Mi eA Oy aitEach horizontal drainage pipe ‘shall be provided
with acleanout at its upper terminal.
+ Run-of piping’ ‘which is more than,.15 meters in
total developed’ length shall be provided with a
cleanout Vand at every, 15 meter lengthor a fraction
thereof.
CLEAN - (UT
o 1
nits wi | a aul
ie {5m (MAR) e 15m (MAX,> ears, 1eY=9 as a rT yee C
th wales iain iissCleanouts may be omitted om a horizontal. drain line
less than 1.5 meter in length unless such line is
serving sinks or urinals.CAV |
EUS fata
POR Nara am cea mel Tema Te me
eT Cellet) Un mee sel
building drain and it Tatas
Cine ]U (6) ae Print at Perms end of
building drain and extended to grade, mayb
EMViaqal dt (eve Mm ColmeeTa MU No)