I. Program Title: Construction of Pathways


1.1. Entrance to the principal’s office 15 meters.
1.2. From Grade 6 Sangyaw to Kindergarten 10 meters.
1.3. From Grade 5 Mabini side to the Exit gate 15 meters.
1.4. Beside Grade 1, Grade 7, Grade 6 30 meters.

II. Types of construction: Connecting pathways

III. Allocation (Budget): Php. 10, 500.00

IV. Construction Start: June 04, 2019

V. Completion: 5 days

VI. Finance / Sponsored by: Brigada Eskwela Fund 2019

VII. Bill of materials:

PARTICULARS OR # UNIT COST AMOUNT


(Php) (Php)

4 cubic course sand 0409 750.00 per cubic 3, 000.00


10 sacks of cement 0409 250.00 per sack 2, 500.00
Water - - -
2 x 3 x 12 coco lumber - Used construction -
material
TOTAL EXPENSES 5, 500.00

VIII. Labor / Manpower needed:

1. 1 skilled mason (500/day), 2 laborers (250/person/day)

IX. Mode of construction / Detailed:

1. Layout of desired area.


2. Preparation of materials for pathway construction.
3. Mixing cement and coarse sand with water.
4. Clearing the area ready for cementing.
5. Cementing pathways.
6. Ten to fifteen days (10-15) seasoning period.
X. Working plan sketch:
School Exit Gate

Pathway

Pathway
Principal’s
Office Pathway

SCHOOL GATE

Prepared by:

LEONARDO E. FERNANDEZ
Brigada Eskwela Coordinator

ELEANOR R. SABIT NEMFA ENGRACIAL WENA B. CEMANES


Program / Innovation Committee Technical Working Committee Infrastructure Committee

Approved by:

LARRY. P. PEÑALOSA, Dev. Ed. D.


School Brigada Eskwela Chairman