BOQ SUMMARY

Project Name: 11 Atienza

Element :  Beam

No. Material Unit Quantity Rate $ Cost $


1 Concrete C28 (cum) 3.06 4350.00 13298
Sub Total 3.06 13,297

2 Rebar #10 (Fy276) (kg) 372.35 22.00 8192


3 Rebar #12 (Fy276) (kg) 48.28 22.00 1062
4 Rebar #16 (Fy276) (kg) 523.97 22.00 11527
Sub Total 944.59 20,781

5 Shuttering (sq.M) 30.57 100.00 3057


Sub Total 3,057

Grand Total 37,135

Design Metrics
1 Consumption : Reinforcement/Concrete ratio = 308.99 kg/cum
2 Consumption : Reinforcement/Planarea = 11.81 kg/sqm
3 Consumption : Concrete/Planarea = 0.04 cum/sqm
4 Concrete % C28 = 100.00 % 
5 Shuttering  = 10.00 sqm/cum