Y ENGINEERING gl
LTH & SAF
Designing and calculating for flexible Horizontal
Lifelines based on design code CSA 2259.16
by Mr Hoe Yee Pin, Trainer and Consultant, and Dr Goh Yang Miang, Assistant
Professor, Department of Building, School of Design and Environment, National
University of Singapore
This article uses two worked examples to ilustrate the fundamental design approach and
‘aleulations ofa Horizontal Lifeline (HLL) system, based on the design code Canadian Standards
Association 2259.16. The upcoming Singapore Standard on ‘Specification for Design of Active
Fal Protection Systems’ is based on the CSA 2259.16, The authors are members of the
‘Working Group for this upcoming Singapore Standard,
HORIZONTAL LIFELINES.
alin om igs the ead aie of wrk aes
Sgepoe (Mn o Manpower 2013) Eo tome ie
‘chars renee i protean tems One
ftefillprtecionsystensconmoyused nthe conto
and maitenane nasties hora Les (HLL).
‘a Lic conponart that ecend hori fom one
ed enchorage to sateen corso abe ne rade
‘or wes, fre rope wire rape. o od colts wih end
termratons (Conan ants Aten 2004 pres
4 corto achrage ne t which ees can attach thet
lar and other ares equernt are 1.
—_ = ss
Pe pe rl in Sn a po
‘Non-manufatured versus manufactured HLL systems
Hilseantepenranestrtamporyandeiters matcred
or nonmsnieured sen
A mate lave per refers to a compete sem
‘ese Oy + marfctuer caven. 9 nonmanttred
‘sem rts aster tis rot dengrec by» malar
‘emayormay rete dare Proescna goes PE)
Nenmanactured stems rural arb om sepate
fl arest gen components which can be fm erent
ufos
Non mautacred stems ae mere conereny used than
manlacured sere nthe Segarore eoaacion sty
(oe. Got et a 2012) However non-mardactred tons
|e more where to component eos nd roqure
‘mar conden 0 ene claire oft ston
bp Sper is conenon prac to mig tisk by
‘erwang «PE odes he Hs Base on amy by Hoe
5 QDI2 eee ou of fae tr sap fom he
‘onstrctinindsry were dered erdoved by PEs Since
noremanufactwed Hs which re deg Oy PE re wily
ed tis peat tt PEs properly cesn KL store
fineton efecey
DESIGN OF HLL SYSTEMS
‘Common design mistakes
‘The pup of an HLL or ay other lat ste) isto
rime uy tthe srs. the event of Two cron
isates cesar rae re:
* Consigeng onthe sent pos of he anchorages and
the HLL compere and nage to eve the oflors
te wr) sh he Manian Pre Fore (MA
+ Us sac asta pare te rami erponent
greatedina
‘hese mites hae ed to svargh requrerents bing prosiy
ndenestinted adie ay acrsbengneglected te
eg (Wang Hoe et a 2014,
Desig erteria for an effective HLL
‘i refrac to Fr | fer a HL. st to be eine
inprotecing ie wx te flowing eta hae to bees
‘The stm components and thi anchorages ae of
deqate srengh.n ore wisn the Masur rest
Lesd (MAL) oF MAR prevent ae
~The MAS expenencod bythe weet) win acetble
let mine he pot oinres
+ Thecarance heigh eqiedinateetnthe derance
_alabe,t0 prevent te we) Fo hitig the ound or an
‘hracion th path
ee
(October 2014 THE SINGAPORE ENGINEER | 21Gg Heart a SAFETY ENGINEERIN
Comiince wth egal requirements + hike enet of tre & eng ft densce sae fo
‘Athenee he Werle Sey ard Heath (Wonk AL reer he er fom Ming an bec. he pound het
Hess) Regul 2017 Regt I egies ha sree
“A. are sytem of 0d ensructon sound mutes WORKED EXAMPLE 1: SINGLE-SPAN HLL WITH
dedadegate Srengh SINGLE USER,
Fire 2 hows a common dha stip of HLL wih 3
+ Als anetontmicopontersntaterene stating Fare? ors cmon Gi an ti of
‘ee acing te eres ers boo
ere 2a pe
“The flovngifomation pron Fig 2
ope darts 410mm
| Nomina Rope ZasicHodhs — € = SS8GRa
Nomina Rope Unig e34Nin
From th shove we an aad:
=310
Batty
(05 f,-( SHO
sre Cah)
=o Fee)
tooooteia
a 9988200715 m
'CoasmanEaTy)
22 | THESINGAPORE ENGINEER October 2014Stage tof al arest: onset
‘Assuming be user fal a midpan ofthe HUL The HLL
vil 1g 1 esp sa before t begins to pide a gears
‘ecleraton fre to sop the fl (gure 3). Cap agi the
Ste where the ia legth of he eal, a exer he
recension fore, ules int two ewer sagt Inet
‘eer rom oe anchorage tothe poet ofl resto
eon Siage aie
“acon ourarasi we ave to mala some asanpsonon he prota re 5
4a
et ite
Deng hei above HLL
archos
HEALTH & SAFETY ENGINEERING je
appcton rd to th net aot acorae (Cnn |
Senders Aaceston 209) = pied obo spt |
Ine Hoc ing Pago Teeen |
agcose@ = 10"
semesters
“Wet more acre ration nt |
ranfocurer dma ae aes essere as
‘ey ae he osu lowed 28 |
Par Pownch te A ceri i
| 542259 16 cae 73.22 where Fig = 08 Fan sree
| sss2ePare 2 str to Cea 2u50i1
Note We can abo ak = 3.2 (Goh 2014)
Using he msirum user weg lowedin $58.
‘Asnarng harness D-igis an average of 1m fom
ter at
ho 5-H chor pon) = 15.
asm
= (Gis) -
Ociober 2014 THE SINGAPORE ENGINEER | 23BB HEALTH & SAFETY ENGINEERING
‘Ween ao eet the Fee el FF) earns the
Frehoes-tl, “DSH(s8082"10%}2= 2589
‘Stage 2 of fll ares: energy absorption
‘The usar bing are Erry ae i ad
perCsA 225516 Case
Sage 21 Kei ney greet in thea wl be sorbed
byte elongation or sgpng ofthe HL cle (ber an
a The miboite sgh wil cant ul te ce
the aye (reaches he deployment eee of he anes
Psoral Erg saber FEA)
Stage 22 At the PEAS clone farce, te FEA wl be
\epoyed ands asus to be sll respon fr the
sosrpon oth ena serrated by he ing war (HL
“resto nop ending inthis)
‘Stage of tl arrest: Energy dissipation and tall arest
‘The PEA wil cote to extend uni he potential arg
‘etl sorbed an herein ery Ue ro. The ll
‘Analysing the fall using energy batance
(Onespprachistobaince th eran enero and aro
for tge 2 an then Sage 3.
Siage 2 The fa ener garanted i sbiord by the
"Bug ofthe HLL el, We fa th vue ofthe mire
sag 9) 2 ih the ce th yd (eal othe
PEA deloymant foes. For srengh ctins the PEA
rari depart ce should be used as per CSA
ZIS3.16 Chase 7331. Taw we find be mibokt seg
by suesing an array vale for, then rag? et
Stage 3 tn F reaches the PEA deleynent rc, the FEA
| deployed. The sage ofthe HL hs aed ahcrbed Us
ne he PEA il abr Ua at tend
Honawee 2 the PEA extending eno i abo ing
erated in aon t he ener rere ing he fo
[AL Ths ene genet by the frat oer he ol |
ance ho) Uae te ial energy sores he LL at
96 Uses be carpet rbd for he we
came aso
“To eae te cart witha abaya fo aPEA then
esto BEA uh remain eer U0. ele
do tot we fave to leat he lowing paramere
Doak as
Mipoint sag (rn) _ | 03 05 OSS 0551 05515
| caewen doo) Toor 16059 00K 104) 104
[ atsereionny [em cas 008 ton |
Ten nae 0) | ee ns mn mn on
finan a
ners Se.
Every Sed in La zeeye900niss «107% = omnia
aieaee
licen SP raaeeyanss)" = O64 IN
i ss a
24 | THESINGAFORE ENGINEER October 2014HEALTH & SAFETY ENGINEERING jf!
Forces caalaorsne PEA are deploment xe a
shoud row be wed teas. pr CSA 225816 Clave 7332
“The etry ha Ben ily sear by he HLL and PEA,
2rd tefl snow carpeted area (NE A stato can
‘ie whan thee ere reaing even aft th PEA
rte 1 16 mason rth i he apy ofthe PEA
‘eccoued nd the PEA a term)
Results of analysis
Werke Sty and Hath (Work At Hep) Regulation
QO) fequres he fre stam to ve ene fa
leararce alle to peer. the usr Fo Nig an bec,
the ground ote suc:
\ 2 2 ‘
eA teon(n) me 006s Se
Te Fal ce aa nua) gana
Es nee ee a ase asa
roy absoesty A Una Sen Fat, \ ue 5
E ; “4 a
emanngerew (im) Ut Uan-Uu-Un 098015
‘This crane neces te hares al Ong ie dng
the fxs and a cearace magn (aso known 3 ay
anc) EW wi same x19 Be 03 ahr ag
ermal wating
“Te earance arg (as pr CSA 159.16 8262}
e=05+0! 4-4)
06 +0 (05515 49960155 x10) = 480m
Let ut eeu the ass essa the een dry
cana ora fecive .
Fer the Hu tobe oft an assert ofthe
Ste where the HLL tobe ntl ro be
Fab clarance rege C, sam Cred out er at thre tae 4582 m of
arance aaiae|
See the capiiy ofthe PEA wae not exec
asian res Fe ences ‘ths ft fre on th se eed (required
Mas fo th wes a Ly WH WAH Rg IQ) oan accep 6 IN
spaced in CSA 225.16 Clea 422.
pars
‘The anthraes and wie ope ees ob able
te widutand tis MAL wth an sonal sy
acor of 13 a per CSA 2259.16 Chute 622
410518,
October 2014 ‘THE SINGAPORE ENGINEER | 25| jp Heacti & SAFETY ENGINEERING
WORKED EXAMPLE 2: SINGLE-SPAN HLL WITH
[MULTIPLE USERS
For both wlty nd produc reso, an HLL shud be
eegned for at le vo veers. Usg the sre parameters
Aplin the unorg etr f 15 for wo ing wes
folowing paneer are asunpton are adusted as tows
‘Syren a par CSA 2259 6 Chane 7272 See teins
ump tor Mr ene arco tort
Pear
2 ca Pea Merge
fg $BINIIS = BAIN
Deport
3 235
: we We now use te above aut as ta fora to:
ear Weitere un = shite Fu F105 HN
poi gm) et [ro 05 088s uers
Ciera tegen) =f P= lous 10127 oom 10087100 a6
Va eeson ans 01 a" 006 amo ami
Tenn ane 0) Rs 6H RM mB WR He
Force in Lanyard (ON) a 451 1787768116148 SO
PEA enon (| oss Oss
Teta Fal iar ¢m) ses aries
Ene terest fang Nm) Ue Whe oo ge aa
Ene shcrbe by PEA as = Fanta = Fata oe
etenson (Nn) aa *
Reming vere) UU Ue Ua-Uee 030008
26 | THESINGAPORE ENGINEER October 2014‘Aan we row erate fr Yn Ur he fi ene tty
tiated es =O
“heated denance magn now
E506 +01 (0667S 4908215 « 109 = 0662 m
“The cance forte eq lunged mass
Goythye +, # E= 3713 +03 +0662 = 4675 m
The derance regu forth tier to (8 par CSA
2239 16 Gnee 827)
C= Gy O5C oe = (164575) (06% 4560) = 4783
Using te same metodo a above and epping rent
Dios hues | Aues
ye)
im Are
Foe HAF (2)
(eeperend by he
oe)
Falcce
requeed Co ()
45a | on | aan | aon
ein eet
aad MAL 6)
(otezcorsing |
ware)
pp aa | 510
Mammen | las S950
sre eure
creat wire
rose aN) |
Lping Score tres: ours fl a ale beans
“he reais ne unnmared a lows
(OTHER SCENARIOS
The abowe two eager a singed to tate the
Sxdoneral deen pmeters HlLe dpe it Be eal
ver can be more epeted requrng sopstated a.
Stover HL senaron can hie
+ Energy abuorter corporate inne wih the HLL whe
tance ra wl app
+ Fsipospan Hs whee he dak rom the ctor spre i
be puted exo te span where thea al before he HL,
HEALTH & SAFETY ENGINEERING gfe
beg 0 tericn up alecing he iss The rope most
vital decrease wit he longer lengh of wire rope sed
+ Pretason feces in the HLL chang ue to temperature
fea,
+ His are anche to able end anchorages ea ft
od anchorage |
‘CONCLUSION
HLLs are commen used to protect wares and mince
jis to users aU However sbergh rexurements are
‘fen sy undanesites ae ert lay STs Were
aged to cnn dy ees
‘A ropery dsed HL aod o mre ary tote ver
rd compy ith he rlear el reqtements Th he
Soin cera ned o conser tne MA ote as the MAL,
tothe aches ad the cranes heght renee
This aide derensrats the ie of the srergy balnce
spproich to eat the stove menos eign ce ft
Shjespan Hi ste eaonthe desig code CSA 7259.5,
‘ones fl ws fst red lowed by 29056
I ishoped tat sate can rte arent of te art
usetes tht deugnes sho tka corerson
‘hee py ad elation of
ACKNOWLEDGEMENT
The authors he atone he Que Fal Protection
ghee course conairtes by Mr Grog Sma Chel Engee
High Enncering Coan cosraner a Noth Aria
The lalate cesrbed heh ae bated on an Excl
temple cated by Sra.
REFERENCES
Mitr of Manpower (2013) Onan Sty and Heath
Dision Arnal Report 202 tip gonsgDocunets!
‘salty hesthreportsatOSHO-AR2OIZOSHD AR2O12_
parla
Canaan StadarteAaroctin (2008) 2259604 Onin of
‘aie FabProteron Syme Ona Cann Suns
‘ascii,
Goh ¥ M2014 7 Epic Inasigtin of the Average
Deleon Force of Poona Fa rst Erp Absorbers
Jour of Corstucion Engneerng nd Mangenert. Amenan
Society of Ci Ergnters pubes ni),
Hoe BGahY M.Sen SY (2012) Dai fal eet Stas
‘Afevew of be Coren este Srgsoare Cancion
ase, CIBWO99 irtortionl Conese on Medling wad
uldng Hest aS 1011 Setar 2012, Segre
‘wang Q.Hee RGohY M014 Sing he badenee
in Horaontl fine Deg Case Sues Supers, CIS
W089 inenatons Conference on AetevngSutibie
Cnsestion Heat nd S623 ne 2014 Lind Sadan
Octover 2014 THE SINGAPORE ENGINEER | 27