Penawaran Pekerjaan Bongkaran Pabrik: NO Uraian Pekerjaan Vol Submit Unt Unit Price

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 8

PENAWARAN PEKERJAAN BONGKARAN PABRIK

NO URAIAN PEKERJAAN Vol Submit Unt Unit Price

A. PERSIAPAN
1 Pagar pengaman seng tinggi 2 meter, rangka kayu, seng 114.00 m1 330,121
bekas cleding
2 Listrik kerja, Power by Owner 1.00 Lot
3 Air kerja, Power by Owner 1.00 Lot
Jumlah biaya persiapan

B AREA GUDANG DAN KOLAM IKAN


1 Bongkar pintu teralis besi 1.00 unit 1,000,000
2 Bongkar pondasi batu di area masuk kolam 3.00 m2 74,798
3 Bongkar pintu kayu 3.00 unit 600,000
4 Bongkar pintu dan jendela kayu 3.00 unit 800,000
5 Bongkar jendela kayu 3.00 unit 400,000
6 Bongkar jendela kaca 2.00 unit 500,000
7 Bongkar tangga besi dan railing 1.00 unit 3,500,000
8 Bongkar closet duduk 4.00 unit 48,400
9 Bongkar dinding bata 190.22 m2 41,970
10 Bongkar Plafond 39.00 m2 14,905
11 Bongkar flat lantai mezanine 39.00 m2 74,798
12 Bongkar kolom praktis 41.70 m2 74,798
13 Bongkar ringbalk 89.40 m2 74,798
14 Bongkar baja lantai mezanine 799.27 Kg 3,900

15 Bongkar instalasi listrik existing (saklar dan stop 1.00 Lot 1,520,000
kontak)
16 Bongkar instalasi air kotor 1.00 Lot 5,000,000
17 Bongkar instalasi air bekas 1.00 Lot 5,000,000
18 Bongkar instalasi air bersih 1.00 Lot 5,000,000
Jumlah biaya pembongkaran area gudang dan kolam ikan

C AREA PRODUKSI
1 Bongkar pintu gerbang besi 1.00 unit 3,500,000
2 Bongkar canopy pintu masuk area produksi 1.00 unit 3,500,000
3 Bongkar pintu masuk area produksi 1.00 unit 5,500,000
4 Bongkar cllading spandek 903.98 m2 16,161
5 Bongkar nok atap spandek 62.05 m1 28,958
6 Bongkar penutup atap spandek 2,443.20 m2 16,161
7 Bongkar alumunium foil pelapis atap 2,443.20 m2 4,167
8 Bongkar lisplank 146.00 m1 7,396
9 Bongkar talang BJLS 146.00 m1 14,792
10 Bongkar pipa PVC 4", talang tegak air hujan, tinggi 7,5 25.00 unit 50,000
m
11 Bongkar besi beton Ø 16 mm ikatan gordeng silang 845.94 kg 3,900
kg
12 Bongkar besi beton Ø 14 mm ikatan gordeng sejajar
922.61 3,900
13 Bongkar gordeng atap CNP 125 x 50 9,252.65 kg 3,900
14 Bongkar kuda-kuda baja IWF 250 x 125 12,461.60 kg 3,900
15 Bongkar rangka listplank 146.00 m1 7,396
16 Bongkar rangka overstek baja IWF 150 x 75 1,108.80 kg 3,900
17 Bongkar ikatan kolom, cremona CNP 100 x 50 dan siku 1,872.24 kg 3,900
50x50
kg
18 Bongkar besi beton Ø12 mm, ikatan rangka clading 3,900
508.50
19 Bongkar rangka clasing CNP 100x50 927.20 kg 3,900
20 Bongkar kolom IWF 250x 125 8,436.59 kg 3,900
21 Bongkar base plat tebal 8mm 186.83 kg 3,900
22 Bongkar kolom praktis area toilet 32.35 m1 31,875
23 Bongkar dinding dan roster bawah cladding 326.36 M2 41,970
24 Bongkar dinding bata toilet 86.80 m2 41,970
25 Bongkar pintu 5.00 unit 900,000
26 Bongkar jendela 2.00 unit 550,000
27 Bongkar dinding partisi gypsum 115.90 m2 13,795
28 Bongkar plafond kantor ruang produksi 30.00 m2 14,905
29 Bongkar instalasi air kotor 1.00 lot 7,000,000
30 Bongkar instalasi air bekas 1.00 lot 7,000,000
31 Bongkar instalasi air bersih 1.00 lot 7,000,000
32 Bongkar instalasi listrik 1.00 lot 2,400,000
33 Bongkar titik lampu 1.00 lot 1,720,000
34 Bongkar closet 4.00 unit 48,400
Jumlah biaya pembongkaran area produksi

D AREA SELASAR
1 Bongkar penutup atap spandek 486.00 m2 18,056
2 Bongkar alumunium foil 486.00 m2 4,167
3 Bongkar ikatan gordeng 253.10 kg 3,900
4 Bongkar gordeng CNP 150x75x20x2,3 9,777.68 kg 3,900
5 Bongkar gordeng CNP 150x50x20x2,3 722.67 kg 3,900
6 Bongkar rangka kuda-kuda CNP 200x75x20x3,2 1,001.16 kg 3,900
7 Bongkar rangka kuda-kuda CNP 150x50x20x2,3 357.00 kg 3,900
8 Bongkar pintu 2.00 unit 900,000
9 Bongkar dinding bata 90.80 m2 41,970
10 Bongkar rangka atap 18.00 m2 20,417
11 Instalasi listrik 1.00 Lot 1,800,000
Jumlah Biaya Pembongkaran Area Selasar

E PEMINDAHAN BARANG BEKAS BONGKARAN MAX 1 KM

Pemindahan clading spandek bekas bongkaran ke


1 tempat yang ditentukan owner dengan maksimal jarak 903.98 m2 2,708
200 m
Pemindahan penutup atap spandek bekas bongkaran
2 ke tempat yang ditentukan owner dengan maksimal 2,889.21 m2 2,708
jarak 200 m

3 Pemindahan baja bekas bongkaran ketempat yang 22,290.91 kg 1,896


ditentukan owner dengan maksimal jarak 200 m

Pemindahan tangga besi, railing besi, gerbang besi,


4 pintu besi, pintu kayu, jendela, kaca, rangka baja 1.00 lot 7,500,000
ringan, dan sampah bongkaran, ketempat yang
ditentukan owner dengan jarak 200m
jumlah Biaya Pemindahan Barang Bekas Bongkaran

JUMLAH BIAYA PEKERJAAN PEMBONGKARAN


RIK

Total Price Unit Price Total Price

37,633,794 396,145 45,160,553

- -
- -
37,633,794 45,160,553

1,000,000 2,500,000 2,500,000


224,395 89,758 269,274
1,800,000 720,000 2,160,000
2,400,000 960,000 2,880,000
1,200,000 480,000 1,440,000
1,000,000 600,000 1,200,000
3,500,000 4,500,000 4,500,000
193,600 58,080 232,320
7,983,533 50,364 9,580,240
581,295 17,886 697,554
2,917,138 89,758 3,500,565
3,119,093 89,758 3,742,912
6,686,977 89,758 8,024,372
3,117,153 4,680 3,740,584

1,520,000 2,824,000 2,824,000

5,000,000 10,000,000 10,000,000


5,000,000 10,000,000 10,000,000
5,000,000 10,000,000 10,000,000
52,243,184 77,291,821

3,500,000 4,500,000 4,500,000


3,500,000 4,500,000 4,500,000
5,500,000 9,500,000 9,500,000
14,608,963 19,393 17,530,755
1,796,865 34,750 2,156,238
39,483,857 19,393 47,380,629
10,180,000 5,000 12,216,000
1,079,792 8,875 1,295,750
2,159,583 17,750 2,591,500
1,250,000 60,000 1,500,000
3,299,166 4,680 3,958,999
3,598,179 4,680 4,317,815

36,085,335 4,680 43,302,402


48,600,240 4,680 58,320,288
1,079,792 8,875 1,295,750
4,324,320 4,680 5,189,184

7,301,736 4,680 8,762,083

1,983,150 4,680 2,379,780


3,616,080 4,680 4,339,296
32,902,701 4,680 39,483,241
728,637 4,680 874,364
1,031,156 44,625 1,443,619
13,697,329 50,364 16,436,795
3,642,996 50,364 4,371,595
4,500,000 1,080,000 5,400,000
1,100,000 660,000 1,320,000
1,598,841 16,554 1,918,609
447,150 17,886 536,580
7,000,000 10,000,000 10,000,000
7,000,000 10,000,000 10,000,000
7,000,000 10,000,000 10,000,000
2,400,000 2,880,000 2,880,000
1,720,000 2,064,000 2,064,000
193,600 58,080 232,320
277,909,467 341,997,591

8,775,000 21,667 10,530,000


2,025,000 5,000 2,430,000
987,090 4,680 1,184,508
38,132,952 4,680 45,759,542
2,818,413 4,680 3,382,096
3,904,524 4,680 4,685,429
1,392,300 4,680 1,670,760
1,800,000 1,080,000 2,160,000
3,810,876 50,364 4,573,051
367,500 24,500 441,000
1,800,000 2,160,000 2,160,000
65,813,655 78,976,386

2,448,279 3,250 2,937,935


7,824,944 3,250 9,389,933

42,259,850 2,275 50,711,820

7,500,000 9,000,000 9,000,000

60,033,073 72,039,688

493,633,173 615,466,039 0.198


Bongkar Sanitari (Closed duduk,
Urinoir, Wastafel dan asesorisnya 48,400.00
baik unit dan dinding).
1
Pekerja 0.32 OH 85,000.00 27,200.00
Tukang Batu 0.11 OH 120,000.00 13,200.00
Mandor 0.04 OH 150,000.00 6,000.00
Kepala Pelaksana 0.01 OH 200,000.00 2,000.00

2 Bongkar Dinding 41,970.00


Pekerja 0.20 OH 85,000.00 16,830.00
Tukang Batu 0.20 OH 120,000.00 23,400.00
Mandor 0.01 OH 150,000.00 1,500.00
Kepala Pelaksana 0.00 OH 200,000.00 240.00

3 Bongkar Plafond area Kerja. 14,905.00


Pekerja 0.11 OH 85,000.00 9,265.00
Tukang Plafond 0.02 OH 120,000.00 2,640.00
Mandor 0.02 OH 150,000.00 3,000.00

4 Bongkar talang BJLS 10,700.00


Pekerja 0.08 OH 85,000.00 6,800.00
Tukang Batu 0.02 OH 120,000.00 2,400.00
Mandor 0.01 OH 150,000.00 1,500.00
Kepala Pelaksana 0.00 OH 200,000.00 -
Bongkar Partisi Gipsum, Partisi 13,795.00
Kaca, Daun Pintu, Kusen
5 Alumunium
Pekerja 0.11 OH 85,000.00 9,095.00
Tukang Batu 0.01 OH 120,000.00 1,200.00
Mandor 0.01 OH 150,000.00 1,500.00
Kepala Pelaksana 0.01 OH 200,000.00 2,000.00

6 Bongkar clading spandek 16,160.71


Pekerja 0.02 OH 85,000.00 1,517.86
Tukang Batu 0.02 OH 120,000.00 2,142.86
Mandor 0.03 OH 150,000.00 4,166.67
Kepala Pelaksana 0.04 OH 200,000.00 8,333.33

7 Bongkar alumunium foil 4,166.67


Pekerja 0.02 OH 85,000.00 1,416.67
Tukang Plafond 0.01 OH 120,000.00 1,500.00
Mandor 0.01 OH 150,000.00 1,250.00
Bongkar penutup atap spandek 18,055.56
8
Pekerja 0.06 OH 85,000.00 4,722.22
Tukang Batu 0.04 OH 120,000.00 5,000.00
Mandor 0.03 OH 150,000.00 4,166.67
Kepala Pelaksana 0.02 OH 200,000.00 4,166.67

9 Bongkar Canopy 20,416.67


Pekerja 0.08 OH 85,000.00 7,083.33
Tukang Batu 0.04 OH 120,000.00 5,000.00
Mandor 0.03 OH 150,000.00 4,166.67
Kepala Pelaksana 0.02 OH 200,000.00 4,166.67

10 Bongkar Nok spandek 28,958.33


Pekerja 0.13 OH 85,000.00 10,625.00
Tukang Batu 0.08 OH 120,000.00 10,000.00
Mandor 0.03 OH 150,000.00 4,166.67
Kepala Pelaksana 0.02 OH 200,000.00 4,166.67

11 Bongkar listplang 7,395.83


Pekerja 0.02 OH 85,000.00 1,770.83
Tukang Batu 0.02 OH 120,000.00 2,500.00
Mandor 0.02 OH 150,000.00 3,125.00

12 Bongkar talang BJLS 14,791.67


Pekerja 0.04 OH 85,000.00 3,541.67
Tukang Batu 0.04 OH 120,000.00 5,000.00
Mandor 0.04 OH 150,000.00 6,250.00

13 Bongkar kolom praktis area toilet 31,875.00


Pekerja 0.13 OH 85,000.00 10,625.00
Tukang Batu 0.13 OH 120,000.00 15,000.00
Mandor 0.04 OH 150,000.00 6,250.00