. URAIAN PEKERJAAN KUANTITAS SATUAN
( Rp )
PEKERJAAN PENDAHULUAN
PEKERJAAN TANAH
1M3 Galian Tanah Biasa sedalam 1M SNI 2835:2008 (6.1)
1
Pekerja 0.4000 Oh 120,000.00
Mandor 0.0400 Oh 197,500.00
PEKERJAAN PONDASI
1M3 Pasang Pondasi Batu Kali 1:4
Batu belah 15/20 Cm 1.1000 M3 545,000.00
Semen Pc 163.0000 Kg 2,100.00
Pasir Pasang 0.5200 M3 545,000.00
Pekerja 1.5000 Oh 120,000.00
Tukang Batu 0.6000 Oh 160,000.00
Kepala Tukang 0.0600 Oh 175,000.00
Mandor 0.0750 Oh 197,500.00
1M3 Pasang Pondasi Batu Kosong SNI 2836:2008 (6.9)
Batu belah 15/20 Cm 1.2000 M3 545,000.00
Pasir Urug 0.3000 M3 490,000.00
Pekerja 0.7800 Oh 120,000.00
Tukang Batu 0.3900 Oh 160,000.00
Kepala Tukang 0.0390 Oh 175,000.00
Mandor 0.0390 Oh 197,500.00
PEKERJAAN PASANGAN
1 M2 Lantai Keramik 20 cm x 20 cm (SNI 7395:2008, Pasal 6.6)
Tegel Keramik (20x20) 26.500 Bh 13,500.00
Semen 10.400 Kg 2,100.00
Pasir Pasang 0.045 M3 545,000.00
Semen Warna 1.620 Kg 23,000.00
Pekerja 0.270 Oh 120,000.00
Tukang Batu 0.135 Oh 160,000.00
Kepala Tukang 0.014 Oh 175,000.00
Mandor 0.014 Oh 197,500.00
PEKERJAAN PASANGAN
1 1 m2 Pasang Dinding Batu Tela 1 : 4
Batu tela 16.000 Bh 12,155.00
Semen PC 11.500 Kg 2,100.00
Pasir pasangan 0.043 M³ 545,000
Pekerja 1.5000 Oh 120,000.00
Tukang batu 0.6000 Oh 160,000.00
Kepala tukang 0.0600 Oh 175,000.00
Mandor 0.0750 Oh 197,500.00
PEKERJAAN PLESTERAN
PEKERJAAN BETON
1 M3 Membuat Beton Mutu f'c =14.5 Mpa (K175), Slump (12 ± 2) cm, w/c = 0.66 (SNI 7394:2008, Pasal 6.3)
Semen 326.000 Kg 2,100.00
Pasir Beton 0.543 M3 560,000.00
Koral Beton 0.762 M3 1,040,000.00
Air 215.000 Ltr 922.00
Jumlah I
Pekerja 1.650 Oh 120,000.00
Tukang Batu 0.275 Oh 160,000.00
Kepala Tukang 0.028 Oh 175,000.00
Mandor 0.083 Oh 197,500.00
Jumlah II
Jumlah I + II
Pekerjaan Plafon
1M2 Plafon Gypsum Balok kayu
Kayu Balok 0.023 M3 5,450,000.00
Paku biasa 2" - 5" 0.06 Kg 27,500.00
Gypsum board ( 120 x 240 x 9 ) mm 0.39 Lbr 150,000.00
Paku sekrup 0.11 kg 31,900.00
Pekerja 0.27 Oh 120,000.00
Tukang kayu 0.4 Oh 160,000.00
Kepala tukang 0.04 Oh 175,000.00
Mandor 0.0135 Oh 197,500.00
Jumlah
PEKERJAAN PENGECATAN
1 m2 Pengecatan bidang kayu baru 1 lapis cat dasar, 2 lapis cat penutup
Cat dasar meni kayu 0.2000 ltr 48,620.00
Cat dasar meni kayu 0.1700 ltr 48,620.00
Cat Kilap Kayu 0.2600 Kg 35,750.00
Pekerja 0.0700 Oh 120,000.00
Tukang Cat 0.0900 Oh 160,000.00
Kepala Tukang 0.0060 Oh 175,000.00
Mandor 0.0025 Oh 197,500.00
1 M2 Pengecatan dinding papan baru dengan cat tembok (1 Lapis Cat Dasar, 2 lapis cat penutup)
Cat Dasar 0.1000 Kg 148,005.00
Cat Penutup 2x 0.2600 Kg 148,005.00
Pekerja 0.0200 Oh 120,000.00
Tukang Cat 0.0630 Oh 160,000.00
Kepala Tukang 0.0063 Oh 175,000.00
Mandor 0.0025 Oh 197,500.00
MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL. KAYU - SNI 3434:2008 (6.5)
Kayu Kls1, Papan 0.0400 M3 5,450,000.00
Lem Kayu 0.5000 Kg 27,500.00
Pekerja 1.0000 Oh 120,000.00
Tukang Kayu 3.0000 Oh 160,000.00
Kepala Tukang 0.3000 Oh 175,000.00
Mandor 0.0500 Oh 197,500.00
1 m2 Pasang kaca
Kaca Polos 1.1000 m2 360,000.00
Pekerja 0.0150 Oh 120,000.00
Tukang Kayu 0.1500 Oh 160,000.00
Kepala Tukang 0.0150 Oh 175,000.00
Mandor 0.0008 Oh 197,500.00
1M2 Pasang Pintu Tripleks Rangkap, Rangka Kayu Kls1 - SNI 3434:2008 (6.11)
Kayu Kls1, Papan 0.0196 M3 5,450,000.00
Paku Biasa 1/2"- 1" 0.0300 Kg 27,500.00
Lem Kayu 0.3000 Ltr 23,000.00
Tripleks 1.0000 Lbr -
Pekerja 0.6000 Oh 120,000.00
Tukang Kayu 2.0000 Oh 160,000.00
Kepala Tukang 0.2000 Oh 175,000.00
Mandor 0.0300 Oh 197,500.00
1M2 Pasang Pintu Tripleks Rangkap, Lapis Seng Plat Rangka Kayu Kls1
Kayu Kls1, Papan 0.0196 M3 5,450,000.00
Paku Biasa 1/2"- 1" 0.0300 Kg 27,500.00
Lem Kayu 0.3000 Ltr 23,000.00
Tripleks 1.0000 Lbr -
Seng Plat 1.0000 Lbr -
Pekerja 0.6000 Oh 120,000.00
Tukang Kayu 2.0000 Oh 160,000.00
Kepala Tukang 0.2000 Oh 175,000.00
Mandor 0.0300 Oh 197,500.00
1 M3 Kolom Kayu
Kayu Balok 1.2000 M3 3,150,000.00
Paku Biasa 0.1000 Kg 27,500.00
Pekerja 5.0000 Oh 120,000.00
Tukang Kayu 10.0000 Oh 160,000.00
Kepala Tukang Kayu 1.5000 Oh 175,000.00
Mandor 0.2500 Oh 197,500.00
37,800.00
1,086.80
22,050.00
16,000.00
12,000.00
1,750.00
987.50
91,674.30
12,000.00
9,875.00
21,875.00
48,000.00
7,900.00
55,900.00
63,120.00
10,270.00
73,390.00
23,040.00
3,752.50
26,792.50
60,000.00
9,875.00
69,875.00
588,000.00
36,000.00
1,975.00
625,975.00
408,000.00
30,000.00
4,937.50
442,937.50
599,500.00
342,300.00
283,400.00
180,000.00
96,000.00
10,500.00
14,812.50
1,526,512.50
654,000.00
147,000.00
93,600.00
62,400.00
6,825.00
7,702.50
971,527.50
357,750.00
21,840.00 1 M3 PASANG BALOK INDUK DAN BALOK LANTAI
24,525.00 No. Uraian
37,260.00 A TENAGA
32,400.00
21,600.00
2,450.00
2,765.00
500,590.00
B BAHAN
450,000.00
20,160.00
24,525.00
34,500.00 C PERALATAN
28,800.00
19,200.00
2,100.00 D Jumlah (A+B+C)
2,370.00
581,655.00
No. Uraian
A TENAGA
250,000.00 Pekerja
20,160.00 Tukang
24,525.00 Kepala Tukang
34,500.00 Mandor
28,800.00
19,200.00 B BAHAN
2,100.00
2,370.00
381,655.00
C PERALATAN
194,480.00
24,150.00 D Jumlah (A+B+C)
23,435.00
180,000.00 1 M3 PASANG RANGKA KAYU KLAS I UNTUK DINDING
96,000.00 No. Uraian
10,500.00 A TENAGA
2,100.00 Pekerja
530,665.00 Tukang
Kepala Tukang
Mandor
B BAHAN
27,132.00 balok kals I 10/10
7,085.00 paku Biasa
24,000.00
24,000.00 C PERALATAN
2,625.00
1,975.00
86,817.00 D Jumlah (A+B+C)
B BAHAN
94:2008, Pasal 6.3) papan klas I 2/20
684,600.00 paku Biasa
304,000.00
792,711.11 C PERALATAN
198,230.00
1,979,541.11
198,000.00 D Jumlah (A+B+C)
44,000.00
4,900.00
16,392.50
263,292.50 No. Uraian
2,242,833.61 A TENAGA
Pekerja
Tukang
21,525.00 Kepala Tukang
487.50 Mandor
22,012.50
840.00 B BAHAN
1,120.00 paku Tripleks
122.50 Tripleks 3 mm
79.00
2,161.50 C PERALATAN
24,174.00
D Jumlah (A+B+C)
126,000.00
8,250.00
6,500.00
140,750.00
62,400.00
41,600.00
4,550.00
5,135.00
113,685.00
254,435.00
126,000.00
8,250.00
6,500.00
140,750.00
62,400.00
41,600.00
4,550.00
5,135.00
113,685.00 0.04 1
254,435.00 -
-
-
47,250.00 -
126,000.00 -
11,000.00 -
13,000.00 0.04 -
3,300.00 1
186,872.55 25 2
387,422.55 -
12,000.00 -
40,000.00 -
4,375.00 -
987.50 -
57,362.50 -
444,785.05
56,700.00
126,000.00
11,000.00
13,000.00 Bahan
77,000.00
200,000.00
483,700.00
79,200.00
52,800.00 Tenaga
5,775.00
6,517.50
144,292.50
627,992.50
2,766.00
6,000.00 Bahan
8,766.00
2,242,833.61
3,626,100.00 Tenaga
895,611.20
30,856.32
6,795,401.13
11,671,758.35
3,148,581.63
376,708.88
9,232.74
15,206,281.60
2,242,833.61
6,518,775.34
2,798,785.00
96,426.00
11,656,819.96
2,242,833.61
7,892,150.24
3,731,713.33
128,568.00
13,995,265.19
2,242,833.61
9,197,167.52
6,907,917.50 1 M2 Lantai Keramik 40 cm x 40 cm (SNI 7395:2008, Pas
96,426.00 Bahan
18,444,344.63
2,242,833.61
6,136,997.30 Tenaga
2,239,028.00
77,140.80
10,695,999.71
2,242,833.61
7,892,150.24
9,210,556.67
354,552.00
19,700,092.52
2,242,833.61
5,583,307.62
5,232,067.83
128,232.50
13,186,441.56
2,242,833.61
6,518,775.34
3,924,050.87
96,174.38
12,781,834.20
2,242,833.61
9,197,167.52
6,907,917.50
96,174.38
18,444,093.00
2,242,833.61
3,911,831.31
3,261,757.03
160,290.63
9,576,712.57
2,242,833.61
5,382,227.00
3,914,108.44
160,290.63
11,699,459.67
2,242,833.61
5,780,083.98
13,047,028.12
256,465.00
21,326,410.71
2,242,833.61
3,911,831.31
4,605,278.33
64,116.25
10,824,059.50
2,242,833.61
5,583,307.62
6,907,917.50
96,174.38
14,830,233.11
2,242,833.61
3,931,095.30
3,453,958.75
48,087.19
9,675,974.85
2,242,833.61 B BAHAN
1,988,714.40 Cat Tembok
4,231,548.01
C PERALATAN
21,000.00
24,640.00 D Jumlah (A+B+C)
14,170.00
138,000.00
3,200.00
201,010.00 100 27
457,800.00
283,400.00
487,200.00
198,000.00
40,000.00
4,375.00
15,800.00
745,375.00 1 M3 Membuat Beton Tumbuk Sp. 1:3:5
Bahan
125,350.00 Tenaga
1,650.00
58,500.00
3,509.00
32,400.00
64,000.00
7,000.00
2,666.25
295,075.25
Rp. 30,000.00
Rp. 7,500.00
Rp. 12,000.00
Rp. 35,000.00
Rp. 11,840.40
Rp. 2,072.07
Rp. 98,412.47
9,724.00
8,265.40
9,295.00
8,400.00
14,400.00
1,050.00
493.75
51,628.15 PASANG 1 BUAH LAMPU SL 25 WATT
No. Uraian
23,205.00 A TENAGA
1,001.00 Pekerja
715.00 Tukang
19,200.00 Kepala Tukang
25,600.00 Mandor
2,800.00
493.75 B BAHAN
73,014.75 Lampu SL 25 Watt
s cat penutup) Rumah Downlight
14,800.50
38,481.30 C PERALATAN
2,400.00
10,080.00
1,102.50 D Jumlah (A+B+C)
493.75
67,358.05
38,481.30
2,400.00
10,080.00
1,102.50
493.75
52,557.55
178,750.00
137,000.00
195,000.00
6,000.00
40,000.00
4,375.00
1,481.25 18 1 M3 Membuat Beton Mutu f'c =14.5 Mpa (K175), Slump (12 ± 2) cm, w/c = 0.66 (SNI 7394:20
562,606.25
91,000.00
137,000.00
195,000.00
6,000.00
40,000.00
4,375.00
14,812.50
397,187.50
121,550.00
137,000.00 19 1 Kg Merakit Pembesian Polos/Ulir (SNI 7394:2008, Pasal 6.17)
6,000.00
40,000.00
4,375.00
14,812.50
323,737.50
51,480.00
137,000.00
6,000.00
40,000.00
4,375.00 20 1 M2 Pasangan Bekisting Untuk Pondasi (SNI 7394:2008, Pasal 6.20)
14,812.50
253,667.50
523,380.00
137,000.00
6,000.00
40,000.00
4,375.00
14,812.50
725,567.50
150,000.00
7,200.00
72,000.00
10,500.00
592.50 22 1 M2 Pasangan Bekisting Untuk Kolom (SNI 7394:2008, Pasal 6.22)
240,292.50
150,000.00
1,200.00
60,000.00
1,750.00
987.50
213,937.50
150,000.00
600.00
60,000.00
875.00
493.75
211,968.75 23 1 M2 Pasangan Bekisting Untuk Balok (SNI 7394:2008, Pasal 6.23)
20,000.00
1,800.00
18,000.00
2,625.00
148.13
42,573.13
20,000.00
1,200.00
12,000.00
1,750.00
98.75
35,048.75 24 Bongkar 1 M2 Bekisting / Cetakan & Siram Beton
20,000.00
1,800.00
18,000.00
2,625.00 25 1 M3 Pondasi Telapak Beton Bertulang
148.13
42,573.13
23,500.00
2,400.00
24,000.00
3,500.00 26 1 M3 Pondasi Titik Beton Bertulang
197.50
53,597.50
23,500.00
2,400.00
24,000.00
3,500.00 27 1 M3 Sloof 25/30 Beton Bertulang
197.50
53,597.50
Err:509
1,800.00
18,000.00
2,625.00 28 1 M3 Sloof 15/20 Beton Bertulang
148.13
Err:509
Jumlah
Dibulatkan
218,000.00
13,750.00
120,000.00
480,000.00
52,500.00
9,875.00
894,125.00
190,750.00
360,000.00
96,000.00
320,000.00
35,000.00
7,900.00
1,009,650.00
396,000.00
1,800.00
24,000.00
2,625.00
158.00
424,583.00
106,820.00
825.00
6,900.00
-
72,000.00
320,000.00
35,000.00
5,925.00
547,470.00
106,820.00
825.00
6,900.00
-
-
72,000.00
320,000.00
35,000.00
5,925.00
547,470.00
327,000.00
4,125.00
60,000.00
320,000.00
35,000.00
4,937.50
751,062.50
5,995,000.00
154,000.00
480,000.00
1,920,000.00
210,000.00
39,500.00
8,798,500.00
5,995,000.00
82,500.00
288,000.00
1,152,000.00
126,000.00
23,700.00
7,667,200.00
44,100.00
22,050.00
6,875.00
12,000.00
16,000.00
1,750.00
987.50
103,762.50
37,800.00
2,750.00
18,000.00
40,000.00
4,375.00
14,812.50
117,737.50
82,500.00
825.00
8,400.00
16,000.00
1,750.00
691.25
110,166.25
27,090.00
1,650.00
12,000.00
16,000.00
1,750.00
987.50
59,477.50
-
275.00
6,000.00
8,000.00
875.00
592.50
15,742.50
11,340.00
550.00
3,360.00
12,800.00
1,400.00
276.50
29,726.50
22,050.00
2,750.00
-
72,000.00
288,000.00
31,500.00
5,925.00
422,225.00
30,240.00
275.00
4,800.00
128,000.00
14,000.00
7,900.00
185,215.00
7,560.00
275.00
4,800.00
128,000.00
14,000.00
7,900.00
162,535.00
61,425.00
2,750.00
-
72,000.00
288,000.00
31,500.00
5,925.00
461,600.00
61,425.00
-
4,125.00
18,000.00
72,000.00
7,875.00
1,481.25
164,906.25
61,425.00
-
4,125.00
-
18,000.00
72,000.00
7,875.00
1,481.25
164,906.25
3,780,000.00
2,750.00
600,000.00
1,600,000.00
262,500.00
49,375.00
6,294,625.00
22,050.00
2,750.00
72,000.00
288,000.00
31,500.00
5,925.00
422,225.00
50,050.00
550.00
38,400.00
2,100.00
35.55
3,284.82
94,420.37
13,500.00
1,100.00
48,000.00
2,450.00
47.40
3,284.82
68,382.22
75,075.00
412.50
28,800.00
48,000.00
10,500.00
177.75
4,379.76
167,345.01
36,225.00
137.50
18,000.00
48,000.00
5,250.00
1,580.00
109,192.50
84,000.00
5,500.00
24,000.00
160.00
17,500.00
1,975.00
133,135.00
138,600.00
4,125.00
168,000.00
640,000.00
87,500.00
16,787.50
1,055,012.50
Bahan 1.000 Bh
6.000 Kg
0.010 M3
Tenaga 1.000 Oh
1.500 Oh
1.500 Oh
0.160 Oh
Tenaga 1.000 Oh
1.000 Oh
0.100 Oh
0.100 Oh
Tenaga 0.010 Oh
0.100 Oh
0.010 Oh
0.005 Oh
Tenaga 0.010 Oh
0.100 Oh
0.010 Oh
0.005 Oh
Tenaga 0.081 Oh
0.135 Oh
0.0135 Oh
0.0041 Oh
Tenaga 0.081 Oh
0.135 Oh
0.0135 Oh
0.0041 Oh
Tenaga 0.054 Oh
0.090 Oh
0.009 Oh
0.027 Oh
AN BALOK LANTAI
Uraian Kode Satuan Harga Satuan (Rp.)
L.01 Oh Rp -
L.02 Oh Rp -
L.03 Oh Rp -
L.04 Oh Rp -
Err:509
Err:509
L.01 Oh Rp -
L.02 Oh Rp -
L.03 Oh Rp -
L.04 Oh Rp -
M3 Err:509
Kg Err:509
KLAS I UNTUK DINDING
Uraian Kode Satuan Harga Satuan (Rp.)
L.01 Oh Rp -
L.02 Oh Rp -
L.03 Oh Rp -
L.04 Oh Rp -
M3 Err:509
Kg Err:509
L.01 Oh Rp -
L.02 Oh Rp -
L.03 Oh Rp -
L.04 Oh Rp -
M3 Err:509
Kg Err:509
L.01 Oh Rp -
L.02 Oh Rp -
L.03 Oh Rp -
L.04 Oh Rp -
Kg Rp -
Lbr Rp -
PEKERJAAN PONDASI
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
kg Err:509
Bh 1.00 Rp 178,750.00
Bh 1.00
JUMLAH HARGA BA Rp 195,000.00
373,750.00
Pasal 6.17)
@ Rp. = Rp.
@ Rp. = Rp.
Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
Rp.
Rp.
8, Pasal 6.21)
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
Rp.
Rp.
08, Pasal 6.22)
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
Rp.
Rp.
@ Rp. = Rp.
@ Rp. = Rp.
Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
@ Rp. = Rp.
Rp.
IPSUM L=10CM
2,242,833.61
1,988,714.40
4,231,548.01
136,615.00
Kloset Duduk Keramik @ Rp. 1,500,000.00 = Rp.
Semen @ Rp. 2,100.00 = Rp.
Pasir Pasang @ Rp. 545,000.00 = Rp.
Jumlah I = Rp.
Pekerja @ Rp. 120,000.00 = Rp.
Tukang Pipa @ Rp. 160,000.00 = Rp.
Kepala Tukang @ Rp. 175,000.00 = Rp.
Mandor @ Rp. 197,500.00 = Rp.
Jumlah II Rp.
Jumlah I + II Rp.
PEKERJAAN KAYU
10 1 M3 Kolom Kayu
Jumlah Harga (Rp.) Kayu Balok 1.2000 M3
Paku Biasa 0.1000 Kg
Rp - Pekerja 5.0000 Oh
Rp - Tukang Kay 10.0000 Oh
Rp - Kepala Tuk 1.5000 Oh
Rp - Mandor 0.2500 Oh
Rp -
11 1 M2 PASANG LANTAI PAPAN/DINDING PAPAN KA
Err:509 papan klas 0.025 M3
Err:509 paku Biasa 0.200 Kg
Err:509 Pekerja 0.250 Oh
Tukang Kay 0.300 Oh
Kepala Tuk 0.030 Oh
- Mandor 0.003 Oh
Err:509
12 1 M2 PASANG DINDING TRIPLEKS 3 MM
paku Triple 0.0100 Kg
Tripleks 5 0.3640 Lbr
Jumlah Harga (Rp.) Pekerja 0.1500 Oh
Tukang Kay 0.1500 Oh
Rp - Kepala Tuk 0.0100 Oh
Rp - Mandor 0.0050 Oh
Rp -
Rp - 13 1 M3 PASANG RANGKA KAYU KLAS I UNTUK DIN
Rp - balok kals I 1.20 M3
paku Biasa 5.60 Kg
Rp - Pekerja 4.000 Oh
Rp - Tukang 12.000 Oh
Rp - Kepala Tuk 1.200 Oh
Mandor 0.200 Oh
PEKERJAAN ATAP
9 1 M2 Jendela Nako
Jendela Na 1.1000 M2
Paku Skrup 1.0000 dos
Besi Strip 7.0000 M
Pekerja 0.0150 Oh
Tukang ka 0.1500 Oh
Kepala Tuk 0.0150 Oh
Mandor 0.0008 Oh
4
1
2
Jumlah Harga (Rp.)
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 3
Err:509
Err:509
= Rp. 3,597,000.00
= Rp. 2,028,000.00
= Rp. 4,228,287.44
Rp. 9,853,287.44
= Rp. 197,245.13
= Rp. 44,828.44
= Rp. 5,811.09
= Rp. 19,126.80
Rp. 267,011.46
Rp. 10,120,298.89
0.00
0.00
0.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
50,000.00
50,000.00
1,200.00
16,000.00
1,750.00
987.50
19,937.50
69,937.50
45,000.00
500.00
45,500.00
1,200.00
16,000.00
1,750.00
987.50
19,937.50
65,437.50
177,879.68
51,881.57
229,761.26
9,720.00
21,600.00
2,362.50
809.75
34,492.25
264,253.51
0.00
0.00
0.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
68,689.43
20,034.42
88,723.84
6,480.00
14,400.00
1,575.00
5,332.50
27,787.50
116,511.34
tumbuk 1 :3 :5
2,100.00 457,800.00
490,000.00 254,800.00
6,318,130.65 5,496,773.67
120,000.00 198,000.00
160,000.00 40,000.00
175,000.00 4,375.00
197,500.00 15,800.00
6,467,548.67
MASANG 1 M3 KUSEN PINTU DAN KUSEN JENDELA. KAYU KELAS II - SNI 3434:2008 (6.2)
3,150,000.00 3,780,000.00
54,340.00 67,925.00
120,000.00 720,000.00
160,000.00 2,880,000.00
175,000.00 315,000.00
197,500.00 59,250.00
7,822,175.00
MASANG 1 M2 DAUN PINTU PANEL. KAYU - SNI 3434:2008 (6.5)
3,150,000.00 126,000.00
32,200.00 16,100.00
120,000.00 120,000.00
160,000.00 480,000.00
175,000.00 52,500.00
197,500.00 9,875.00
804,475.00
ksi Kuda-kuda Kayu Klas 1 - SNI 3434:2008 (6.13)
3,150,000.00 3,465,000.00
54,340.00 304,304.00
120,000.00 480,000.00
160,000.00 1,920,000.00
175,000.00 210,000.00
197,500.00 39,500.00
6,418,804.00
ONSTRUKSI GORDENG. KAYU - SNI 3434:2008 (6.15)
3,150,000.00 3,465,000.00
54,340.00 163,020.00
120,000.00 288,000.00
160,000.00 1,152,000.00
175,000.00 126,000.00
197,500.00 23,700.00
5,217,720.00
langit-langit (60 x 120) cm
3,150,000.00 37,800.00
54,340.00 5,434.00
120,000.00 18,000.00
160,000.00 40,000.00
175,000.00 4,375.00
197,500.00 14,812.50
120,421.50
pleks(60 x 120) cm Tebal 3 mm
95,000.00 35,625.00
54,340.00 1,630.20
120,000.00 8,400.00
160,000.00 16,000.00
175,000.00 1,750.00
197,500.00 691.25
64,096.45
n 1x(2.5x20)cm Kayu Klas 1 - SNI 3434:2008 (6.21)
3,150,000.00 27,090.00
54,340.00 3,260.40
120,000.00 12,000.00
160,000.00 16,000.00
175,000.00 1,750.00
197,500.00 987.50
61,087.90
ound Kayu Profil
71,500.00 75,075.00
54,340.00 543.40
120,000.00 6,000.00
160,000.00 8,000.00
175,000.00 875.00
197,500.00 592.50
91,085.90
K INDUK DAN BALOK LANTAI
3,150,000.00 3,780,000.00
54,340.00 304,304.00
120,000.00 480,000.00
160,000.00 1,920,000.00
175,000.00 210,000.00
197,500.00 39,500.00
6,733,804.00
175,000.00 210,000.00
197,500.00 19,750.00
120,000.00 600,000.00
160,000.00 1,600,000.00
175,000.00 262,500.00
197,500.00 49,375.00
2,741,625.00
AI PAPAN/DINDING PAPAN KAYU KLAS I 2/20
3,150,000.00 78,750.00
54,340.00 10,868.00
120,000.00 30,000.00
160,000.00 48,000.00
175,000.00 5,250.00
197,500.00 592.50
173,460.50
NG TRIPLEKS 3 MM
54,340.00 543.40
300,300.00 109,309.20
120,000.00 18,000.00
160,000.00 24,000.00
175,000.00 1,750.00
197,500.00 987.50
154,590.10
KA KAYU KLAS I UNTUK DINDING
3,150,000.00 3,780,000.00
54,340.00 304,304.00
120,000.00 480,000.00
160,000.00 1,920,000.00
175,000.00 210,000.00
197,500.00 39,500.00
6,733,804.00
3,150,000.00 7,560.00
54,340.00 543.40
120,000.00 4,800.00
160,000.00 128,000.00
175,000.00 14,000.00
197,500.00 7,900.00
162,803.40
185,000.00 203,500.00
197,500.00 9,875.00
120,000.00 12,000.00
160,000.00 8,000.00
175,000.00 875.00
197,500.00 987.50
235,237.50
128,700.00 38,610.00
197,500.00 7,900.00
120,000.00 18,000.00
160,000.00 11,200.00
175,000.00 1,400.00
197,500.00 1,185.00
78,295.00
atar/Jurai, seng bjls 30
128,700.00 135,135.00
197,500.00 2,962.50
6,318,130.65 60,654.05
120,000.00 18,000.00
160,000.00 48,000.00
175,000.00 5,250.00
197,500.00 1,580.00
271,581.55
DAN KACA
anam biasa
1,144,000.00 1,144,000.00
120,000.00 1,200.00
160,000.00 80,000.00
175,000.00 1,750.00
197,500.00 987.50
1,227,937.50
anam km mandi
71,500.00 71,500.00
120,000.00 600.00
160,000.00 80,000.00
175,000.00 875.00
197,500.00 493.75
153,468.75
30,030.00 30,030.00
120,000.00 1,800.00
160,000.00 24,000.00
175,000.00 2,625.00
197,500.00 148.13
58,603.13
jendela kupu-kupu
64,350.00 64,350.00
120,000.00 1,200.00
160,000.00 16,000.00
175,000.00 1,750.00
197,500.00 98.75
83,398.75
715,000.00 715,000.00
120,000.00 1,800.00
160,000.00 24,000.00
175,000.00 2,625.00
197,500.00 148.13
743,573.13
45,500.00 45,500.00
120,000.00 2,400.00
160,000.00 32,000.00
175,000.00 3,500.00
197,500.00 197.50
83,597.50
32,500.00 32,500.00
120,000.00 2,400.00
160,000.00 32,000.00
175,000.00 3,500.00
197,500.00 197.50
70,597.50
643,500.00 707,850.00
41600 41,600.00
124790 873,530.00
120,000.00 1,800.00
160,000.00 24,000.00
175,000.00 2,625.00
197,500.00 148.13
1,651,553.13
tumbuk 1 :3 :5
2,100.00 457,800.00
560,000.00 291,200.00
560,000.00 487,200.00
120,000.00 198,000.00
175,000.00 43,750.00
148,005.00 3,700.13
148,005.00 11,840.40
1,493,490.53
p t l b
PEKERJAAN PERSIAPAN 24 12
Pembersihan Lapangan 65 39
Pengukuran dan Pemasangan Bouplank
200.6 158
PEKERJAAN TANAH/URUGAN 122 0.8 0.7
Pek. Galian tanah pondasi
Pek. Urugan Tanah kembali (1/3xgalian tanah pondasi)
Pek. Urugan Pasir di bawah pondasi 122 0.05 0.8
Pek. Urugan Pasir di bawah lantai 298
Pek. Urugan sirtu di bawah lantai / Peninggian lantai 298
23.05938 274.9406
PEKERJAAN PASANGAN & KERAMIK
Pek. Pasangan Batu Kosong 122 0.1 0.8
Pek. Pasangan Batu Kali 122 0.7 0.525
Pek. Pasangan Batu Tela 1 : 4 122 4
Pek. Plesteran 1 : 4
Pas Lantai Granit 60x60 291.895
wc 6.105
PEKERJAAN BETON
Pek. Footplat 1 0.2 1 20
Pek. Lantai Kerja Footplate 1.1 1.1 0.05 20
Pek. Sloof beton 20/25 86.5 0.2 0.25
Pek. Sloof beton 15/20 35.5 0.2 0.15
Pek. balok beton 20/20 cm 86.5 0.2 0.2
Pek. balok beton 15/20 cm 35.5 0.15 0.2
Pek. Ring Balok 20/20 cm
Pek. Ring Balok 15/20 cm
Pek. Kolom beton utama 25/25 cm 4 0.25 0.25 20
Pek. Kolom beton praktis 15/15 cm 4 0.15 0.15 17
Pek. Tangga 21
bordes 0.13 5.48625
plat tangga 5.1 1.3 0.13 7.987952
Pek. Plat lantai = 13 0
Pek Cor Lantai Beton Tumbuk 298
PEKERJAAN SANITASI
Kloset Duduk
Slang Sower + Kran
Flor Drain
Pipa Air Bersi
Pipa Air Kotor
Septtang+ Resapan
TANDON
PEMBERSIHAN AKHIR
Pembersihan Akhir
PEKERJAAN PENGUNCI, PENGGANTUNG, DAN SANITAIR
Pasang Kunci tanam
Pasang engsel pintu
Pasang engsel jendela
Pasang Grendel Jendela
Pasang Hak / Kait Angin
Pasang Kran dia 1/2
Pasang pipa galvanis dia 1/2
Kloset Jongkok
Pas. Floor Drain
p t l b
PEKERJAAN KAYU, KUSEN, PINTU, JENDELA, VENTILASI
Pas. Kusen Pintu, Jendela & Ventilasi
pi 5.7 0.05 0.1 1
v 1 0 0 51
6.1 0.05 0.1 24
Pas. Pintu Panel
pi 6
pi 0
24
kca mt 8.64
daun jendela
7.7 0.05 0.1 12 0.462
48 0.05 0.1 8
luas volume
288 86.5 0 86.5
122 35.5
9.76
44.835
488 410.8
291.895
6.105
5.25 0.0625
0.0605
4.325
1.065
3.46
1.065
5
1.53
0.026 0.546
0.713213
1.038434 12.11625
0 14.59789
17.88
2.0736
51
luas volume
0.06 3.06 0 51
1.935 46.44 0.732 146.4
77.2 1.2225 295.5
2.58 15.48
1.68 0
1.68 40.32 14.775
55.8 0
14.775
A . UPAH KERJA
1 . Pekerja Org/Hr = Rp.
2 . Tukang Org/Hr = Rp.
3 . Kepala Tukang Org/Hr = Rp.
4 . Mandor Org/Hr = Rp.
B . HARGA BAHAN
I KELOMPOK TANAH PASIR DAN BATU
II KELOMPOK KAYU
1. Balok kayu besi /M3 = Rp.
2. Balok / papan kayu matoa /M3 = Rp.
3. Papan kayu besi /M3 = Rp.
4. Papan campuran /M3 = Rp.
5. Kayu doken /btg = Rp.
6 Papan bekesting /M3 = Rp.
7 List plafon kayu matoa di profil /Btg = Rp.
8 List kayu papan di profil /Btg = Rp.
545,000.00
490,000.00
545,000.00
560,000.00
560,000.00
1,040,000.00
4,000.00
340,000.00
300,000.00
300,000.00
5,450,000.00
3,150,000.00
5,450,000.00
3,000,000.00
25,000.00
3,000,000.00
75,000.00
67,700.00
2,100.00 105,000.00
23,000.00
21,166.67
20,200.00
20,500.00
81,500.00
32,500.00
85,000.00
220,000.00
185,000.00
360,000.00
27,500.00
150,000.00
20,000.00
23,500.00
32,000.00
31,500.00
31,500.00
65,000.00
30,000.00
20,000.00
27,000.00
65,000.00
123,000.00
13,500.00
7,500.00
65,000.00
13,700.00
12,000.00
36,500.00
36,500.00
36,000.00
29,500.00
75,000.00
10,000.00
23,000.00
71,500.00
45,000.00
TABEL KEBUTUHAN PENU
mainhole = 0.15 x
diameter luas jarak sengkang panjang sengkang
(cm) (cm²) (m) (m)
tulangan 1 0.8 0.5024 0.12 0
tulangan 2 0.8 0.5024 0.12 0
luasan bekistng
banyaknya panjang besi berat besi (tabel) berat besi
(bh) (m) (kg/m¹) (kg) luasan bekistng
8 266.6666667 0.887 236.5333333
333.3333333 153.3333333 0.393 60.26
total 296.7933333 13.33333 M²/M³
toleransi (10%) 29.67933333 1.333333 M²/M³
total berat keseluruhan 326.4726667 14.66667 M²/M³
0.25 = 20 M¹/M³
banyaknya panjang besi berat besi (tabel) berat besi
(bh) (m) (kg/m¹) (kg) luasan bekistng
8 160 0.887 141.92
200 122 0.393 47.946
total 189.866 10 M²/M³
toleransi (10%) 18.9866 1 M²/M³
total berat keseluruhan 208.8526 11 M²/M³
luasan bekistng
banyaknya panjang besi berat besi (tabel) berat besi
(bh) (m) (kg/m¹) (kg) luasan bekistng
75.75757576 83.33333333 0.887 73.91666667
18.33333333 83.33333333 0.887 73.91666667
total 147.8333333 5 M²/M³
toleransi (10%) 14.78333333 0.5 M²/M³
total berat keseluruhan 162.6166667 5.5 M²/M³
1 = 7.6923076923 M¹/M³
banyaknya panjang besi berat besi (tabel) berat besi
(bh) (m) (kg/m¹) (kg)
153.8461538 153.8461538 1.58 243.0769231
20 153.8461538 1.58 243.0769231
total 486.1538462
toleransi (10%) 48.61538462
total berat keseluruhan 534.7692308
1 = 10 M¹/M³
banyaknya panjang besi berat besi (tabel) berat besi
(bh) (m) (kg/m¹) (kg)
166.6666667 166.6666667 0.393 65.5
16.66666667 166.6666667 0.393 65.5
total 131
toleransi (10%) 13.1
total berat keseluruhan 144.1
kolom ukuran = 0.25 x 0.25 =
diameter luas jarak sengkang panjang sengkang banyaknya panjang besi
(cm) (cm²) (m) (m) (bh) (m)
tulangan utama 1.2 1.1304 0 0 14 224
tulangan sengkang 0.8 0.5024 0.12 0.7 133.3333333 93.33333333
8.3333333333
16 M¹/M³
berat besi (tabel) berat besi
(kg/m¹) (kg) luasan bekistng
0.887 198.688
0.393 36.68
total 235.368 16 M²/M³
toleransi (10%) 23.5368 1.6 M²/M³
total berat keseluruhan 258.9048 17.6 M²/M³
16 M¹/M³
berat besi (tabel) berat besi
(kg/m¹) (kg)
luasan bekistng
1.578 100.992
0.887 56.768
0.393 44.6448
total 202.4048 8 M²/M³
toleransi (10%) 20.24048 0.8 M²/M³
total berat keseluruhan 222.64528 8.8 M²/M³
13.3333333333 M¹/M³
berat besi (tabel) berat besi
(kg/m¹) (kg)
luasan bekistng
1.578 84.16
0.887 70.96
0.393 39.824
total 194.944 8 M²/M³
toleransi (10%) 19.4944 0.8 M²/M³
total berat keseluruhan 214.4384 8.8 M²/M³
33.3333333333 M¹/M³
berat besi (tabel) berat besi
(kg/m¹) (kg)
luasan bekistng
1.578 315.6
0.887 59.13333333
0.393 60.26
total 434.9933333 13.33333 M²/M³
toleransi (10%) 43.49933333 1.333333 M²/M³
total berat keseluruhan 478.4926667 14.66667 M²/M³
13.3333333333 M¹/M³
berat besi (tabel) berat besi
(kg/m¹) (kg)
luasan bekistng
1.578 84.16
0.887 70.96
0.393 39.824
total 194.944 8 M²/M³
toleransi (10%) 19.4944 0.8 M²/M³
total berat keseluruhan 214.4384 8.8 M²/M³
16 M¹/M³
berat besi (tabel) berat besi
(kg/m¹) (kg)
luasan bekistng
1.578 100.992
0.887 85.152
0.393 44.6448
total 230.7888 8 M²/M³
toleransi (10%) 23.07888 0.8 M²/M³
total berat keseluruhan 253.86768 8.8 M²/M³
11.1111111111 M¹/M³
berat besi (tabel) berat besi
(kg/m¹) (kg)
luasan bekistng
1.578 70.13333333
0.887 39.42222222
0.393 37.55333333
total 147.1088889 6.666667 M²/M³
toleransi (10%) 14.71088889 0.666667 M²/M³
total berat keseluruhan 161.8197778 7.333333 M²/M³
20 M¹/M³
berat besi (tabel) berat besi
(kg/m¹) (kg)
luasan bekistng
1.578 126.24
0.887 70.96
0.393 47.946
total 245.146 10 M²/M³
toleransi (10%) 24.5146 1 M²/M³
total berat keseluruhan 269.6606 11 M²/M³
25 M¹/M³
berat besi (tabel) berat besi
(kg/m¹) (kg)
luasan bekistng
1.578 157.8
0.887 133.05
0.393 55.02
total 345.87 10 M²/M³
toleransi (10%) 34.587 1 M²/M³
total berat keseluruhan 380.457 11 M²/M³
Sentani, 28 Maret
2012
CV. BULAUWAN
PAPUA
DODY S.
Staf Teknik
NM
Cor dinding beton 15 / 0.6667
BESI POKOK = : 10 mm
BEGEL : 8 mm
SELIMUT BETON 0.02 m
TINGGI BETON 0.66666667 cm
LEBAR BETON 15 cm
PERHITUNGAN BEKISTING
LUAS BEKISTING/M3
JADI 1 M3 BETON MEMBUTUHKAN:
BESI POKOK - Kg
BEGEL 11,898.58 Kg 11898.578
BEKISTING 156.00 m2
0.666667
= 0.001 m2
= 1,000.000 m'
= 0.020 m'
= 0.377 m'
= 0.150 m'
= 6,666.667 bh
= 2,515.556 m
= 11,898.578 kg
= - bh
= - m
= - kg
= 156.667 m2
RENCANA ANGGARAN BIAYA
PEKERJAAN :
LOKASI :
KOTA JAYAPURA/SKYLINE/ENTROP
TAHUN ANGGARAN :
2019
REKAPITULASI
IV PEKERJAAN BETON
IX PEKERJAAN SANITASI
2 PPN 10%
3 PERENCANAAN
4 PENGAWASAN
5 REAL TOTAL
6 DIBULATKAN
TERBILANG
Satu Milyar Tiga Ratus Enam Puluh Tiga Juta Lima Ratus Ribu Rupiah
JUMLAH HARGA
Rp 17,484,265
Rp 106,450,936
Rp 371,193,990
Rp 392,438,519
Rp 108,575,762
Rp 44,601,004
Rp 46,761,213
Rp 39,339,938
Rp 20,341,560
Rp 8,123,785.75
Rp 10,000,000
Rp 1,165,310,971
Rp 116,531,097
Rp 46,612,439
Rp 34,959,329
Rp 1,363,413,836
Rp 1,363,500,000
Ribu Rupiah
BIAYA UPAH DAN MATERIAL
1 PASIR URUG Ls
2 Pasir Pasang / Cor M3
3 Sirtu M3
4 Kerikil / Batu Pecah 2/3 M3
5 Batu Pecah 3/5 M3
6 Kerikil / Batu Pecah 5/7 M3
7 Batu Kali / Gunung M3
8 Kayu Papan M3
9 Kayu Balok M3
10 Kayu Bakar M3
11 Kayu Steger/Perancah M3
12 Material Timbunan Biasa M3
13 Minyak Tanah Ltr
14 Minyak Solar Ltr
15 Minyak Pelumas Ltr
16 Premium/ Bensin Ltr
1 2 3 4
* Harga untuk masing - masing item berbeda karena disesuaikan dengan berat, dimensi, lokasi material dan tin
resiko kerusakan
* Data material bahan besi diambil berdasarkan Buku Grafik dan Tabel Beton Bertulang SKSNI - T15 - 1991 - 0
1 Amplas Lbr 5,000.00 0.050 3000.00
2 Ardeks Gelombang Besar Lbr 140,000.00 5.750 3000.00
3 Semen PC (Putih) Kg 5,000.00 1.000 3000.00
4 Ardeks Gelombang Kecil Lbr 120,000.00 4.350 3000.00
5 Aspal Kg 25,000.00 1.000 3000.00
6 Atap Aluminium Gelombang Lbr 95,000.00 2.850 3000.00
7 Atap Fiber Glass Lbr 120,000.00 3.230 3000.00
8 Atap Sakuraroof Lbr 75,000.00 2.350 3000.00
9 Atap 'Seng BJLS 20 Lbr 73,000.00 4.350 3000.00
10 Atap 'Seng BJLS 30 Lbr 90,000.00 5.650 3000.00
11 Bak Cuci Piring Aluminium 1 Lubang Bh 550,000.00 10.000 3000.00
12 Bak Cuci Piring Aluminium 2 Lubang Bh 700,000.00 12.000 3000.00
13 Bak Cuci Piring Porselin Bh 700,000.00 15.000 3000.00
14 Bak Fiber @ 500 ltr Bh 2,125,000.00 8.000 3000.00
15 Bak Mandi Fiber Glass 110 Ltr Bh 575,000.00 7.000 3000.00
16 Bak Mandi Fiber Glass 220 Ltr Bh 3,696,000.00 10.000 3000.00
17 Balon Lampu 5 Watt / Hias Bh 50,000.00 0.025 3000.00
18 Batu Batako Bh 8,000.00 7.800 3000.00
19 Batu Tela Bh 2,500.00 1.900 3000.00
20 Batu Saringan 10 cm M3 386,400.00 0.000 3000.00
21 Batu Tela Bh 2,000.00 1.900 3000.00
22 Baut/Mur Pengikat Sling 0,5" BH 28,000.00 0.160 3000.00
23 Besi Beton Kg 13,500.00 1.000 3000.00
24 Besi beton Polos Kg 31,000.00 1.000 3000.00
25 Besi beton Ulir Kg 35,000.00 1.000 3000.00
26 Besi Dia 10 mm Btg 135,000.00 6.280 3000.00
27 Besi Dia 6 mm Btg 45,000.00 2.452 3000.00
28 Besi Dia 8 mm Btg 100,000.00 4.323 3000.00
29 Besi Dia. 1 Inchi Btg 1.00 1.000 3000.00
30 Besi Dia. 12 mm Btg 215,000.00 8.870 3000.00
31 Besi Dia. 16 mm Btg 310,000.00 18.960 3000.00
32 Besi Dia. 19 mm Btg 650,000.00 26.760 3000.00
33 Besi Plat 3.30 Btg 70,000.00 1.000 3000.00
34 Besi Siku 30 x 30 x 4 - 6 m i
Btg 150,000.00 8.160 3000.00
35 Besi Siku 40 x 40 x 4 - 6 m i
Btg 225,000.00 14.520 3000.00
36 Besi Siku 50 x 50 x 4 - 6 mi Btg 325,000.00 22.620 3000.00
37 Breker Bh 77,000.00 1.000 3000.00
38 Cap Lampu Besar Set 2,576,000.00 12.000 3000.00
39 Cap Lampu Kecil Set 2,576,000.00 10.000 3000.00
40 Capasitor Bh 515,000.00 0.650 3000.00
41 Cat Genteng Kg 150,000.00 1.000 3000.00
42 Cat Kilap Kg 50,000.00 1.000 3000.00
43 Cat Meny Kg 40,000.00 1.000 3000.00
44 Cat Teak Oil Kg 50,000.00 1.000 3000.00
45 Cat Tembok Kg 17,000.00 1.000 3000.00
46 Cetakan Kerb Bh 55,000.00 5.000 3000.00
47 Conblock Kerawang Bh - 4.300 3000.00
48 Contaktor 100 Amper Bh 4,037,500.00 15.000 3000.00
49 Contaktor 45 Amper Bh 2,800,000.00 10.000 3000.00
50 Contaktor 75 Amper Bh 3,200,000.00 13.000 3000.00
51 Dempul Kg 35,000.00 1.000 3000.00
52 Dop Gip 1" BH 15,000.00 0.040 3000.00
53 Dop Gip 1,5" BH 20,000.00 0.050 3000.00
54 Dop Gip 2" BH 45,000.00 0.055 3000.00
55 Dop Gip 3" BH 125,000.00 0.066 3000.00
56 Double Nepple 1" BH 15,000.00 0.500 3000.00
57 Engsel Kupu-kupu Hitam Psg 15,000.00 0.025 3000.00
58 Engsel Pintu Kuningan Psg 40,000.00 0.250 3000.00
59 Figting Bh 15,000.00 0.025 3000.00
60 Floor Drain Bh 20,000.00 0.150 3000.00
61 Foto Cell 3 Amper Bh 600,000.00 4.000 3000.00
62 Foto Cell 6 Amper Bh 700,000.00 5.000 3000.00
63 Gerobak Dorong Bh 650,000.00 7.000 3000.00
64 Grendel Pintu Hitam Psg 15,000.00 0.067 3000.00
65 Grendel Pintu Kuningan Psg 35,000.00 0.067 3000.00
66 Hak Angin Psg 15,000.00 0.450 3000.00
67 Halogen Bh 635,000.00 1.000 3000.00
68 Handel Jendela Bh 35,000.00 0.450 3000.00
69 Has Nyamuk Besi M2 35,000.00 0.250 3000.00
70 Has Nyamuk Plastik M 2
20,000.00 0.050 3000.00
71 Ijuk Kg 135,000.00 1.000 3000.00
72 Indikator Bh 590,000.00 0.850 3000.00
73 Isolasi Unibel Bh 15,000.00 0.250 3000.00
74 Isolasi Unibel (Besar) Bh 25,000.00 0.500 3000.00
75 Kabel NYA 1 x 2.5 mm 2
Rol 375,000.00 18.000 3000.00
76 Kabel NYA 2 x 2.5 mm 2
Rol 350,000.00 18.000 3000.00
77 Kabel NYA 2.5 mm2 Rol 485,000.00 18.000 3000.00
78 Kabel NYA 4 x 2.5 mm 2
Rol 448,000.00 18.000 3000.00
79 Kabel NYA 4 x 4 mm 2
Rol 900,000.00 18.000 3000.00
80 Kabel NYFGBY 3 x 6 mm 2
M' 55,000.00 0.015 3000.00
81 Kabel NYFGBY 4 x 16 mm2 M' 125,000.00 0.015 3000.00
82 Kabel NYFGBY 4 x 25 mm 2
M' 275,000.00 0.015 3000.00
83 Kabel NYFGBY 4 x 6 mm 2
M' 100,000.00 0.015 3000.00
84 Kabel Tc 2 x 10 mm 2
M' 150,000.00 0.015 3000.00
85 Kabel Tc 2 x 18 mm2 M' 225,000.00 0.015 3000.00
86 Kabel Tc 4 x 16 mm 2
M' 350,000.00 0.015 3000.00
87 Kabel Tc 4 x 25 mm2 M' 475,000.00 0.015 3000.00
88 Kaca Bening 3mm M 2
350,000.00 8.250 3000.00
89 Kaca Bening 5mm M 2
500,000.00 10.120 3000.00
90 Kaca Nako 5 Klip Zet 200,000.00 7.000 3000.00
91 Kaca Nako 5 Klip ( Rayben ) Zet 200,000.00 7.000 3000.00
92 Kaca Nako 6 Klip Zet 258,888.00 8.000 3000.00
93 Kaca Nako 7 Klip Zet 301,000.00 8.500 3000.00
94 Kaca Nako 8 Klip Zet 344,000.00 9.000 3000.00
95 Kaca Nako 9 Klip Zet 303,000.00 9.500 3000.00
96 Kaca Raybent 5mm M 2
339,999.00 10.120 3000.00
97 Kait Talang Bh 16,800.00 0.150 3000.00
98 Kawat Duri Rol 285,000.00 15.000 3000.00
99 Kawat Galfano 3mm Rol 1,370,000.00 20.000 3000.00
100 Kawat Galfano 4mm Rol 1,178,000.00 25.000 3000.00
101 Kawat Ikat Beton Ikat 30,000.00 1.000 3000.00
102 Kawat Rang M' 40,000.00 2.500 3000.00
103 Klem Behel Set 45,000.00 1.000 3000.00
104 Klem Kabel No. 10 Pak 10,000.00 0.750 3000.00
105 Klem Kabel No. 12 Pak 12,000.00 0.750 3000.00
106 Klem Kabel No. 14 Pak 14,000.00 0.750 3000.00
107 Klem Kabel No. 17 Pak 17,000.00 0.750 3000.00
108 Klem Plastik Set 30,000.00 1.000 3000.00
109 Klem Sadle 2" - 1" BH 85,000.00 0.066 3000.00
110 Klep Dia 2" BH 64,000.00 0.055 3000.00
111 Klep Dia 3" BH 95,000.00 0.066 3000.00
112 Klosed Duduk (KIA) Set 3,220,000.00 15.000 3000.00
113 Klosed Jongkok (KIA) Bh 392,000.00 8.000 3000.00
114 Kotak Panel (Besar) Set 1,764,000.00 7.000 3000.00
115 Kotak Panel (Kecil) Set 1,528,000.00 5.000 3000.00
116 Kunci Gembok Bh 50,000.00 0.250 3000.00
117 Kunci Tanam Biasa Set 100,000.00 0.850 3000.00
118 Kunci Tanam Dua Antik Set 210,000.00 0.850 3000.00
119 Kunci Tanam KM/WC Set 50,000.00 0.850 3000.00
120 Lampu Mercury HPLN 250 Watt Bh 518,000.00 8.000 3000.00
121 Lampu Mercury ML 250 Watt Bh 445,000.00 9.000 3000.00
122 Lampu Mercury Son 250 Watt Bh 616,000.00 6.000 3000.00
123 Lampu Pijar 100 watt Set 28,800.00 0.050 3000.00
124 Lampu Pijar 15 watt Set 10,000.00 0.025 3000.00
125 Lampu Pijar 25 watt Set 12,000.00 0.250 3000.00
126 Lampu Pijar 40 watt Set 15,000.00 0.250 3000.00
127 Lampu Pijar 60 watt Set 17,000.00 0.050 3000.00
128 Lampu Pijar 75 watt Set 20,000.00 0.050 3000.00
129 Lampu Sorot 1000 Watt Bh 554,400.00 1.000 3000.00
130 Lampu Sorot 750 Watt Bh 1,000,000.00 1.000 3000.00
131 Lampu Sorot 500 Watt Bh 300,000.00 0.750 3000.00
132 Lampu Tanam Set 90,000.00 0.750 3000.00
133 Lampu TL.1 x 40 watt Set 115,000.00 2.000 3000.00
134 Lampu TL.10 watt Set 45,000.00 1.000 3000.00
135 Lampu TL.2 x 40 watt Set 400,000.00 3.000 3000.00
136 Lampu TL.20 watt Set 95,000.00 1.500 3000.00
137 Lat Kayu M' 48,000.00 1.000 3000.00
138 Lem Aibon Kg 32,200.00 1.000 3000.00
139 Lem PVC Kg 10,000.00 1.000 3000.00
140 Limit 10 Amper Set 85,000.00 0.500 3000.00
141 Limit 16 Amper Set 89,600.00 1.000 3000.00
142 Limit 25 Amper Set 112,000.00 1.250 3000.00
143 Limit 45 Amper Set 280,000.00 1.500 3000.00
144 Limit 6 Amper Set 44,800.00 0.250 3000.00
145 Lis Kayu P = 4 m Btg 50,000.00 5.000 3000.00
146 List Plafon Profil P = 4 m M' 7,000.00 0.750 3000.00
147 Martelu 1 Kg Bh 50,000.00 1.000 3000.00
148 Martelu 2.5 Kg Bh 65,000.00 2.500 3000.00
149 Martelu 5 Kg Bh 150,000.00 5.000 3000.00
150 Minyak Cat Ltr 35,000.00 1.000 3000.00
151 Mur baut Ø 12 - 25 Bh 28,350.00 0.500 3000.00
152 Nok Sakuraroof / 1,1 m' Lbr 95,000.00 1.500 3000.00
153 Nok Tyluks/Ardeks M' 120,000.00 2.500 3000.00
154 Ohm Saklar 10 Amper Bh 3,080,000.00 5.000 3000.00
155 Ohm Saklar 100 Amper Bh 4,250,000.00 6.000 3000.00
156 Over Sock 1,5" - 1" BH 83,000.00 1.000 3000.00
157 Over Sock 2" - 1,5" BH 103,000.00 1.200 3000.00
158 Over Sock 3" - 2" BH 135,200.00 1.500 3000.00
159 Paku Ardeks Kg 35,000.00 1.000 3000.00
160 Paku campur Kg 28,000.00 1.000 3000.00
161 Paku Campuran Kg 28,000.00 1.000 3000.00
162 Paku Eternit Kg 26,000.00 1.000 3000.00
163 Paku Jembatan Kg 45,000.00 1.000 3000.00
164 Paku Seng Kg 35,000.00 1.000 3000.00
165 Paku Tripleks Kg 32,000.00 1.000 3000.00
166 Paving Block Bh 8,000.00 5.500 3000.00
167 Pengikat Beton Kg 30,000.00 1.000 3000.00
168 Pipa Gip Dia 1" Tebal Btg 295,000.00 2.330 3000.00
169 Pipa Gip Dia 1" Tipis Btg 200,000.00 2.150 3000.00
170 Pipa Gip Dia 1,5" Tebal Btg 380,000.00 2.660 3000.00
171 Pipa Gip Dia 1,5" Tipis Btg 350,000.00 2.450 3000.00
172 Pipa Gip Dia 1/2" Tebal Btg 175,000.00 1.650 3000.00
173 Pipa Gip Dia 1/2" Tipis Btg 150,000.00 1.450 3000.00
174 Pipa Gip Dia 2" Tebal Btg 480,000.00 3.330 3000.00
175 Pipa Gip Dia 2" Tipis Btg 450,000.00 3.100 3000.00
176 Pipa Gip Dia 2,5" Tebal Btg 650,000.00 3.840 3000.00
177 Pipa Gip Dia 2,5" Tipis Btg 525,000.00 3.650 3000.00
178 Pipa Gip Dia 3" Tebal Btg 1,025,000.00 4.160 3000.00
179 Pipa Gip Dia 3" Tipis Btg 950,000.00 4.000 3000.00
180 Pipa Gip Dia 3/4" Tebal Btg 200,000.00 2.000 3000.00
181 Pipa Gip Dia 3/4" Tipis Btg 175,000.00 1.850 3000.00
182 Pipa Gip Dia 4" Tebal Btg 1,500,000.00 8.500 3000.00
183 Pipa Gip Dia 4" Tipis Btg 1,250,000.00 6.850 3000.00
184 Pipa Gip Dia 6" Tebal Btg 280,000.00 15.740 3000.00
185 Pipa Gip Dia 6" Tipis Btg 276,000.00 12.850 3000.00
186 Pipa Kabel Listrik Btg 15,000.00 0.035 3000.00
187 Pipa PVC Dia 1" AW Btg 70,000.00 1.550 3000.00
188 Pipa PVC Dia 1" Tipis Btg 60,000.00 1.350 3000.00
189 Pipa PVC Dia 1,5" AW Btg 75,000.00 2.000 3000.00
190 Pipa PVC Dia 1,5" Tipis Btg 65,000.00 1.750 3000.00
191 Pipa PVC Dia 1/2" AW Btg 25,000.00 0.450 3000.00
192 Pipa PVC Dia 1/2" Tipis Btg 20,000.00 0.250 3000.00
193 Pipa PVC Dia 2" AW Btg 80,000.00 2.600 3000.00
194 Pipa PVC Dia 2" Tipis Btg 70,000.00 2.300 3000.00
195 Pipa PVC Dia 3" AW Btg 190,000.00 3.670 3000.00
196 Pipa PVC Dia 3" Tipis Btg 90,000.00 2.750 3000.00
197 Pipa PVC Dia 4" AW Btg 325,000.00 4.680 3000.00
198 Pipa PVC Dia 4" Tipis Btg 250,000.00 4.000 3000.00
199 Pipa PVC Dia 6" AW Btg 165,000.00 6.500 3000.00
200 Pipa PVC Dia 6" Tipis Btg 150,000.00 5.500 3000.00
201 Plammur Kg 27,000.00 1.000 3000.00
202 Polykarbonat M' 180,000.00 2.500 3000.00
203 Pompa air Listrik Set 750,000.00 6.000 3000.00
204 Residu Kg 65,000.00 1.000 3000.00
205 Saklar Engkel / Tunggal Bh 16,000.00 0.025 3000.00
206 Saklar ganda Bh 20,000.00 0.025 3000.00
207 Samb. Pipa PVC 1/2" Bh 4,000.00 0.025 3000.00
208 Sambungan Elbow 45º Dia 1" BH 5,000.00 0.400 3000.00
209 Sambungan Elbow 45º Dia 1.5" BH 8,000.00 0.500 3000.00
210 Sambungan Elbow 45º Dia 2" BH 15,000.00 0.650 3000.00
211 Sambungan Elbow 45º Dia 3" BH 15,000.00 0.980 3000.00
212 Sambungan Elbow 90º Dia 1" BH 8,000.00 0.400 3000.00
213 Sambungan Elbow 90º Dia 1,5" BH 8,000.00 0.500 3000.00
214 Sambungan Elbow 90º Dia 2" BH 10,000.00 0.650 3000.00
215 Sambungan Elbow 90º Dia 3" BH 20,000.00 0.980 3000.00
216 Sambungan Kopling 1" BH 27,000.00 0.062 3000.00
217 Sambungan Kopling 1,5" BH 37,000.00 0.071 3000.00
218 Sambungan Kopling 2" BH 50,000.00 0.080 3000.00
219 Sambungan Kopling 3" BH 22,000.00 0.100 3000.00
220 Sambungan Pipa PVC 2" Bh 40,000.00 0.150 3000.00
221 Sambungan Pipa PVC 4" Bh 20,000.00 0.250 3000.00
222 Sambungan Tee 1" - 1" BH 45,000.00 0.083 3000.00
223 Sambungan Tee 1,5" - 1" BH 75,000.00 0.100 3000.00
224 Sambungan Tee 2" - 1" BH 95,000.00 0.125 3000.00
225 Saringan Air 3" BH 30,000.00 0.250 3000.00
226 Seal Tape Bh 5,000.00 0.020 3000.00
227 Sekring Khas 1 Group Set 600,000.00 0.050 3000.00
228 Sekring Khas 2 Group Set 650,000.00 1.000 3000.00
229 Sekring Khas 3 Group Set 825,000.00 1.500 3000.00
230 Selang 3/8" Rol 1,450,000.00 0.500 3000.00
231 Semen Pc 50 Kg Zak 560,000.00 50.000 3000.00
232 Semen Warna 40 KG Zak 1,000,000.00 40.000 3000.00
233 Seng Plat Alumunium Lbr 120,000.00 2.200 3000.00
234 Seng Plat BJLS 20 Lbr 75,000.00 4.200 3000.00
235 Seng Plat BJLS 30 Lbr 95,000.00 5.450 3000.00
236 Septibel Bh 450,000.00 1.000 3000.00
237 Sock Gip Dia 1" BH 15,000.00 0.080 3000.00
238 Sock Gip Dia 1,5" BH 20,000.00 0.100 3000.00
239 Sock Gip Dia 2" BH 45,000.00 0.125 3000.00
240 Sock Gip Dia 3" BH 125,000.00 0.160 3000.00
241 Stop kontak Bh 20,000.00 0.025 3000.00
242 Stop Kran 1" BH 60,000.00 0.800 3000.00
243 Stop Kran 1,5" BH 60,000.00 1.000 3000.00
244 Stop Kran 1/2 " Bh 75,000.00 0.250 3000.00
245 Stop Kran 2" BH 125,000.00 1.200 3000.00
246 Stop Kran 3" BH 200,000.00 1.500 3000.00
247 Talang PVC 3 " Btg 125,000.00 3.000 3000.00
248 Tali Sling Dia 0,5" m' 95,000.00 1.250 3000.00
249 Tangga Aluminium 12 Meter Set 4,250,000.00 25.000 3000.00
250 Tangga Aluminium 15 Meter Set 5,650,000.00 30.000 3000.00
251 Tangga Aluminium 9 Meter Set 2,850,000.00 20.000 3000.00
252 Tangki Air Fiber Glass 1M 3
Bh 3,000,000.00 10.000 3000.00
253 Tangki Air Fiber Glass 2M3 Bh 4,928,000.00 15.000 3000.00
254 Tap Conector Set 3,400,000.00 1.000 3000.00
255 Teak Oil / Politur Kg 40,000.00 1.000 3000.00
256 Teak Wood lbr 145,000.00 4.600 3000.00
257 Teakwood Lbr 145,000.00 3.750 3000.00
258 Tegel Keramik 40 x 40 cm Karton 260,000.00 30.000 3000.00
259 Tegel 'Keramik Plint 10 x 20 cm Karton 240,000.00 8.000 3000.00
260 Tegel Kramik 20 x 20 cm Karton 240,000.00 1.500 3000.00
261 Tegel Kramik 30 x 30 cm Karton 240,000.00 1.800 3000.00
262 Tegel Teraso 30 x 30 cm Bh 225,000.00 1.800 3000.00
263 Tegel Wafel 20 x 20 cm Bh 225,000.00 1.500 3000.00
264 Tegel PC 20 x 20 cm Bh - 1.500 3000.00
265 Tiang Besi Ukuran 7 Meter Btg 3,500,000.00 120.000 3000.00
266 Tiang Besi Ukuran 9 Meter Btg 3,850,000.00 150.000 3000.00
267 Trafo 250 Watt Bh 1,232,000.00 8.000 3000.00
268 Trafo 400 Watt Bh 1,848,000.00 10.000 3000.00
269 Tripleks 3mm lbr 95,000.00 4.800 3000.00
270 Tripleks 4mm lbr 150,000.00 6.800 3000.00
271 Tripleks 6mm lbr 200,000.00 8.800 3000.00
272 Tripleks 9mm lbr 240,000.00 10.800 3000.00
273 Ubin Porselin 10 x 20 cm Karton 225,000.00 1.600 3000.00
274 Ubin Porselin 11 x 11 cm Bh 12,000.00 1.750 3000.00
275 Urinoir keramik Bh 1,680,000.00 15.000 3000.00
276 Vinil M 2
20,000.00 5.650 3000.00
277 Wastafel Lengkap Set 3,080,000.00 15.000 3000.00
RIAL
Rp 490,000.00 Rp - Rp 650,000.00
Rp 545,000 Rp 4,800,000 Rp 7,905,900.00 Rp 8,065,500.00 Rp 7,520,500.00 0.93
7,700.00
8,800.00
742,500.00
1,045,000.00
68,500.00
-
9,350.00
9,900.00
218,200.00
304,500.00
472,300.00
134,100.00
182,300.00
31,800.00
329,500.00
405,000.00
27,500.00
37,400.00
34,100.00
74,800.00
74,800.00
113,850.00
242,000.00
49,500.00
23,100.00
16,500.00
25,300.00
25,300.00
25,000.00
35,000.00
141,135.00
28,600.00
28,600.00
747,340.00
683,000.00
825,000.00
429,000.00
495,000.00
550,000.00
715,000.00
825,000.00
23,100.00
44,000.00
5,426.67
70,400.00
55,000.00
880,000.00
3,190,000.00
55,000.00
187,000.00
181,500.00
181,500.00
49,500.00
27,500.00
150,000.00
-
137,500.00
179,300.00
70,000.00
-
66,000.00
56,870.00
40,150.00
-
57,200.00
32,000.00
41,800.00
42,900.00
31,900.00
41,800.00
2,200,000.00
433,400.00
544,500.00
233,200.00
720,500.00
250,000.00
83,600.00
42,900.00
149,600.00
242,000.00
57,200.00
402,600.00
39,600.00
61,600.00
50,000.00
40,000.00
10,150.00
96,800.00
55,000.00
16,500.00
19,800.00
95,700.00
99,000.00
132,000.00
93,500.00
93,500.00
143,000.00
52,000.00
45,000.00
61,600.00
209,000.00
297,000.00
275,000.00
324,000.00
450,000.00
119,000.00
231,000.00
1,980,000.00
61,600.00
913,000.00
1,174,450.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
0.2 PERHITUNGAN BIAYA ANGKUT MATERIAL
0.2
0.2 KEGIATAN : PEMELIHARAAN RUTIN/BERKALA RUMAH JABATAN
0.2 PEKERJAAN : PEMELIHARAAN RUMAH BUPATI
0.2 LOKASI : KABUPATEN TOLIKARA
0.2 TAHUN ANGGARAN : 2018
0.2
0.2 DAFTAR HARGA UPAH
0.2 NO U R A I A N SAT U P A H
0.2 1 Mandor O/H
0.2 2 Kepala Tukang O/H
0.2 3 Tukang Kayu O/H
0.2 4 Tukang Batu O/H
0.2 5 Tukang Besi O/H
0.2 6 Tukang Listrik O/H
0.2 7 Tukang Cat O/H
0.2 8 Tukang Pipa O/H
0.2 9 Tukang Las O/H
0.2 10 Pekerja O/H
0.2 11 Buruh Terampil O/H
0.2 12 Buruh Tidak Terampil O/H
0.2 13 Sopir Truck O/H
0.2 14 Sopir Personil O/H
0.2 15 Mekanik O/H
0.2 16 Pembantu Mekanik O/H
0.2 17 Operator Terampil O/H
0.2 18 Pembantu Operator O/H
0.2
0.2 BAHAN MATERIAL LOKAL
0.2 1 Alat bantu Ls
0.2 2 Pasir Pasang / Cor M3
0.2
0.2 3 Kerikil / Batu Pecah 2/3 M3
0.2 4 Batu Pecah 3/5 M3
0.2 5 Kerikil / Batu Pecah 5/7 M3
0.2 6 Batu Kali / Gunung M3
0.2 7 Kayu Papan M3
0.2 8 Kayu Balok M3
0.2 9 Kayu Bakar M3
0.2 10 Kayu Steger M3
0.2 11 Material timbunan Biasa M3
0.2
0.2
HARGA WAMENA-
NO JENIS MATERIAL SAT. BERAT
WAMENA (Rp) KARUBAGA (Rp)
1 2 3 4 5 6
* Harga untuk masing - masing item berbeda karena disesuaikan dengan berat, dimensi, lokasi material dan tingkat
resiko kerusakan
* Data material bahan besi diambil berdasarkan Buku Grafik dan Tabel Beton Bertulang SKSNI - T15 - 1991 - 03
1 Amplas Lbr 5,000.00 0.050 3000.00
2 Ardeks Gelombang Besar Lbr 140,000.00 5.750 3000.00
3 Semen PC (Putih) Kg 5,000.00 1.000 3000.00
4 Ardeks Gelombang Kecil Lbr 120,000.00 4.350 3000.00
5 Aspal Kg 25,000.00 1.000 3000.00
6 Atap Aluminium Gelombang Lbr 95,000.00 2.850 3000.00
7 Atap Fiber Glass Lbr 120,000.00 3.230 3000.00
8 Atap Sakuraroof Lbr 75,000.00 2.350 3000.00
9 Atap 'Seng BJLS 20 Lbr 73,000.00 4.350 3000.00
10 Atap 'Seng BJLS 30 Lbr 90,000.00 5.650 3000.00
11 Bak Cuci Piring Aluminium 1 Lubang Bh 550,000.00 10.000 3000.00
12 Bak Cuci Piring Aluminium 2 Lubang Bh 700,000.00 12.000 3000.00
13 Bak Cuci Piring Porselin Bh 700,000.00 15.000 3000.00
14 Bak Fiber @ 500 ltr Bh 2,125,000.00 8.000 3000.00
15 Bak Mandi Fiber Glass 110 Ltr Bh 575,000.00 7.000 3000.00
16 Bak Mandi Fiber Glass 220 Ltr Bh 3,696,000.00 10.000 3000.00
17 Balon Lampu 5 Watt / Hias Bh 50,000.00 0.025 3000.00
18 Batu Batako Bh 8,000.00 7.800 3000.00
19 Batu Tela Bh 2,500.00 1.900 3000.00
20 Batu Saringan 10 cm M3 386,400.00 0.000 3000.00
21 Batu Tela Bh 2,000.00 1.900 3000.00
22 Baut/Mur Pengikat Sling 0,5" BH 28,000.00 0.160 3000.00
23 Besi Beton Kg 13,500.00 1.000 3000.00
24 Besi beton Polos Kg 31,000.00 1.000 3000.00
25 Besi beton Ulir Kg 35,000.00 1.000 3000.00
26 Besi Dia 10 mm Btg 135,000.00 6.280 3000.00
27 Besi Dia 6 mm Btg 45,000.00 2.452 3000.00
28 Besi Dia 8 mm Btg 100,000.00 4.323 3000.00
29 Besi Dia. 1 Inchi Btg 1.00 1.000 3000.00
30 Besi Dia. 12 mm Btg 215,000.00 8.870 3000.00
31 Besi Dia. 16 mm Btg 310,000.00 18.960 3000.00
32 Besi Dia. 19 mm Btg 650,000.00 26.760 3000.00
33 Besi Plat 3.30 Btg 70,000.00 1.000 3000.00
34 Besi Siku 30 x 30 x 4 - 6 m i
Btg 150,000.00 8.160 3000.00
35 Besi Siku 40 x 40 x 4 - 6 m i
Btg 225,000.00 14.520 3000.00
36 Besi Siku 50 x 50 x 4 - 6 mi Btg 325,000.00 22.620 3000.00
37 Breker Bh 77,000.00 1.000 3000.00
38 Cap Lampu Besar Set 2,576,000.00 12.000 3000.00
39 Cap Lampu Kecil Set 2,576,000.00 10.000 3000.00
40 Capasitor Bh 515,000.00 0.650 3000.00
41 Cat Genteng Kg 150,000.00 1.000 3000.00
42 Cat Kilap Kg 50,000.00 1.000 3000.00
43 Cat Meny Kg 40,000.00 1.000 3000.00
44 Cat Teak Oil Kg 50,000.00 1.000 3000.00
45 Cat Tembok Kg 17,000.00 1.000 3000.00
46 Cetakan Kerb Bh 55,000.00 5.000 3000.00
47 Conblock Kerawang Bh - 4.300 3000.00
48 Contaktor 100 Amper Bh 4,037,500.00 15.000 3000.00
49 Contaktor 45 Amper Bh 2,800,000.00 10.000 3000.00
50 Contaktor 75 Amper Bh 3,200,000.00 13.000 3000.00
51 Dempul Kg 35,000.00 1.000 3000.00
52 Dop Gip 1" BH 15,000.00 0.040 3000.00
53 Dop Gip 1,5" BH 20,000.00 0.050 3000.00
54 Dop Gip 2" BH 45,000.00 0.055 3000.00
55 Dop Gip 3" BH 125,000.00 0.066 3000.00
56 Double Nepple 1" BH 15,000.00 0.500 3000.00
57 Engsel Kupu-kupu Hitam Psg 15,000.00 0.025 3000.00
58 Engsel Pintu Kuningan Psg 40,000.00 0.250 3000.00
59 Figting Bh 15,000.00 0.025 3000.00
60 Floor Drain Bh 20,000.00 0.150 3000.00
61 Foto Cell 3 Amper Bh 600,000.00 4.000 3000.00
62 Foto Cell 6 Amper Bh 700,000.00 5.000 3000.00
63 Gerobak Dorong Bh 650,000.00 7.000 3000.00
64 Grendel Pintu Hitam Psg 15,000.00 0.067 3000.00
65 Grendel Pintu Kuningan Psg 35,000.00 0.067 3000.00
66 Hak Angin Psg 15,000.00 0.450 3000.00
67 Halogen Bh 635,000.00 1.000 3000.00
68 Handel Jendela Bh 35,000.00 0.450 3000.00
69 Has Nyamuk Besi M2 35,000.00 0.250 3000.00
70 Has Nyamuk Plastik M 2
20,000.00 0.050 3000.00
71 Ijuk Kg 135,000.00 1.000 3000.00
72 Indikator Bh 590,000.00 0.850 3000.00
73 Isolasi Unibel Bh 15,000.00 0.250 3000.00
74 Isolasi Unibel (Besar) Bh 25,000.00 0.500 3000.00
75 Kabel NYA 1 x 2.5 mm 2
Rol 375,000.00 18.000 3000.00
76 Kabel NYA 2 x 2.5 mm 2
Rol 350,000.00 18.000 3000.00
77 Kabel NYA 2.5 mm2 Rol 485,000.00 18.000 3000.00
78 Kabel NYA 4 x 2.5 mm 2
Rol 448,000.00 18.000 3000.00
79 Kabel NYA 4 x 4 mm 2
Rol 900,000.00 18.000 3000.00
80 Kabel NYFGBY 3 x 6 mm 2
M' 55,000.00 0.015 3000.00
81 Kabel NYFGBY 4 x 16 mm2 M' 125,000.00 0.015 3000.00
82 Kabel NYFGBY 4 x 25 mm 2
M' 275,000.00 0.015 3000.00
83 Kabel NYFGBY 4 x 6 mm 2
M' 100,000.00 0.015 3000.00
84 Kabel Tc 2 x 10 mm 2
M' 150,000.00 0.015 3000.00
85 Kabel Tc 2 x 18 mm2 M' 225,000.00 0.015 3000.00
86 Kabel Tc 4 x 16 mm 2
M' 350,000.00 0.015 3000.00
87 Kabel Tc 4 x 25 mm2 M' 475,000.00 0.015 3000.00
88 Kaca Bening 3mm M 2
350,000.00 8.250 3000.00
89 Kaca Bening 5mm M 2
500,000.00 10.120 3000.00
90 Kaca Nako 5 Klip Zet 200,000.00 7.000 3000.00
91 Kaca Nako 5 Klip ( Rayben ) Zet 200,000.00 7.000 3000.00
92 Kaca Nako 6 Klip Zet 258,888.00 8.000 3000.00
93 Kaca Nako 7 Klip Zet 301,000.00 8.500 3000.00
94 Kaca Nako 8 Klip Zet 344,000.00 9.000 3000.00
95 Kaca Nako 9 Klip Zet 303,000.00 9.500 3000.00
96 Kaca Raybent 5mm M 2
339,999.00 10.120 3000.00
97 Kait Talang Bh 16,800.00 0.150 3000.00
98 Kawat Duri Rol 285,000.00 15.000 3000.00
99 Kawat Galfano 3mm Rol 1,370,000.00 20.000 3000.00
100 Kawat Galfano 4mm Rol 1,178,000.00 25.000 3000.00
101 Kawat Ikat Beton Ikat 30,000.00 1.000 3000.00
102 Kawat Rang M' 40,000.00 2.500 3000.00
103 Klem Behel Set 45,000.00 1.000 3000.00
104 Klem Kabel No. 10 Pak 10,000.00 0.750 3000.00
105 Klem Kabel No. 12 Pak 12,000.00 0.750 3000.00
106 Klem Kabel No. 14 Pak 14,000.00 0.750 3000.00
107 Klem Kabel No. 17 Pak 17,000.00 0.750 3000.00
108 Klem Plastik Set 30,000.00 1.000 3000.00
109 Klem Sadle 2" - 1" BH 85,000.00 0.066 3000.00
110 Klep Dia 2" BH 64,000.00 0.055 3000.00
111 Klep Dia 3" BH 95,000.00 0.066 3000.00
112 Klosed Duduk (KIA) Set 3,220,000.00 15.000 3000.00
113 Klosed Jongkok (KIA) Bh 392,000.00 8.000 3000.00
114 Kotak Panel (Besar) Set 1,764,000.00 7.000 3000.00
115 Kotak Panel (Kecil) Set 1,528,000.00 5.000 3000.00
116 Kunci Gembok Bh 50,000.00 0.250 3000.00
117 Kunci Tanam Biasa Set 100,000.00 0.850 3000.00
118 Kunci Tanam Dua Antik Set 210,000.00 0.850 3000.00
119 Kunci Tanam KM/WC Set 50,000.00 0.850 3000.00
120 Lampu Mercury HPLN 250 Watt Bh 518,000.00 8.000 3000.00
121 Lampu Mercury ML 250 Watt Bh 445,000.00 9.000 3000.00
122 Lampu Mercury Son 250 Watt Bh 616,000.00 6.000 3000.00
123 Lampu Pijar 100 watt Set 28,800.00 0.050 3000.00
124 Lampu Pijar 15 watt Set 10,000.00 0.025 3000.00
125 Lampu Pijar 25 watt Set 12,000.00 0.250 3000.00
126 Lampu Pijar 40 watt Set 15,000.00 0.250 3000.00
127 Lampu Pijar 60 watt Set 17,000.00 0.050 3000.00
128 Lampu Pijar 75 watt Set 20,000.00 0.050 3000.00
129 Lampu Sorot 1000 Watt Bh 554,400.00 1.000 3000.00
130 Lampu Sorot 750 Watt Bh 1,000,000.00 1.000 3000.00
131 Lampu Sorot 500 Watt Bh 300,000.00 0.750 3000.00
132 Lampu Tanam Set 90,000.00 0.750 3000.00
133 Lampu TL.1 x 40 watt Set 115,000.00 2.000 3000.00
134 Lampu TL.10 watt Set 45,000.00 1.000 3000.00
135 Lampu TL.2 x 40 watt Set 400,000.00 3.000 3000.00
136 Lampu TL.20 watt Set 95,000.00 1.500 3000.00
137 Lat Kayu M' 48,000.00 1.000 3000.00
138 Lem Aibon Kg 32,200.00 1.000 3000.00
139 Lem PVC Kg 10,000.00 1.000 3000.00
140 Limit 10 Amper Set 85,000.00 0.500 3000.00
141 Limit 16 Amper Set 89,600.00 1.000 3000.00
142 Limit 25 Amper Set 112,000.00 1.250 3000.00
143 Limit 45 Amper Set 280,000.00 1.500 3000.00
144 Limit 6 Amper Set 44,800.00 0.250 3000.00
145 Lis Kayu P = 4 m Btg 50,000.00 5.000 3000.00
146 List Plafon Profil P = 4 m M' 7,000.00 0.750 3000.00
147 Martelu 1 Kg Bh 50,000.00 1.000 3000.00
148 Martelu 2.5 Kg Bh 65,000.00 2.500 3000.00
149 Martelu 5 Kg Bh 150,000.00 5.000 3000.00
150 Minyak Cat Ltr 35,000.00 1.000 3000.00
151 Mur baut Ø 12 - 25 Bh 28,350.00 0.500 3000.00
152 Nok Sakuraroof / 1,1 m' Lbr 95,000.00 1.500 3000.00
153 Nok Tyluks/Ardeks M' 120,000.00 2.500 3000.00
154 Ohm Saklar 10 Amper Bh 3,080,000.00 5.000 3000.00
155 Ohm Saklar 100 Amper Bh 4,250,000.00 6.000 3000.00
156 Over Sock 1,5" - 1" BH 83,000.00 1.000 3000.00
157 Over Sock 2" - 1,5" BH 103,000.00 1.200 3000.00
158 Over Sock 3" - 2" BH 135,200.00 1.500 3000.00
159 Paku Ardeks Kg 35,000.00 1.000 3000.00
160 Paku campur Kg 28,000.00 1.000 3000.00
161 Paku Campuran Kg 28,000.00 1.000 3000.00
162 Paku Eternit Kg 26,000.00 1.000 3000.00
163 Paku Jembatan Kg 45,000.00 1.000 3000.00
164 Paku Seng Kg 35,000.00 1.000 3000.00
165 Paku Tripleks Kg 32,000.00 1.000 3000.00
166 Paving Block Bh 8,000.00 5.500 3000.00
167 Pengikat Beton Kg 30,000.00 1.000 3000.00
168 Pipa Gip Dia 1" Tebal Btg 295,000.00 2.330 3000.00
169 Pipa Gip Dia 1" Tipis Btg 200,000.00 2.150 3000.00
170 Pipa Gip Dia 1,5" Tebal Btg 380,000.00 2.660 3000.00
171 Pipa Gip Dia 1,5" Tipis Btg 350,000.00 2.450 3000.00
172 Pipa Gip Dia 1/2" Tebal Btg 175,000.00 1.650 3000.00
173 Pipa Gip Dia 1/2" Tipis Btg 150,000.00 1.450 3000.00
174 Pipa Gip Dia 2" Tebal Btg 480,000.00 3.330 3000.00
175 Pipa Gip Dia 2" Tipis Btg 450,000.00 3.100 3000.00
176 Pipa Gip Dia 2,5" Tebal Btg 650,000.00 3.840 3000.00
177 Pipa Gip Dia 2,5" Tipis Btg 525,000.00 3.650 3000.00
178 Pipa Gip Dia 3" Tebal Btg 1,025,000.00 4.160 3000.00
179 Pipa Gip Dia 3" Tipis Btg 950,000.00 4.000 3000.00
180 Pipa Gip Dia 3/4" Tebal Btg 200,000.00 2.000 3000.00
181 Pipa Gip Dia 3/4" Tipis Btg 175,000.00 1.850 3000.00
182 Pipa Gip Dia 4" Tebal Btg 1,500,000.00 8.500 3000.00
183 Pipa Gip Dia 4" Tipis Btg 1,250,000.00 6.850 3000.00
184 Pipa Gip Dia 6" Tebal Btg 280,000.00 15.740 3000.00
185 Pipa Gip Dia 6" Tipis Btg 276,000.00 12.850 3000.00
186 Pipa Kabel Listrik Btg 15,000.00 0.035 3000.00
187 Pipa PVC Dia 1" AW Btg 70,000.00 1.550 3000.00
188 Pipa PVC Dia 1" Tipis Btg 60,000.00 1.350 3000.00
189 Pipa PVC Dia 1,5" AW Btg 75,000.00 2.000 3000.00
190 Pipa PVC Dia 1,5" Tipis Btg 65,000.00 1.750 3000.00
191 Pipa PVC Dia 1/2" AW Btg 25,000.00 0.450 3000.00
192 Pipa PVC Dia 1/2" Tipis Btg 20,000.00 0.250 3000.00
193 Pipa PVC Dia 2" AW Btg 80,000.00 2.600 3000.00
194 Pipa PVC Dia 2" Tipis Btg 70,000.00 2.300 3000.00
195 Pipa PVC Dia 3" AW Btg 190,000.00 3.670 3000.00
196 Pipa PVC Dia 3" Tipis Btg 90,000.00 2.750 3000.00
197 Pipa PVC Dia 4" AW Btg 325,000.00 4.680 3000.00
198 Pipa PVC Dia 4" Tipis Btg 250,000.00 4.000 3000.00
199 Pipa PVC Dia 6" AW Btg 165,000.00 6.500 3000.00
200 Pipa PVC Dia 6" Tipis Btg 150,000.00 5.500 3000.00
201 Plammur Kg 27,000.00 1.000 3000.00
202 Polykarbonat M' 180,000.00 2.500 3000.00
203 Pompa air Listrik Set 750,000.00 6.000 3000.00
204 Residu Kg 65,000.00 1.000 3000.00
205 Saklar Engkel / Tunggal Bh 16,000.00 0.025 3000.00
206 Saklar ganda Bh 20,000.00 0.025 3000.00
207 Samb. Pipa PVC 1/2" Bh 4,000.00 0.025 3000.00
208 Sambungan Elbow 45º Dia 1" BH 5,000.00 0.400 3000.00
209 Sambungan Elbow 45º Dia 1.5" BH 8,000.00 0.500 3000.00
210 Sambungan Elbow 45º Dia 2" BH 15,000.00 0.650 3000.00
211 Sambungan Elbow 45º Dia 3" BH 15,000.00 0.980 3000.00
212 Sambungan Elbow 90º Dia 1" BH 8,000.00 0.400 3000.00
213 Sambungan Elbow 90º Dia 1,5" BH 8,000.00 0.500 3000.00
214 Sambungan Elbow 90º Dia 2" BH 10,000.00 0.650 3000.00
215 Sambungan Elbow 90º Dia 3" BH 20,000.00 0.980 3000.00
216 Sambungan Kopling 1" BH 27,000.00 0.062 3000.00
217 Sambungan Kopling 1,5" BH 37,000.00 0.071 3000.00
218 Sambungan Kopling 2" BH 50,000.00 0.080 3000.00
219 Sambungan Kopling 3" BH 22,000.00 0.100 3000.00
220 Sambungan Pipa PVC 2" Bh 40,000.00 0.150 3000.00
221 Sambungan Pipa PVC 4" Bh 20,000.00 0.250 3000.00
222 Sambungan Tee 1" - 1" BH 45,000.00 0.083 3000.00
223 Sambungan Tee 1,5" - 1" BH 75,000.00 0.100 3000.00
224 Sambungan Tee 2" - 1" BH 95,000.00 0.125 3000.00
225 Saringan Air 3" BH 30,000.00 0.250 3000.00
226 Seal Tape Bh 5,000.00 0.020 3000.00
227 Sekring Khas 1 Group Set 600,000.00 0.050 3000.00
228 Sekring Khas 2 Group Set 650,000.00 1.000 3000.00
229 Sekring Khas 3 Group Set 825,000.00 1.500 3000.00
230 Selang 3/8" Rol 1,450,000.00 0.500 3000.00
231 Semen Pc 50 Kg Zak 560,000.00 50.000 3000.00
232 Semen Warna 40 KG Zak 1,000,000.00 40.000 3000.00
233 Seng Plat Alumunium Lbr 120,000.00 2.200 3000.00
234 Seng Plat BJLS 20 Lbr 75,000.00 4.200 3000.00
235 Seng Plat BJLS 30 Lbr 95,000.00 5.450 3000.00
236 Septibel Bh 450,000.00 1.000 3000.00
237 Sock Gip Dia 1" BH 15,000.00 0.080 3000.00
238 Sock Gip Dia 1,5" BH 20,000.00 0.100 3000.00
239 Sock Gip Dia 2" BH 45,000.00 0.125 3000.00
240 Sock Gip Dia 3" BH 125,000.00 0.160 3000.00
241 Stop kontak Bh 20,000.00 0.025 3000.00
242 Stop Kran 1" BH 60,000.00 0.800 3000.00
243 Stop Kran 1,5" BH 60,000.00 1.000 3000.00
244 Stop Kran 1/2 " Bh 75,000.00 0.250 3000.00
245 Stop Kran 2" BH 125,000.00 1.200 3000.00
246 Stop Kran 3" BH 200,000.00 1.500 3000.00
247 Talang PVC 3 " Btg 125,000.00 3.000 3000.00
248 Tali Sling Dia 0,5" m' 95,000.00 1.250 3000.00
249 Tangga Aluminium 12 Meter Set 4,250,000.00 25.000 3000.00
250 Tangga Aluminium 15 Meter Set 5,650,000.00 30.000 3000.00
251 Tangga Aluminium 9 Meter Set 2,850,000.00 20.000 3000.00
252 Tangki Air Fiber Glass 1M 3
Bh 3,000,000.00 10.000 3000.00
253 Tangki Air Fiber Glass 2M3 Bh 4,928,000.00 15.000 3000.00
254 Tap Conector Set 3,400,000.00 1.000 3000.00
255 Teak Oil / Politur Kg 40,000.00 1.000 3000.00
256 Teak Wood lbr 145,000.00 4.600 3000.00
257 Teakwood Lbr 145,000.00 3.750 3000.00
258 Tegel Keramik 40 x 40 cm Karton 260,000.00 30.000 3000.00
259 Tegel 'Keramik Plint 10 x 20 cm Karton 240,000.00 8.000 3000.00
260 Tegel Kramik 20 x 20 cm Karton 240,000.00 1.500 3000.00
261 Tegel Kramik 30 x 30 cm Karton 240,000.00 1.800 3000.00
262 Tegel Teraso 30 x 30 cm Bh 225,000.00 1.800 3000.00
263 Tegel Wafel 20 x 20 cm Bh 225,000.00 1.500 3000.00
264 Tegel PC 20 x 20 cm Bh - 1.500 3000.00
265 Tiang Besi Ukuran 7 Meter Btg 3,500,000.00 120.000 3000.00
266 Tiang Besi Ukuran 9 Meter Btg 3,850,000.00 150.000 3000.00
267 Trafo 250 Watt Bh 1,232,000.00 8.000 3000.00
268 Trafo 400 Watt Bh 1,848,000.00 10.000 3000.00
269 Tripleks 3mm lbr 95,000.00 4.800 3000.00
270 Tripleks 4mm lbr 150,000.00 6.800 3000.00
271 Tripleks 6mm lbr 200,000.00 8.800 3000.00
272 Tripleks 9mm lbr 240,000.00 10.800 3000.00
273 Ubin Porselin 10 x 20 cm Karton 225,000.00 1.600 3000.00
274 Ubin Porselin 11 x 11 cm Bh 12,000.00 1.750 3000.00
275 Urinoir keramik Bh 1,680,000.00 15.000 3000.00
276 Vinil M 2
20,000.00 5.650 3000.00
277 Wastafel Lengkap Set 3,080,000.00 15.000 3000.00
MATERIAL
P A H
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp 600,000.00
Rp 5,557,000.00
Rp 1,750,000.00
Rp 1,650,000.00
Rp 1,550,000.00
Rp 550,000.00
Rp 3,500,000.00
Rp 3,500,000.00
Rp 750,000.00
Rp 2,000,000.00
Rp 300,000.00
HARGA SAMPAI
KET.
LOKASI
7 8
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- Penampungan Air Fiber 550 ltr
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- 482,625.00
-
-
-
-
-
-
-
-
-