S.NO DATE PROJECT NAME SUB CONTRACTOR NAME/ SEC NO. OF PERSON WORKING

ADITHYA

1 7/24/2019 M.KUMAR 7

SEC

MURUGAN TEMPLE

ITW

2 7/24/2019 ADITHYA SEKAR 5


2 7/24/2019 ADITHYA SEKAR 5

3 7/24/2019 ADITHYA PRASATH 5

ADITHYA
4 7/24/2019 MUTHUSAMY NIL

PROPEL

ADITHYA

5 7/24/2019 SEC 4

ITW
ITW
ENGINEERING COMPANY
SETTING FINISHED FINISHED FABRICATION
DESCRIPTION PART NO PART NO
QTY WEIGHT QTY WEIGHT
MAIN COLUMN AC1 4 2.904
MAIN COLUMN AC1A 3 2.178
MAIN COLUMN AC1B 1 0.726
MAIN COLUMN AC2 2 1.262
MAIN COLUMN AC3 2 2.948
CABLE END COLUMN EC2 1 0.547
CABLE END COLUMN EC3 1 0.578
CABLE END COLUMN EC4 1 0.61
CABLE END COLUMN EC5 1 0.578
CABLE END COLUMN EC6 1 0.547
CABLE END COLUMN EC1 1 0.515
CABLE END COLUMN EC7 1 0.515
JACKBEAM JB1 1 3.536
CABLE END RAFTER AR6 2 0.634
CABLE END RAFTER AR7 2 0.642
CABLE END RAFTER AR8 2 0.359
CABLE END RAFTER AR9 1 0.557
RAFTER- C Grid AR1 2 1.206
RAFTER- C Grid AR2 2 0.912
RAFTER- C Grid AR3 2 0.912
RAFTER- C Grid AR4 2 1.282
RAFTER- C Grid AR5 1 0.756
RAFTER- B Grid AR1A 2 1.234
RAFTER- B Grid AR2A 2 0.94
RAFTER- B Grid AR3A 2 0.94
RAFTER- B Grid AR4A 2 1.308
RAFTER- B Grid AR5A 1 0.769
RAFTER- J,K AR1 4 2.412
RAFTER- J,K AR2 4 1.824
RAFTER- J,K AR3 4 1.824
RAFTER- J,K AR4 4 2.564
RAFTER- J,K AR5 2 1.512
RAFTER- M,N Grid AR1 2 1.206
RAFTER- M,N Grid AR5 2 1.512

STAIR CASE 2
RAFTER AR1 2 0.337
COLUMN AC1 2 0.629
GABLE TRAY GT1 1 0.311

MAIN COLUMN AC1 3 2.178


MAIN COLUMN AC1A 1 0.726
MAIN COLUMN AC1B 2 1.452
MAIN COLUMN AC3 2 2.948
JACK BEAM JB1 1 3.536
RAFTER- D,E Grid AR1 4 2.904
RAFTER- D,E Grid AR2 4 1.824
RAFTER- D,E Grid AR3 4 1.824
RAFTER- D,E Grid AR4 4 2.564
RAFTER- D,E Grid AR5 2 1.512
RAFTER- F, Q Grid AR2 2 0.912
RAFTER- F, Q Grid AR4 2 1.282

MAIN COLUMN AC1B 1 0.726


MAIN COLUMN AC1 1 0.726
TIE BEAM TB1 2 0.318
TIE BEAM ` TB2 12 1.908
JACK BEAM JB1 2 7.072
RAFTER- F Grid AR1 2 1.206
RAFTER- F Grid AR2 2 0.912
RAFTER- F Grid AR3 2 0.912
RAFTER- F Grid AR4 2 1.282
RAFTER- F Grid AR5 1 0.756
RAFTER- G,H Grid AR1 4 2.412
RAFTER- G,H Grid AR2 4 1.824
RAFTER- G,H Grid AR3 4 1.824
RAFTER- G,H Grid AR4 4 2.564
RAFTER- G,H Grid AR5 2 1.512

MAIN COLUMN AC1 3 2.178


MAIN COLUMN AC1A 2 1.452
MAIN COLUMN AC1B 1 0.726
MAIN COLUMN AC3 1 1.474
X-BRAZING 72

MAIN COLUMN AC1 3 2.178


MAIN COLUMN AC1A 3 2.178
MAIN COLUMN AC3 2 2.948
TIE BEAM TB2 14 2.226
JACK BEAM JB1 2 7.092
RAFTER- L Grid AR1 2 1.206
RAFTER- L Grid AR2 2 0.912
RAFTER- L Grid AR3 2 0.912
RAFTER- L Grid AR4 2 1.282
RAFTER- L Grid AR5 1 0.756

CANOPY AR24 2 0.61


CANOPY AR24A 1 0.315
CANOPY AR24C 1 0.315
CLET 60 0.144
FIRE FIGHTING SUPPORT FFS 40 1.32
STOOL COLUMN 9 0.23
FINISHED PAINT(mt)
Sub contract work Report
S.NO PROJECT NAME SUB CONTRACTOR NAME NO. OF PERSON WORKING

1 ITW M.K 7
2 ITW PRASATH 5
3 ITW SEKAR 5

4 MINDA M.R.K 6

5 SEC VELU SHEET GROUP 3


ADITHYA
6 SARAVANAN PAINTER 3
MURUGAN TEMPLE

Sec
S.NO PROJECT NAME SEC LABOUR DETAILS NO. OF PERSON WORKING

SARAVANAN
MURUGESHAN
1 ITW 4
L.KUMAR
MINEESH
2 ITW BOSE 1
MANOHARAN
YUVARAJ
3 ADITHYA AND PROPEL 4
PERIYANNAN
ALLIMUTHU
work Report 24-07-2019
DESCRIPTION PART NO QTY SETTING FINISHED

Cable Tray GT-1,2,3,4,5,6,7,8,9,10 10 10


Cable Tray GT-11,12,25,26,27,28 6 6
Cable Tray 6
MAIN COLUMN AC1A 2 2
MAIN COLUMN AC1 4 4

RAFTER AR1,AR2,AR3,AR4,AR5 11
COLUMN,CANOPY AC1,CANOPY 4

Sec Labour Work Report


DESCRIPTION PART NO QTY SETTING FINISHED

Cable tray GT- 13,14,15,16,17 6 5

Cable tray GT-1,2 2

Grane gandry beam 10

Rafter AR2,AR3,AR1 6
24-07-2019
WELDING FINISHED WORK DETAILS

3 Cable tray Setting work and welding work


2 Cable tray Setting work and welding work
Cable tray Chennel cutting work and sizing work

Column setting work

Tempravary shet vertical sheet fixing work

Adithya Rafter and murugan temple column,canopy primer painting work

ort
WELDING FINISHED WORK DETAILS

2 Cable tray setting and Welding work

2 welding work for prasath team

Propel crane gandry beam Enamel painting and Adithya rafter primer painting

You might also like