BILL OF MATERIALS
I.D. NO DESCRIPTION UNIT QTY
GENERAL REQUIREMENTS
Mobilization/Temporary Structures, Utilities
lot 1.00
and Services/Demobilization/Permits
Sub-total
1.00 Earthworks
1.01 Clearing and Grubbing sq.m 140.00
1.02 Structural Excavation cu.m 75.80
1.03 Backfilling and Compaction cu.m 50.00
1.04 Gravel Bedding G-1 cu.m 5.00
1.05 Select Fill cu.m 13.00
1.06 Soil Poisoning sq.m 140.00
Sub-Total
39,000.00
307,456.50
1,100.00
80.00 20.00 880.00 220.00
850.00
20.00 5.00 680.00 170.00
300.00
20.00 5.00 240.00 60.00
3,500.00
200.00 50.00 2,800.00 700.00
56,250.00
3,750.00 937.50 45,000.00 11,250.00
1,890.00
108.00 27.00 1,512.00 378.00
1,250.00
250.00 62.50 1,000.00 250.00
1,875.00
150.00 37.50 1,500.00 375.00
850.00
68.00 17.00 680.00 170.00
1,755.00
108.00 27.00 1,404.00 351.00
40.00 10.00 560.00 140.00 700.00
320.00 80.00 960.00 240.00 1,200.00
350.00 87.50 1,400.00 350.00 1,750.00
3,000.00 750.00 3,000.00 750.00 3,750.00
25.00 6.25 875.00 218.75 1,093.75
95,488.75
31506.50 /m²
TWO STOREY RESIDENTIAL BUILDING WITH ROOF
DETAILED ESTIMATES
COST (MATERIALS AND LABOR AND LABOR ON
I.D. NO DESCRIPTION
GENERAL REQUIREMENTS
Mobilization/Temporary Structures, Utilities
Php
and Services/Demobilization/Permits
Plastering Php
5.01 Portland Cement Php
5.02 Washed Sand Php