BAB IV

PENGOLAHAN DATA

4.1 WATER PASS


4.1.1 Perhitungan Jarak Optis (D)
Rumus :
D = (BA − BB) x 100
Ket: D = Jarak optis
BA = Benang atas
BB = Benang bawah
A. Perhitungan jarak optis untuk pergi (Patok belakang − Patok muka)

D P0 = (1,167 – 0,917) x 100 = 25 m


D P1 = (1,510 – 1,260) x 100 = 25 m 
D P0 ─ P1 = 50 m
D P1 = (1,839 − 1,439) x 100 = 40 m
D P2 = (2,444 – 2,405) x 100 = 40 m 
D P1 ─ P2 = 80 m
D P2 = (1,481 − 1,231) x 100 = 25 m
D P3 = (1,655 − 1,405) x 100 = 25 m 
D P2 ─ P3 = 50 m
D P3 = (1,920 − 1,720) x 100 = 20 m
D P4 = (1,565 − 1,365) x 100 = 20 m 
D P3 ─ P4 = 40 m
D P4 = (1,540 − 1,140) x 100 = 40 m
D P5 = (1,830 − 1,430) x 100 = 40 m 
D P4 ─ P5 = 80 m
D P5 = (1,518 – 1,118) x 100 = 40 m
D P6 = (1,667 − 1,267) x 100 = 40 m 
D P5 ─ P6 = 80 m

35
D P6 = (1,505 − 1,250) x 100 = 25,5 m
D P7 = (1,752 − 1,497) x 100 = 25,5 m 
D P6 ─ P7 = 51 m
D P7 = (1,487 − 1,157) x 100 = 33 m
D P8 = (1,516 − 1,186) x 100 = 33 m 
D P7 ─ P8 = 66 m
D P8 = (1,911 − 1,631) x 100 = 28 m
D P9 = (1,541 − 1,261) x 100 = 28 m 
D P8 ─ P9 = 56 m
D P9 = (1,498 − 1,298) x 100 = 20 m
D P10 = (1,543 − 1,343) x 100 = 20 m 
D P9 ─ P10 = 40 m
D P10 = (1,270 − 1,090) x 100 = 18 m
D P11 = (1,532 − 1,040) x 100 = 18 m 
D P10 ─ P11 = 36 m
D P11 = (1,444 − 1,054) x 100 = 39 m
D P12 = (1,430 − 1,040) x 100 = 39 m 
D P11 ─ P12 = 78 m
D P12 = (1,402 − 1,222) x 100 = 18 m
D P13 = (1,181 − 1,001) x 100 = 18 m 
D P12 ─ P13 = 36 m
D P13 = (1,525 − 1,285) x 100 = 24 m
D P14 = (1,630 − 1,390) x 100 = 24 m 
D P13 ─ P14 = 48 m
D P14 = (1,130 – 0,870) x 100 = 26 m
D P15 = (1,273 – 1,013) x 100 = 26 m 
D P14 ─ P15 = 52 m

36
B. Perhitungan jarak optis untuk pulang (Patok muka − Patok belakang)
D P1 = (1,400 − 1,160) x 100 = 24 m
D P0 = (1,995 − 1,735) x 100 = 26 m 
D P1 ─ P0 = 50 m
D P2 = (2,463 – 2,073) x 100 = 39 m
D P1 = (1,872 − 1,462) x 100 = 41 m 
D P2 ─ P1 = 80 m
D P3 = (1,545 − 1,305) x 100 = 24 m
D P2 = (1,386 − 1,126) x 100 = 26 m 
D P3 ─ P2 = 50 m
D P4 = (1,586 − 1,396) x 100 = 19 m
D P3 = (1,940 − 1,730) x 100 = 21 m 
D P4 ─ P3 = 40 m
D P5 = (1,845 − 1,455) x 100 = 39 m
D P4 = (1,544 − 1,134) x 100 = 41 m 
D P5 ─ P4 = 80 m
D P6 = (1,665 − 1,275) x 100 = 39 m
D P5 = (1,525 − 1,115) x 100 = 41 m 
D P6 ─ P5 = 80 m
D P7 = (1,813 − 1,568) x 100 = 24,5 m
D P6 = (1,577 − 1,312) x 100 = 26,5 m 
D P7 ─ P6 = 51 m
D P8 = (1,502 − 1,182) x 100 = 32 m
D P7 = (1,485− 1,145) x 100 = 34 m 
D P8 ─ P7 = 66 m
D P9 = (1,593 − 1,323) x 100 = 27 m
D P8 = (1,915− 1,625) x 100 = 29 m 
D P9 ─ P8 = 56 m
D P10 = (1,555 − 1,365) x 100 = 19 m
D P9 = (1,428− 1,218) x 100 = 21 m 
D P10 ─ P6 = 40 m

37
D P11 = (1,695 − 1,525) x 100 = 17 m
D P10 = (1,467− 1,277) x 100 = 19 m 
D P7 ─ P6 = 36 m
D P12 = (1,428 − 1,048) x 100 = 38 m
D P11 = (1,445 − 1,045) x 100 = 40 m 
D P7 ─ P6 = 78 m
D P13 = (1,167 – 0,997) x 100 = 17 m
D P12 = (1,450 − 1,260) x 100 = 19 m 
D P7 ─ P6 = 36 m
D P14 = (1,630 − 1,400) x 100 = 23 m
D P13 = (1,664 − 1,414) x 100 = 25 m 
D P7 ─ P6 = 48 m
D P15 = (1,510 − 1,260) x 100 = 19 m
D P14 = (1,384 − 1,114) x 100 = 21 m 
D P7 ─ P6 = 52 m

38
4.1.2. Perhitungan jarak optis rata-rata (Dr)

Rumus :

Ket: Drpergi= Jarak


D optis rata-rata
D pulang
Dr 
Dpergi = 2Jarak optis (Patok belakang − Patok muka)
Dpulang = Jarak optis (Patok muka − Patok belakang)

DrP0 – P1 = 50
+ 50 = 50 m
2
DrP1 – P2 = 80 + 80 = 80 m
2
DrP2 – P3 = 50 + 50 = 50 m
2
DrP3 – P4 = 40 + 40 = 40 m
2
DrP4 – P5 = 80 + 80 = 80 m
2
DrP5 – P6 = 80 + 80 = 80 m
2
DrP6 – P7 = 51 + 51 = 51 m
2
DrP7 – P8 = 66 + 66 = 66 m
2
DrP8 – P9 = 56 + 66 = 56 m
2
DrP9 – P10 = 40 + 40 = 40 m
2
DrP10 – P11 = 36 + 36 = 36 m
2
DrP11 – P12 = 78 + 78 = 78 m
2
DrP12 – P13 = 36 + 36 = 36 m
2
DrP13 – P14 = 48 + 48 = 48 m
2
DrP14 – P15 = 52 + 52 = 52 m
2
4.1.3 Perhitungan beda tinggi (∆H) patok utama
Rumus:
∆ H = BT belakang − BT muka

39
Ket : ∆H = Beda tinggi
BT = Benang tengah
∑∆H = Jumlah total beda tinggi

1. Perhitungan beda tinggi untuk pergi (Patok belakang − Patok


muka)
∆H. P0 − P1 = (1.949 – 1.381) = 0,568 m
∆H. P1 − P2 = (1.639 – 2,244) = -0,605 m
∆H. P2 − P3 = (1.356 – 1.530) = -0,174 m
∆H. P3 − P4 = (1.820 – 1.465) = 0,355 m
∆H. P4 − P5 = (1.340 – 1,630) = -0,290 m
∆H. P5 − P6 = (1.318 – 1.467) = -0,149 m
∆H. P6 − P7 = (1,378 – 1.625) = -0,247 m
∆H P 7 − P8 = (1,322 – 1,351) = -0,029 m
∆H P 8 − P9 = (1,771 – 1,401) = 0,370 m
∆H P9 − P10 = (1,398 – 1,443) = -0,045 m
∆H P10 −P11 = (1,118 – 1,442) = -0,324 m
∆H P11 −P12 = (1,249 – 1,235) = 0,014 m
∆H P12− P13 = (1,312 – 1,091) = 0,221 m
∆H P13− P14 = (1,405 – 1,510) = -0,105 m
∆H P14− P15 = (1 – 1,143) = -0,143 m

2. Perhitungan beda tinggi untuk pulang (Patok muka − Patok


belakang)
∆H. P1 − P0 = (1.280 – 1.865) = -0,585 m
∆H. P2 − P1 = (2,268 – 1,667)= 0,601 m

40
∆H. P3 − P2 = (1.425 – 1.256)= 0,169 m
∆H. P4 − P3 = (1.491 – 1.835)= -0,344 m
∆H. P5 − P4 = (1.650 – 1.339)= 0,311 m
∆H. P6 − P5 = (1.470 – 1,320)= 0,150 m
∆H. P7 − P6 = (1,691 – 1.445)= 0,246 m
∆H. P8 − P7 = (1.342 – 1.315)= 0,027 m
∆H. P9 − P8 = (1.458 – 1.770)= -0,312 m
∆H. P10 − P9 = (1.460 – 1.323)= 0,137 m
∆H. P11 – P10 = (1.610 – 1.372)= 0,238 m
∆H. P12 − P11 = (1,238 – 1.245)= -0,007 m
∆H. P13 – P12 = (1.082 – 1.355)= -0,273 m
∆H. P14 – P13 = (1.515 – 1.490)= 0,025 m
∆H. P15 − P14 = (1.385 – 1.249)= 0,136 m

4.1.4 Perhitungan beda tinggi rata-rata (∆Hr)


Rumus :
∆Hr pergi ∆Hr pulang
Hr
2

41
Ket : ∆Hr = Beda tinggi rata-rata
∆H pergi = Beda tinggi rata-rata pergi
∆H pulang = Beda tinggi rata-rata pulang
∑∆Hr = Jumlah total beda tinggi rata-rata

∆Hr P0 − P1 = 0,568 + 0,585 = 0.576 m


2
∆Hr P1 − P2 = (-0,605) + 0,601 = -0,603 m
2
∆Hr P2 – P3 = (-0,174) + 0,169 = -0,171 m
2
∆Hr P3 – P4 = 0,355 + 0,344 = 0,349 m
2
∆Hr P4 – P5 = (-0,290) + 0,311 = -0,300 m
2
∆Hr P5 – P6 = (-0,149) + 0,150 = -0.149 m
2
∆Hr P6 – P7 = (-0,247) + 0,246 = -0,246 m
2

∆Hr P7 – P8 = (-0,029) + 0,027 = -0,28 m


2

∆Hr P8 – P9 = (0,370) + 0,312 = 0,341 m


2

∆Hr P9 – P10 = (-0,045) + 0,137 = -0,091 m


2

∆Hr P10 – P11 = (-0,324) + 0,238 = -0,281 m


2

∆Hr P11 – P12 = (0,014) + 0,007 = 0,010 m

42
2

∆Hr P12 – P13 = (0,221) + 0,273 = 0,247 m


2

∆Hr P13 – P14 = (-0,105) + 0,025 = -0,065 m


2

∆Hr P14 – P15 = (-0,143) + 0,007 = -0,139 m


2

4.1.7 Perhitungan tinggi titik patok utama


Rumus :
H = HP ± ∆Hr

43
Ket : H = tinggi titik patok utama
Hr = diketahui tinggi patok
∆Hr = beda tinggi setelah koreksi

H P0 =147,000 m
H P1 =147,000 + 0.576 = 147,576 m
H P2 =147,576 + (-0,603) = 146,973 m
H P3 =146,973 + (-0,171) = 146,802 m
H P4 =146,802 + 0,349 = 147,151 m
H P5 =147,151 + (-0.300) = 146,851 m
H P6 =146,851 + (-0,149) = 146,702 m
H P7 =146,702 + 0,246 = 146,948 m
H P8 =146,948 + 0,028 = 146,976 m
H P9 =146,976 + 0,341 = 147,347 m
H P10 =147,347 + 0,091 = 147,408 m
H P11 =147,408 + (-0,281) = 147,127 m
H P12 =147,127 + 0,010 = 147,137 m
H P13 =147,137 + 0,247 = 147,384 m
H P14 =147,384 + (-0,065) = 147,319 m
H P15 =147,319 + (-0,139) = 147,18 m

4.I.8 Perhitungan Beda Tinggi Detail


Rumus :
∆Hd = BT patok utama – BT patok detail

44
Ket : ∆Hd = Beda tinggi detail
BT = Benang tengah
P0
∆Hd0– a = 1,949 – 1,875 = 0,074 m
∆Hd0– b = 1,949 – 1,734 = 0,215 m
∆Hd0– c = 1,949 – 1,737 = 0,212 m
∆Hd0– 1 = 1,949 – 1,935 = 0,014 m
∆Hd0– 2 = 1,949 – 1,924 = 0,025 m
∆Hd0– 3 = 1,949 – 1,894 = 0,055 m

P1

∆Hd1– a = 1,639 – 1,624 = 0,015 m


∆Hd1– b = 1,639 – 1,563 = 0,076 m
∆Hd1– c = 1,639 – 1,581 = 0,058 m
∆Hd1– 1 = 1,639 – 1,615 = 0,024 m
∆Hd1– 2 = 1,639 – 1,636 = 0,003 m
∆Hd1– 3 = 1,639 – 1,637 = 0,002 m

P2

∆Hd2–a = 1,356 – 1,364 = - 0,008 m


∆Hd2– b = 1,356 – 1,618 = -0,262 m
∆Hd2– c = 1,356 – 1,351 = 0,005 m
∆Hd2– 1 = 1,356 – 0,937 = 0,419 m
∆Hd2– 2 = 1,356 – 0,525 = 0,831 m
∆Hd2– 3 = 1,356 – 1,054 = 0,302 m

P3

∆Hd3– a = 1,820 – 1,617 = 0,203 m


∆Hd3– b = 1,820 – 1,555 = 0,265 m

45
∆Hd3– c = 1,820 – 1,49 = 0,33 m
∆Hd3– 1 = 1,820 – 1,783 = 0,037 m
∆Hd3– 2 = 1,820 – 1,535 = 0,285 m
∆Hd3– 3 = 1,820 – 1,724 = 0,096 m

P4

∆Hd4– a = 1,340 – 1,172 = 0,168 m


∆Hd4– b = 1,340 – 1,055 = 0,285 m
∆Hd4– c = 1,340 – 1,120 = 0,22 m
∆Hd4– 1 = 1,340 – 1,342 = -0,002 m
∆Hd4– 2 = 1,340 – 1,375 = -0,035 m
∆Hd4– 3 = 1,340 – 1,369 = -0,029 m

P5

∆Hd5– a = 1,318 – 1,270 = -0 ,048 m


∆Hd5– b = 1,318 – 1,340 = -0 ,002 m
∆Hd5– c = 1,318 – 1,350 = -0,032 m
∆Hd5– 1 = 1,318 – 1,329 = -0,011 m
∆Hd5– 2 = 1,318 – 1,420 = -0,102 m
∆Hd5– 3 = 1,318 – 1,220 = -0,098 m

P6

∆Hd6– a = 1,378 – 1,396 = -0,018 m


∆Hd6– b = 1,378 – 1,321 = 0,057 m
∆Hd6– c = 1,378 – 1,312 = 0,066 m

46
∆Hd6– 1 = 1,378 – 1,346 = 0,032 m
∆Hd 6– 2 = 1,378 – 1,135 = 0,243 m
∆Hd6– 3 = 1,378 – 1,140 = 0,238 m

P7

∆Hd7– a = 1,322 – 1,300 = 0,022 m


∆Hd7– b = 1,322 – 1,293 = 0,029 m
∆Hd7– c = 1,322 – 1,375 = - 0,053 m
∆Hd7– 1 = 1,322 – 1,357 = - 0,035 m
∆Hd7– 2 = 1,322 – 1,227 = 0,095 m
∆Hd7– 3 = 1,322 – 1,110 = 0,212 m

P8

∆Hd8– a = 1,771 – 1,769 = 0,002 m


∆Hd8– b = 1,771 – 1,766 = 0,005 m
∆Hd8– c = 1,771 – 1,760 = 0,011 m
∆Hd8– 1 = 1,771 – 1,782 = -0,011 m
∆Hd8 – 2 = 1,771 – 1,788 = - 0,017 m
∆Hd8– 3 = 1,771 – 1,783 = - 0,0012m

P9

∆Hd9– a = 1,398 – 1,423 = -0,025 m


∆Hd9– b = 1,398 – 1,393 = 0,005 m
∆Hd9– c = 1,398 – 1,377 = 0,021 m
∆Hd9– 1 = 1,398 – 1,375 = 0,423 m
∆Hd9– 2 = 1,398 – 1,367 = 0,031 m
∆Hd9– 3 = 1,398 – 1,363 = 0,035 m

P10

∆Hd10– a = 1,180 – 1,064 = 0,116 m


∆Hd10– b = 1,180 – 1,066 = 0,114 m
∆Hd10– c = 1,180 – 1,085 = 0,095 m

47
∆Hd10– 1 = 1,180 – 1,622 = - 0,442 m
∆Hd10– 2 = 1,180 – 1,218 = - 0,038 m
∆Hd10– 3 = 1,180 – 1,274 = -0,094 m

P11

∆Hd11– a = 1,249 – 1,141 = 0,108 m


∆Hd11 – b = 1,249 – 1,202 = 0,047 m
∆Hd11– c = 1,249 – 1,539 = -0,29 m
∆Hd11– 1 = 1,249 – 1,25 = -0,001 m
∆Hd11– 2 = 1,249 – 1,258 = - 0,009 m
∆Hd11– 3 = 1,249 – 1,200 = 0,049 m

P12

∆Hd12– a = 1,312 – 1,300 = 0,012 m


∆Hd12– b = 1,312 – 1,327 = -0,015 m
∆Hd12– c = 1,312 – 1,330 = -0,018 m
∆Hd12– 1 = 1,312 – 1,442 = -0,013 m
∆Hd12– 2 = 1,312 – 1,209 = 0,103 m
∆Hd12– 3 = 1,312 – 1,186 = 0,126 m

P13

∆Hd13– a = 1,405 – 1,279 = 0,126 m


∆Hd13– b = 1,405 – 1,14 = 0,265 m
∆Hd13– c = 1,405 – 1,125 = 0,28 m

48
∆Hd13– 1 = 1,405 – 1,580 = -0,175 m
∆Hd13– 2 = 1,405 – 1,582 = -0,177 m
∆Hd13– 3 = 1,405 – 1,559 = -0,154 m

P14

∆Hd14– a = 1,000 – 0,998 = 0,002 m


∆Hd14– b = 1,000 – 0,953 = 0,047 m
∆Hd14– c = 1,000 – 0,944 = 0,056 m
∆Hd14– 1 = 1,000 – 1,035 = - 0,035 m
∆Hd14– 2 = 1,000 – 1,095 = - 0,095 m
∆Hd14– 3 = 1,000 – 1,145 = - 0,145 m

4.1.9 Perhitungan Tinggi Titik Detail

Rumus :

Hd = TT patok utama + Beda Tinggi detail


Ket : Hd = Tinggi titik detail

49
TT = Tinggi Titik

∆Hd P0 = 147 m
∆Hd a = 147 + 0,074 = 147,074 m
∆Hd b = 147 + 0,215 = 147,215 m
∆Hd c = 147 + 0,212 = 147,212 m
∆Hd 1 = 147 + 0,014 = 147,014 m
∆Hd 2 = 147 + 0,025 = 147,025 m
∆Hd 3 = 147 + 0,055 = 147,055 m

∆Hd P1 = 147,576 m
∆Hd a = 147,576 + 0,015 = 147,591 m
∆Hd b = 147,576 + 0,075 = 147,652 m
∆Hd c = 147,576 + 0,058 = 147,634 m
∆Hd 1 = 147,576 + 0,024 = 147,6 m
∆Hd 2 = 147,576 + 0,003 = 147,579 m
∆Hd 3 = 147,576 + 0,002 = 147,578 m

∆Hd P2 = 147,973 m
∆Hd a = 147,973 + (-0,008) = 147,965 m
∆Hd b = 147,973 + 1,618 = 147,711 m
∆Hd c = 147,973 + 1,351 = 147,978 m
∆Hd 1 = 147,973 + 0,419 = 148,122 m
∆Hd 2 = 147,973 + 0,831 = 148,804 m
∆Hd 3 = 147,973 + 0,302 = 148,275 m

∆Hd P3 = 146,802 m
∆Hd a = 146,802 + 0,203 = 147,005 m
∆Hd b = 146,802 + 0,265 = 147,067 m
∆Hd c = 146,802 + 0,33 = 147,132 m
∆Hd 1 = 146,802 + 0,037 = 146,839 m

50
∆Hd 2 = 146,802 + 0,285 = 147,087 m
∆Hd 3 = 146,802 + 0,096 =146,898 m

∆Hd P4 = 147,151 m
∆Hd a = 147,151 + 0,168 = 147,319 m
∆Hd b = 147,151 + 0,285 = 147,436 m
∆Hd c = 147,151 + 0,22 = 147,371 m
∆Hd 1 = 147,151 + 0,002 = 147,149 m
∆Hd 2 = 147,151 + (-0,035) = 147,116 m
∆Hd 3 = 147,151 + (-0,029) = 147,122 m

∆Hd P5 = 146,851 m
∆Hd a = 146,851 + 0,048 = 146,899 m
∆Hd b = 146,851 + (-0,22) = 146,829 m
∆Hd c = 146,851 + (-0,032) = 146,819 m
∆Hd 1 = 146,851 + (-0,011) = 146,84 m
∆Hd 2 = 146,851 + (-0,102) = 146,749 m
∆Hd 3 = 146,851 + (-0,098) = 146,949 m

∆Hd P6 = 146,702 m
∆Hd a = 146,702 + (-0,018) = 146,684 m
∆Hd b = 146,702 + 0,057 = 146,759 m
∆Hd c = 146,702 + 0,066 = 146,768 m
∆Hd 1 = 146,702 + 0,032 = 146,734 m
∆Hd 2 = 146,702 + 0,243 = 146,945 m
∆Hd 3 = 146,702 + 0,238 = 146,94 m
∆Hd P7 = 146,948 m
∆Hd a = 146,948 + 0,022 = 146,97 m
∆Hd b = 146,948 + 0,029 = 146,977 m
∆Hd c = 146,948 + (-0,053) = 146,895 m
∆Hd 1 = 146,948 + (-0,035) = 146,913 m

51
∆Hd 2 = 146,948 + 0,212 = 146,043 m
∆Hd 3 = 146,948 + 0,235 = 146,16 m

∆Hd P8 = 146,976 m
∆Hd a = 146,976 + 0,002 = 146,978 m
∆Hd b = 146,976 + 0,005 = 146,981 m
∆Hd c = 146,976 + 0,011 = 146,987 m
∆Hd 1 = 146,976 + (-0,011) = 146,965 m
∆Hd 2 = 146,976 + (-0,047) = 146,959 m
∆Hd 3 = 146,976 + (-0,012) = 146,964 m

∆Hd P9 = 147,317 m
∆Hd a = 147,317 + (-0,025) = 147,292 m
∆Hd b = 147,317 + (-0,005) = 147,322 m
∆Hd c = 147,317 + 0,021 = 147,388 m
∆Hd 1 = 147,317 + 0,023 = 147,34 m
∆Hd 2 = 147,317 + 0,031 = 147,348 m
∆Hd 3 = 147,317 + 0,035 = 147,352 m
∆Hd P10 = 147,408 m
∆Hd a = 147,408 + 0,116 = 147,524 m
∆Hd b = 147,408 + 0,114 = 147,522 m
∆Hd c = 147,408 + 0,095 = 147,503 m
∆Hd 1 = 147,408 + (-0,442) = 146,966 m
∆Hd 2 = 147,408 + (-0,038) = 147,37 m
∆Hd 3 = 147,408 + (-0,094) = 147,314 m

∆Hd P11 = 147,127 m


∆Hd a = 147,127 + 0,108 = 147,235 m
∆Hd b = 147,127 + 0,047 = 147,174 m
∆Hd c = 147,127 + (-0,29) = 147,837 m
∆Hd 1 = 147,127 + (-0,001) = 147,126 m

52
∆Hd 2 = 147,127 + (-0,009) = 147,118 m
∆Hd 3 = 147,127 + (-0,049) = 147,176 m

∆Hd P12 = 147,137 m


∆Hd a = 147,137 + 0,012 = 147,149 m
∆Hd b = 147,137 + 0,015 = 147,122 m
∆Hd c = 147,137 + (-0,018) = 147,119 m
∆Hd 1 = 147,137 + (-0,13) = 147,007 m
∆Hd 2 = 147,137 + 0,103 = 147,24 m
∆Hd 3 = 147,137 + 0,126 = 147,263 m

∆Hd P13 = 147,384 m


∆Hd a = 147,384 + 0,126 = 147,51 m
∆Hd b = 147,384 + 0,265 = 147,649 m
∆Hd c = 147,384 + 0,28 = 147,664 m
∆Hd 1 = 147,384 + (-0,175) = 147,209 m
∆Hd 2 = 147,384 + (-0,177) = 147,207 m
∆Hd 3 = 147,384 + (-0,154) = 147,23 m

∆Hd P14 = 147,319 m


∆Hd a = 147,319 + 0,002 = 147,321 m
∆Hd b = 147,319 + 0,047 = 147,366 m
∆Hd c = 147,319 + 0,056 = 147,3755 m
∆Hd 1 = 147,319 + (-0,035) = 147,284 m
∆Hd 2 = 147,319 + (-0,095) = 147,224 m
∆Hd 3 = 147,319 + (-0,145) = 147,174 m

4.1.10 Perhitungan Kemiringan Patok Utama/Memanjang

Rumus :

M = (TT patok utama belakang – TT patok utama muka) x100%


Jarak patok

53
Ket : TT = Tinggi titik

M = Persentase kemiringan patok utama/memanjang

M P0 - P1 = (147 – 147,576 ) x100% = -1,152 %


50
M P1 - P2 = (147,576 – 146,973) x100% = 0,753 %
80
M P2 - P3 = (146,973 – 146,802) x100% = 0,342 %
50
M P3 - P4 = (146,802 – 146,151) x100% = -0,872 %
40
M P4 - P5 = (146,151 – 146,851) x100% = 0,375 %
80
M P5 - P6 = (146,851 – 146,702) x100% = 0,186 %
80
M P6 - P7 = (146,702 – 146,948) x100% = -0,482 %
51
M P7 - P8 = (146,948 – 147,976) x100% = -0,042 %
66
M P8 - P9 = (147,976 – 147,317) x100% = -0,608 %
56
M P9 - P10 = (147,317 – 147,408) x100% = -0,227 %
40

M P10 - P11 = (147,408 –147,127) x100% = 0,780 %


36
M P11 - P12 = (147,127 – 147,137) x100% = -0,012 %
78
M P12 - P13 = (147,137 – 147,384) x100% = -0,686 %

54
46
M P13 - P14 = (147,384 – 147,319) x100% = 0,135 %
48
M P14 - P15 = (147,319 – 147,18) x100% = 0,25 %
52

4.1.11 Perhitungan Kemiringan Patok Detail/Melintang

Rumus :

m = (Tinggi titik patok utama – tinggi detail) x100%


Jarak detail

55
Ket : m = Persentase kemiringan patok detail melintang

Detail P0
m P0 - a = (147,074 – 147 ) x100% = 3,700 %
2
m P0 - b = (147,215 – 147 ) x100% = 5,375 %
4
m P0 - c = (147,212 – 147 ) x100% = 4,240 %
5
m P0 - 1 = (147,014 – 147 ) x100% = 0,700 %
2
m P0 - 2 = (147,025 – 147 ) x100% = 0,625 %
4
m P0 - 3 = (147,055 – 147 ) x100% = 1,100 %
5

Detail P1
m P1 - a = (147,991 – 147,576) x100% = 20,750 %
2
m P1 - b = ( 147,65 – 147,576 ) x100% = 1,875 %
4
m P1 - c = (147,634 – 147,576) x100% = 1,160 %
5
m P1 - 1 = (147,600 – 147,576) x100% = 1,200 %
2
m P1 - 2 = (147,579 – 147,576 ) x100% = 0,075 %
4
m P1 - 3 = (147,578 – 147,576 ) x100% = 0,040 %
5

Detail P2
m P2 - a = (147,965 – 146,973 )x100% = 49,600 %
2
m P2 - b = (147,711 – 146.973)x100% = 18,450 %
4

56
m P2 - c = (147,978 – 146,973)x100% = 20,100 %
5
m P2 - 1 = (148,392 – 146,973)x100% = 70,950 %
2
m P2 - 2 = (148,804 – 146.973)x100% = 45,775 %
4
m P2 - 3 = (148,275 – 146,973)x100% = 26,040 %
5

Detail P3
m P3 - a = (147,005 – 146,802)x100% = 10,150 %
2
m P3 - b = (147,067 – 146,802)x100% = 6,625 %
4
m P3 - c = (147,132 – 146,802)x100% = 6,600 %
5
m P3 - 1 = (146,839 – 146,802)x100% = 1,850 %
2
m P3 - 2 = (147,087 – 146,802)x100% = 7,125 %
4
m P3 - 3 = (146,898 – 146,802)x100% = 1,920 %
5

Detail P4
m P4 - a = (147,319 – 147,151) x100% = 8,400 %
2
m P4 - b = (147,436 – 147,151) x100% = 7,125 %
4

57
m P4 - c = (147,371 – 147,151) x100% = 4,400 %
5
m P4 - 1 = (147,149 – 147,151) x100% = -0,100 %
2
m P4 - 2 = (147,116 – 147,151) x100% = -0,875 %
4
m P4 - 3 = (147,122–147,151) x100% = - 0,580 %
5

Detail P5
m P5 - a = (146,684 – 146,851) x100% = 2,400 %
2
m P5 - b = (146,759 – 146,851) x100% = -0,550 %
4
m P5 - c = (146,819 – 146,851) x100% = -0,640 %
5
m P5 - 1 = (146,84 – 146,851) x100% = -0,275 %
2
m P5 - 2 = (146,749 – 146,851) x100% = -0,550 %
4
m P5 - 3 = (146,949 – 146,851) x100% = 1,960 %
5

Detail P6
m P6 - a = (146,684 – 146,702) x100% = -0,900 %
2
m P6 - b = (146,759 – 146,702) x100% = 1,425 %
4

58
m P6 - c = (146,768 – 146,702) x100% = -1,425 %
5
m P6 - 1 = (146,734 – 146,702) x100% = 1,600 %
2
m P6 - 2 = (146,945 – 146,702) x100% = 6,075 %
4
m P6 - 3 = (146,94 – 146,702) x100% = 4,760 %
5

Detail P7
m P7 - a = ( 146,97 – 146,948) x100% = 1,100 %
2
m P7 - b = (146,977 – 146,948) x100% = 0,725 %
4
m P7 - c = (146,895 – 146,948) x100% = -1,060 %
5
m P7 - 1 = (146,913 – 146,948) x100% = -1,750 %
2
m P7 - 2 = (146,043 – 146,948) x100% = 2,375 %
4
m P7 - 3 = (146,16 – 146,948) x100% = 4,240 %
5

Detail P8
m P8 - a = (146,978 – 146,976) x100% = 0,100 %
2
m P8 - b = (146,981 – 146,976) x100% = 0,125 %
4
m P8 - c = (146,987 – 146,976) x100% = 0,220 %

59
5
m P8 - 1 = (146,965 – 146,976) x100% = -0,550 %
2
m P8 - 2 = (146,959– 146,976) x100% = -0,425 %
4
m P8 - 3 = (146,964– 146,976) x100% = -0,240 %
5

Detail P9
m P9 - a = (147,292 – 147,317) x100% = -1,250 %
2
m P9 - b = (147,322 – 147,317) x100% = 0,125 %
4
m P9 - c = (147,338 – 147,317) x100% = 0,420 %
5
m P9 - 1 = (147,34 – 147,317) x100% = 1,150 %
2
m P9 - 2 = (147,348– 147,317) x100% = 0,775 %
4
m P9 - 3 = (147,352– 147,317) x100% = 0,700 %
5
Detail P10
m P10 - a = (147,524 – 147,408) x100% = 5,800 %
2
m P10 - b = (147,522 – 147,408) x100% = 2,850 %
4
m P10 - c = (147,503 – 147,408) x100% = 1,900 %
5
m P10 - 1 = (147,966 – 147,408) x100% = -22,100 %
2
m P10 - 2 = (147,37 – 147,408) x100% = -0,950 %
4
m P10 - 3 = (147,314 – 147,408) x100% = -1,880 %
5
Detail P11
m P11 - a = (147,235 – 147,127) x100% = 5,400 %
2
m P11 - b = (147,174 – 147,127) x100% = 1,175 %
4
m P11 - c = (146,837 – 147,127) x100% = -5,800 %

60
5
m P11 - 1 = (147,126 – 147,127) x100% = -0,050 %
2
m P11 - 2 = (147,118 – 147,127) x100% = -0,225 %
4
m P11 - 3 = (147,149 – 147,127) x100% = 0,980 %
5
Detail P12
m P12 - a = (147,149 – 147,137) x100% = 0,600 %
2
m P12 - b = (147,122 – 147,137) x100% = -0,375 %
4
m P12 - c = (147,119 – 147,137) x100% = -0,360 %
5
m P12 - 1 = (147,007 – 147,137) x100% = -6,500 %
2
m P12 - 2 = (147,24 – 147,137) x100% = 2,575 %
4
m P12 - 3 = (147,263 – 147,137) x100% = 2,520 %
5
Detail P13
m P13 - a = (147,51 – 147,384) x100% = -6,300 %
2
m P13 - b = (147,649 – 147,384) x100% = 6,625 %
4
m P13 - c = (147,664 – 147,384) x100% = 5,600 %
5
m P13 - 1 = (147,209 – 147,384) x100% = -8,750 %
2
m P6 - 2 = (147,207 – 147,384) x100% = -4,425 %
4
m P6 - 3 = (147,23 – 147,384) x100% = -3,080 %
5

Detail P14
m P14 - a = (147,321 – 147,319) x100% = 0,100 %
2
m P14 - b = (147,366 – 147,319) x100% = -1,175 %
4
m P14 - c = (174,375 – 147,319) x100% = 1,120 %

61
5
m P14 - 1 = (147,284 – 147,319) x100% = -1,750 %
2
m P14 - 2 = (147,224 – 147,319) x100% = -2,375 %
4
m P14 - 3 = (147,174 – 147,319) x100% = -2,900 %
5

62