1.

Pre job planning and  All necessary tools &  Ensure that appropriate permit to
preparation equipment available and in work is in place and work site
good condition and thoroughly inspected, get familiar with
functioning. other obstruction.
 Heat stress if work carried out  Conduct tool box meeting and explain
during summer. expected hazards and necessary
 Simultaneous/conflicting precautions.
operation, condition such  All necessary tools & equipment
loading/unloading, rig working available and in good condition and
near by proper functioning.
Grinding/Welding/Lifting/Cutti  Maintain a comfortable distance from
ng old line at work site. different work activities, be more
attentive make aware of your work to
other crew.
 Maintain minimum distance of 4 meters
from overhead power line.
 Check surrounding area, ground
condition, wind condition, overhead
power lines.

 Check lifting capacity of Crane and


radius of operation.
 Ensure Crane is placed on hard, level
ground, outriggers fully extended and
placed under timber mats.
 Ensure the Crane is having spark
arrester when working in restricted
area
2.Setting Crane for the load to  Hand Injury to the rigger.  Keep hands out of pinch point while
be lifted  Failure of slings or D-shackles. rigging, Use hand gloves.
 Know the weight to be lifted and its
Sequence of Job Components & Potential Hazards, Concerns Safe Practice/Procedure
configuration, Check Weather
Tasks condition ,
Wind speed(low, high)
7.Clean work site, Work  Incorrect placing  Correct
Emphasis more item.
missing to STOP WORK if they
Completed, final thorough check see anything unsafe.
 Remove all surplus supports, pipes,
up, hand over trashes.
3.Lifting the load  Lifted material falling.  Barricade the area of Crane operation
 Hitting people or existing place warning.
I THEREFORE UNDERSTAND AND AGREE TO THIS PROCEDURE AND SAFETY MEASURE THERE IN AND FULLY AWARE OF MY DUTIES AND
RESPONSIBILITIES AND I HAVE REVIEWED JSA AT SITE AND DISCUSSED WITH ALL WORKERS
SIGNATURE OF PERMIT USER:
1 6
2 7
3 8
4 9
5 10
11 18
12 19
13 20
14 21
15 22
16 23
17 24
25 32