The Red Sea Project


Contractor Prequalification

October 2018
CONTENTS
THE RED SEA PROJECT ................................................................................

1. PROJECT BACKGROUND
1.1 The Red Sea Development Company (TRSDC) ....................................................... 2
1.2 Project Overview ......................................................................................................... 2
1.3 Project Team ............................................................................................................... 4

2 PREQUALIFICATION (PQ) .................................................................. 4


2.1 Overview ...................................................................................................................... 4
2.2 Submission Requirements ........................................................................................ 4
2.3 Marketing Materials .................................................................................................... 5
2.4 Timetable ......................................................................... Error! Bookmark not defined.
2.5 Return of Enquiry ....................................................................................................... 5

APPENDICES
APPENDIX A: STATEMENT OF CONFLICTS OF INTEREST

APPENDIX B: COMPANY PROFILE AND DECLARATION

APPENDIX C: RELEVANT EXPERIENCE

APPENDIX D: ORGANIZATION CHART

APPENDIX E: SIGNED AUDITED ACCOUNTS

APPENDIX F: QUALITY ASSURANCE STATEMENT

APPENDIX G: HEALTH & SAFETY STATEMENT

Page 1 of 18
1 Project Background
1.1 The Red Sea Development Company (TRSDC / Employer)
The Red Sea Development Company (TRSDC / Employer) is a closed joint stock company, fully
funded by the Public Investment Fund (PIF), a Saudi Arabian sovereign wealth fund. PIF was
established by Royal Decree M/24 on 17 August 1971. Its mandate is to provide financing support for
projects of strategic significance to the Saudi national economy. Today, PIF has a diverse portfolio
made up of approximately 200 investments in a wide range of asset classes internationally, of which
around 20 are listed on Tadawul, the Saudi Stock Exchange. PIF also manages several companies to
support innovation, diversification and non-oil sector development within the Kingdom.

1.2 The Red Sea Project Overview


1.2.1 TRSDC is spearheading the development of a complex mega project along the Red Sea, in the West
of the Kingdom of Saudi Arabia (The Red Sea Project).
1.2.2 The strategic objective of the Project is to transform the Umluj & Wajh region into a unique luxury
tourist destination with a focus on the ecology and wellness, for local and international visitors.
1.2.3 The Project will leverage the inherent advantages of the location to offer a best-in-class tourism
experience and to position the Kingdom on the global tourism map.
1.2.4 The Project will have significant socio-economic impact, including: attracting foreign direct investment,
increasing KSA GDP and the promotion of healthy lifestyles.
1.2.5 The approximate Project site area is 28,000 square kilometres, with over 200 km shoreline (See Figure
1).
1.2.6 We seek to safeguard ecologically valuable habitats, seek to enhance and restore degraded habitats
and to achieve an overarching objective of ‘Biodiversity Net Gain’ and contribution to the ‘National
Biodiversity Strategies and Action Plan’. To foster education, research and learning for visitors and
local people alike and hence be an exemplar in demonstrating how a landscape scale project can
enhance the natural environment benefiting people, biodiversity and the economy.

Figure 1 – Project Boundary

Page 2 of 18
1.2.7 It is anticipated that The Red Sea Project will be established as a SEZ. Within the SEZ, other than
certain reserved matters, legislation will be enacted to replace KSA Base Economy Law with other
rules and laws that will be applicable within the zone. These proposed laws will cover a range of legal
matters including but not limited to Corporations, Municipal, Contract, Intellectual Property,
Environmental, Land, Tort, Utilities and Infrastructure, Labour, Dispute resolution and Criminal code
and set to international benchmarked standards but not conflicting with Sharia Law.

WhileTRSDC has been incorporated under the laws of KSA, it is intended that the company will be
transferred to the SEZ as soon as the Zone laws are passed to enable the transition. TRSDC will
require all contracts (even ones previously executed) to be transferrable and subject to the SEZ once
those applicable laws are passed. This right of transfer/change in law is to be included in all contracts
and the contract should prevent the Contractor from being entitled to any claim for cost and/ or time in
relation to the transfer/change.

Page 3 of 18
1.3 Project Team
1.3.1 TRSDC are the Employer on this Project and will self-manage the Works.

2 Prequalification (PQ)
2.1 Overview
2.1.1 TRSDC are issuing this invitation to prequalify contractors. This prequalification exercise will enable a
long-list of capable contractors to be approved by TRSDC for the Project. We will then issue our own
Non-Disclosure Agreement (NDA) to prequalified and selected contractors. In your return covering
letter you should formally state your interest in the packages of work outlined.

2.1.2 The intention of this PQ is to shortlist contractors with:


 An interest in delivering projects in the Project location
 Experience in delivering successful projects in the Middle East and KSA
 Experience in fast track delivery of projects, including off-site fabrication, modular and
prefabricated buildings
 Financial standing to undertake projects
 Capability to deliver quality of build
 Robust Health & Safety & Quality Management Systems
 Understanding and ability to deliver to the best global standards for Environment and Sustainability

2.1.3 All costs incurred by the responder in the preparation, submission and presentation of a response to
this PQ shall be borne entirely by the responder and shall not be reimbursed by TRSDC regardless of
the conduct or outcome of this prequalification process.

2.2 Submission Requirements


2.2.1 The following information must be provided as part of this PQ.

Letter of Letter of introduction outlining why your company should be


introduction shortlisted (4 pages)
Appendix A Statement of Conflicts of Interest
Appendix B Company Profile and Signed Declaration
Appendix C Relevant Experience
Appendix D Organization Chart
Appendix E Signed Audited Accounts
Appendix F Quality Assurance Statement
Appendix G Health & Safety Statement
Appendix

Page 4 of 18
2.3 Marketing Materials
2.3.1 It is not necessary to include general marketing or promotional material as any such material will be
discarded.
2.3.2 Our ability to short list will be directly linked to the specific information requested in this PQ.

2.4 Return of Enquiry


2.4.1 The PQ enquiry shall be returned in soft copy only to the email address in accordance with the covering
letter issued with this Prequalification document.

2.4.2 TRSDC declare that all information provided as part of your response to this PQ shall be held in the
strictest confidence and restricted to use on this Project (unless you expressly allow it’s use for other
Projects).

Page 5 of 18
APPENDIX A: Statement of Conflicts of Interest
Provide a statement on any known or potential conflicts of interest.

Statement

1 Description of Contractors principal activities

2 Number of years’ experience as Contractor/ Consultant:

 In home Country

 In the Middle East

 In the G.C.C.

 In K.S.A.

3 Name & Address of Sponsor in the KSA (If Applicable)

Telephone No

Email:

Declaration: We confirm that we accept legal responsibility for the guarantee if the above information:

Name: _________________________________________

Signed:
_________________________________________

On behalf of:
_________________________________________

Date:
_________________________________________

Stamp:

Page 6 of 18
APPENDIX B: Company Profile and Declaration
Complete and submit the table below.

Item Response

Company Name:
(If a Joint Venture, provide information for all parties to the joint
venture as well as the Joint Venture entity itself)

Main Contact Person:

Address:

Telephone:

Email:

Website:

Registration & Licensing Details:

State which Company, (if any) is legally


authorized to conduct contracting within the
Kingdom of Saudi Arabia (attach details)

Origin of Company:

Zakat, Saudization, GOSI & VAT registration

High Commission of Industrial Safety (HCIS)


Certificate

Associated Companies:

Declaration
We confirm that all information provided with this Pre-Qualification is correct and that we have no objection to
any of our previous employers/ suppliers being contacted in connection with our trade standing or credit
worthiness.

Name: _________________________________________

Signed:
_________________________________________

Position:
_________________________________________

On behalf of:
_________________________________________

Date:
____________________________

Stamp and Signature…………………………………………………………………………………………

Page 7 of 18
APPENDIX C: Relevant Experience
Select your Discipline

Asset Class None

Construction ☐
Contractor ☐
Investor ☐
Utilities ☐
Infrastructure ☐
Energy ☐
Water ☐
Transport ☐
Rail ☐
Civils ☐
Marine ☐
Hospitality ☐
Fit Out ☐
Telecoms ☐
Security ☐
IT Systems ☐
Other ☐

Page 8 of 18
APPENDIX C: Relevant Experience
Indicate which asset class(s) you have relevant experience in.

Asset Class Sub-Asset Class None Single1 Multiple2

Hospitality Hyper Luxury Hotel ☐ ☐ ☐


Luxury Hotel ☐ ☐ ☐
Upscale Hotel ☐ ☐ ☐

Residential Luxury Villa ☐ ☐ ☐


High Quality Apartments ☐ ☐ ☐
Staff Accommodation ☐ ☐ ☐
Labour Accommodation ☐ ☐ ☐

Commercial Retail ☐ ☐ ☐
Office ☐ ☐ ☐

Community Services Hospital ☐ ☐ ☐


Clinic ☐ ☐ ☐
Police Station ☐ ☐ ☐
Fire Station/ Emergency services ☐ ☐ ☐
Recreation facilities ☐ ☐ ☐

Education Schools ☐ ☐ ☐

1
Single means if only one project undertaken under the sub-asset class
2
Multiple means if more than one project undertaken under the sub-asset class

Page 9 of 18
Asset Class Sub-Asset Class None Single1 Multiple2

Transport Airport ☐ ☐ ☐
Roads ☐ ☐ ☐

High Complex Bridges ☐ ☐ ☐

Offshore Access Bridges ☐ ☐ ☐

Ordinary Bridges ☐ ☐ ☐

Utilities Plant Rooms ☐ ☐ ☐


Power Transmission ☐ ☐ ☐
Sewage Treatment ☐ ☐ ☐
Water Treatment ☐ ☐ ☐
Solid Waste ☐ ☐ ☐
Solar Power ☐ ☐ ☐
Desalination ☐ ☐ ☐

External Works Landscaping ☐ ☐ ☐


Car Parking / Hardscaping ☐ ☐ ☐
(Theatre, auditorium, convention
Conference Centre
centre) ☐ ☐ ☐

Marine
Marine Construction and
Infrastructure ☐ ☐ ☐

Berth ☐ ☐ ☐

Dredging ☐ ☐ ☐

Page 10 of 18
Asset Class Sub-Asset Class None Single1 Multiple2

Jetty ☐ ☐ ☐

Quay Wall ☐ ☐ ☐

Sea Wall ☐ ☐ ☐
Other Areas of
expertise ☐ ☐ ☐

For each of the asset classes checked above, list details of up to five (5) most notable projects completed or
largely completed within last five (5) years.

Project 1 Project 2 Project 3 Project 4 Project 5

Asset class:

Name of Project:

Client:

Area:

Construction Value (USD):

Year of appointment and completion:

Scope of Service:

Special Points of Interest (e.g. off-site


prefabrication, off-shore/island
development, fast-track schedule,
development in environmentally
sensitive areas)
Additionally, list the five (5) most relevant projects completed or largely completed in KSA and the GCC
region.

Page 11 of 18
Project 1 Project 2 Project 3 Project 4 Project 5

Asset class:

Name of Project:

Client:

Area:

Construction Value (USD):

Year of appointment and completion:

Scope of Service:

Special Points of Interest (e.g. off-site


prefabrication, off-shore/island
development, fast-track schedule,
development in environmentally
sensitive areas)

Page 12 of 18
APPENDIX D: Organization Chart
Describe your organisation and include an organization chart(s) with personnel numbers showing your
company structure (Including parent, subsidiaries, and associated companies).

List the Board Directors/Senior Executives of your organization and their roles.

Item Response

Total number of key personnel including


Company Directors, Contract Managers, and
Project Managers.

Number of labourers directly hired:

Number of labourers sub-contracted:

Page 13 of 18
APPENDIX E: Signed Audited Accounts

Item Response

Number and value of contracts executed


in the last 3 Years (in USD):

Number and value of current contracts


(in USD):

Accounts: Summarise the turnover and profitability in the following


table (in USD):

Year Turnover Profitability

Attach the three years of signed audited


accounts

Within the last 5 years, has the Company


had to pay financial penalties or had
payment deducted from monies due,
arising from failure to perform in
accordance with contractual obligations?

Has the company had a contract


terminated prematurely during the last 5
years? If yes, provide details

Have you ever been in arbitration or


litigation proceedings? If yes, provide
details

Page 14 of 18
APPENDIX F: Quality Assurance Statement

Item Response

Attach a copy of your quality policy


statement

If you have been successfully assessed


by an accredited third-party certification
body please give the following details:
Scope of certification and works
locations covered:
Name of certification body:
Date of Initial Assessment:
Certificate number and expiry date
(if any):

Do you operate a management system


meeting the requirements of one of the
ISO 9000 series of standards? If yes,
please specify.

Page 15 of 18
APPENDIX G: Health & Safety Statement

Item Response

Attach a copy of your Health and Safety


Statement

Provide name, title and CV of your most


senior Safety person

For any major accidents and fatalities, summarise in the table below, provide a summary of
the incident, lessons learned, and changes made within your organisation to limit the
likelihood of reoccurrence:

Year* Year* Year*

Employees
Cumulative Working Hours
Number of Fatalities
Number of Lost Time Injuries (recordable)
Number of Medical Treatment Cases
Number of Restricted Work cases
Number of Occupational Illness Cases
Number of Lost Work Days
First Aid
Near Misses
Dangerous Occurrences
Environmental Incidents
AFR (per 100,000 working hours)

* Past Three Years

Page 16 of 18
APPENDIX E: OmniClass Table 22 Classification
Indicate which asset class(s) you have relevant experience in.

OmniClass Number Level 1 Title Check Box

22-01 00 00 General Requirements



22-02 00 00 Existing Conditions

22-03 00 00 Concrete

22-04 00 00 Masonry

22-05 00 00 Metals

22-06 00 00 Wood, Plastics, and Composites

22-07 00 00 Thermal and Moisture Protection

22-08 00 00 Openings

22-09 00 00 Finishes

22-10 00 00 Specialties

22-11 00 00 Equipment

22-12 00 00 Furnishings

22-13 00 00 Special Construction

22-14 00 00 Conveying Equipment

22-21 00 00 Fire Suppression

22-22 00 00 Plumbing

22-23 00 00 Heating, Ventilating, and Air-Conditioning (HVAC)

Page 17 of 18
OmniClass Number Level 1 Title Check Box

22-25 00 00 Integrated Automation



22-26 00 00 Electrical

22-27 00 00 Communications

22-28 00 00 Electronic Safety and Security

22-31 00 00 Earthwork

22-32 00 00 Exterior Improvements

22-33 00 00 Utilities

22-34 00 00 Transportation

22-35 00 00 Waterway and Marine Construction

22-40 00 00 Process Integration

22-41 00 00 Material Processing and Handling Equipment

22-42 00 00 Process Heating, Cooling, and Drying Equipment

22-43 00 00 Process Gas and Liquid Handling, Purification, and
Storage Equipment ☐
22-44 00 00 Pollution and Waste Control Equipment

22-45 00 00 Industry-Specific Manufacturing Equipment

22-46 00 00 Water and Wastewater Equipment

22-48 00 00 Electrical Power Generation