The document lists 7 projects that an engineering firm is involved in, including the project code and name, client, current design and construction stages. It shows that the firm is currently involved in the design stage for the Senandung Budiman SDN BHD project, and the tender, construction and CCC stages for several Setia Ecohill SDN BHD projects.
The document lists 7 projects that an engineering firm is involved in, including the project code and name, client, current design and construction stages. It shows that the firm is currently involved in the design stage for the Senandung Budiman SDN BHD project, and the tender, construction and CCC stages for several Setia Ecohill SDN BHD projects.
The document lists 7 projects that an engineering firm is involved in, including the project code and name, client, current design and construction stages. It shows that the firm is currently involved in the design stage for the Senandung Budiman SDN BHD project, and the tender, construction and CCC stages for several Setia Ecohill SDN BHD projects.
CONSULTANCY SERVICES FOR "FEASIBILITY STUDY AND DETAILED DESIGN (ROAD,BRIDGES & CULVERTS) FOR PROPOSED ROAD EIDMONEY TO CHOWFALDANDI BRIDGE APPROACH (APPROXIMATE LENGTH 18.00 KM TO 25.00 KM)" EXTENDED UPTO COX'S BAZAR (REVISED LENGTH 36.900 KM) UNDER COX'S BAZAR ROAD DIVISION (0+000 CHAINAGE AT COX'S BAZAR)