EPIC FOR UPGRADATION OF AC UPS UNITS IN NGL3,

MESAIEED

TITLE: CABLE LAYING IN TRENCH CHECKLIST

DOC NO. EI-E/003B CONTRACT NO. GC12105200


PROJECT NO. SYSTEM/SUB-SYSTEM NO.
LENGTH DESCRIPTION
CABLE TAG NO. LOCATION
DRAWING NO.
ITEM CHECKLIST DESCRIPTION RESULT REMARKS

AFTER CABLE LAYING IN TRENCH

1 Check cable spacing

2 Inspect cable for damage

3 Cable bending radius within acceptable limits

4 Cable pulled to correct marks

5 Cable tags provided along the length

6 Cable protection tiles and caution tapes are installed

7 Trench filled and compacted

8 Other services restored to normal condition

9 Backfill the trench (after placing the cover) and compact

10 Cable route markers installed

11 Trench route drawing marked up (As- built mark-up)

12 Check that all the ducts have been sealed properly (if applicable)

Remarks:-

Dopet Construction Dopet QA/QC QP


Name
Position
Signature
Date

DOC NO : 3513-M3GE-2-25-0019 REV. A PAGE 12 OF 29