Spare part Material GB 5310

Chemical GB 5310 ASTM A106


(Material Yang Pecah Grede
elements Grede 20G Gr A
Pembanding) (Sample B) 20MnG
C 0.21 0.18 0.17-0.24 0.17-0.24 0,25
Si 0.18 0.21 0.17-0.37 0.17-0.37 0.1
Mn 0.72 0.74 0.35-0.65 0.70-1.00 0,27-0,93
P 0.01 0.01 ≤0.030 ≤0.030 0.035
S 0.01 0.01 ≤0.030 ≤0.030 0.035
Cr 0.07 0.08 ≤0.25 ≤0.25 0.4
Mb 0.07 0.07 ≤0.15 ≤0.15 0.15
Cu 0.09 0.1 ≤0.20 ≤0.20 0.4
Ni 2.11 2.27 ≤0.25 ≤0.25 0.4
V 0.01 0.01 ≤0.08 ≤0.08 0.08

Spare part Material GB 5310


Chemical GB 5310
(Material Yang Pecah Grede
elements Grede 20G
Pembanding) (Sample B) 20MnG
C 0.21 0.18 0.17-0.24 0.17-0.24
Si 0.18 0.21 0.17-0.37 0.17-0.37
Mn 0.72 0.74 0.35-0.65 0.70-1.00
P 0.01 0.01 ≤0.030 ≤0.030
S 0.01 0.01 ≤0.030 ≤0.030
Cr 0.07 0.08 ≤0.25 ≤0.25
Mb 0.07 0.07 ≤0.15 ≤0.15
Cu 0.09 0.1 ≤0.20 ≤0.20
Ni 2.11 2.27 ≤0.25 ≤0.25
V 0.01 0.01 ≤0.08 ≤0.08
DIN 17175
Gr St 35.8

0.17
0.10-0.35
0.40-0.80
0.030
0.030
Lokasi Ketebalan (mm)

t1
Ukuran ketebalan Standar
A 5
B 5
C 5
D 5
E 5
F 5
G 5
H 5

Chart Title Titik Ketebalan (mm)


6
Diameter
t1
5
A 5
4
Ketebalan

B 5
3
2
C 5
1 D 5
0 E 5
A B C D E F G H F 5
Titik Diameter G 5
H 5
Keteba l an Des ai n Ketebal a n Aktua l

Titik Ketebalan (mm)


Grafik Ketebalan Titik Sample 2
Diameter
6 t1
5
5 5 5 5 4.8 A 5
4
Axis Title

4.5
33.9 B 5
2 C 5
1
0 D 5
A B0 C D E F G H E 5
Axis Title F 5
G 5
Ketebal a n Desa i n Ketebal an Aktual
0
A B0 C D E F G H
Axis Title

Ketebal a n Desa i n Ketebal an Aktual


H 5

Titik Ketebalan (mm)


Grafik Ketebalan Titik Sample 3
Diameter
6
t1
5
A 5
4 B 5
Ketebalan

3 C 5
2 D 5
E 5
1
F 5
0
A B C D E F G H G 5
Titik Diameter H 5

Keteba l an Des ai n Ketebal a n Aktua l

Titik Ketebalan (mm)


Chart Title
Diameter
B t1
5 B 5
A C
C 5
D 5
Ketebal an Desa i n E 5
Ketebal an Aktua l 5
H 0 D F
G 5
H 5
A 5
G E

5
Penguran Persentas
Titik Ketebalan (mm) gan Titik Ketebalan (mm)
Diameter ketebala i keausan Diameter
t1 t0 (mm) % t1
B 5 4 0.5 10% A 5
C 5 4.6 1 40% B 5
D 5 5 0.4 12% C 5
E 5 5 0 0% D 5
F 5 5 0 0% E 5
G 5 5 0 0% F 5
H 5 4.9 0 0% G 5
A 5 4.5 0.1 4% H 5

6
Penguran Persentas
Titik Ketebalan (mm) gan Titik Ketebalan (mm)
Diameter ketebala i keausan Diameter
t1 t0 (mm) % t1
A 5 4.5 0.5 10% B 5
B 5 3.9 1.1 22% C 5
C 5 4.6 0.4 8% D 5
D 5 4.8 0.2 4% E 5
E 5 5 0 0% F 5
F 5 5 0 0% G 5
G 5 5 0 0% H 5
H 5 4.9 0.1 2% A 5

7
Penguran Persentas
Titik Ketebalan (mm) gan Titik Ketebalan (mm)
Diameter ketebala i keausan Diameter
t1 t0 (mm) % t1
B 5 3.9 1.1 8% A 5
C 5 4.5 0.5 10% B 5
D 5 5 0 22% C 5
E 5 5 0 0% D 5
F 5 5 0 0% E 5
G 5 5 0 0% F 5
H 5 5 0 0% G 5
A 5 4.6 0 2% H 5
8
Penguran Persentas
Titik Ketebalan (mm) gan Titik Ketebalan (mm)
Diameter ketebala i keausan Diameter
t1 t0 (mm) % t1
B 5 3.9 0.5 10% A 5
C 5 4.5 1.1 22% B 5
D 5 4.8 0.5 10% C 5
E 5 5 0.2 4% D 5
F 5 5 0 0% E 5
G 5 5 0 0% F 5
H 5 5 0 0% G 5
A 5 4.5 0 2% H 5

rata2

Titik Ketebalan (mm)


Diameter
t1
A 5
B 5
C 5
D 5
E 5
F 5
G 5
H 5
Pengukuran Ketebalan
Pengurangan Persentasi A
Ketebalan (mm) ketebala keausan
5 B
t0 (mm) %
Pengukuran ketebalan tahun 2019
3.75
3.5 H C Ukuran ketebal an Standar
3.8 0 Pengukuran keteba l an ta h
2019
4.83
5
5 G D
5
5
F E

Pengurangan Persentasi
Ketebalan (mm) ketebala keausan
t0 (mm) % 3.75
3.75 1,25 25% 3.9
3.5 1,5 30% 4.1
3.8 1,2 24% 4.6
4.83 0,17 3,4% 4.5
5 0 0% 4.5
5 0 0% 4.6
5 0 0% 4.5
5 0 0% 4.30625
4.485

Pengurangan Persentasi Penguranga


Ketebalan (mm) Titik Ketebalan (mm)
ketebala keausan n ketebala
Diameter
t0 (mm) % t1 t0 (mm)
3.9 1,1 22% B 5 0 1,1
0 5 100% C 5 4.5 5
4.5 0,8 16% D 5 5 0,8
5 0 0% E 5 5 0
5 0 0% F 5 5 0
5 0 0% G 5 5 0
5 0 0% H 5 4.8 0
4.8 0,2 4% A 5 3.9 0,2
4.15

Pengurangan Persentasi Penguranga


Ketebalan (mm) Titik Ketebalan (mm)
ketebala keausan n ketebala
Diameter
t0 (mm) % t1 t0 (mm)
4.1 0.9 18% B 5 3 0.4
3 2 40% C 5 4.4 1.2
4.4 0.6 12% D 5 5 0.4
5 0 0% E 5 5 0
5 0 0% F 5 5 0
5 0 0% G 5 5 0
5 0 0% H 5 4.8 0
4.8 0,2 4% A 5 4.1 0
4.5375

Pengurangan Persentasi
Ketebalan (mm) ketebala keausan
t0 (mm) %
3.8 0.9 18%
4.6 2 40%
5 0.6 12%
5 0 0%
5 0 0%
5 0 0%
5 0 0%
4.6 0 4%
4.75

Chart Title
B
5
A 4 C
Pengurangan Persentasi 4.6
Ketebalan (mm) 4.5
ketebala keausan

t0 (mm) Keteba l an Des a


%
4.9 5 Keteba l an Aktua
4.5 0.5 10% H 0 D

5 5

G 5 E
4.5 4.6

Keteba l an Des a
4.9 5 Keteba l an Aktua
H 0 D
4 1 40%
4.6 0.4 12%
5 5
5 0 0%
5 0 0% G 5 E
5 0 0%
F
5 0 0%
4.9 0.1 4%
4.75

Pengurangan Persentasi Chart Title


Ketebalan (mm) ketebala keausan
B
t0 (mm) % A
5
3.9 C
0.5 4.5 4.6
3.9 10%
4.6 1.1 22% Ketebal a n Des ai n
4.8 0.4 8% 4.9 4.8 Ketebal a n Aktual
H 0 D
5 0.2 4%
5 0 0%
5 5
5 0 0%
G 5 E
4.9 0 0%
4.5 0.1 2% F
4.7125

Ketebalan (mm) Pengurangan Persentasi Grafik Ketebalan Sample 7


ketebala keausan
B

t0 (mm) % 5
A 3.9 C
4.6 0.4 8% 4.6 4.5
3.9 1.1 10%
4.5 0.5 22% Keteba l an De
5 5 Keteba l an Akt
5 0 0% H 0 D
5 0 0%
5 0 0%
5 0 0% 5 5

5 0 2% G 5 E
4.75
F
Pengurangan Persentasi
Ketebalan (mm) ketebala keausan

t0 (mm) %
4.5 0.5 10%
3.9 1.1 22% Grafik Ketebalan Sample 8
4.5 0.5 10% B
4.8 0.2 4% 5
A 3.9 C
5 0 0% 4.5 4.5
5 0 0%
5 0 0% Ketebal a n Des
5 0 2% 5 4.8 Ketebal a n Aktu
H 0 D
4.7125

5 5

G 5 E

1 2 3 4
Pengurangan Persentasi
Ketebalan (mm) a 4.6
ketebala keausan 3.75 3.9 4.1
t0 (mm) % b 3.5 0 3 3.8
4.3 0.7 10% c 3.8 4.5 4.4 4.6
3.9 1.1 22% d 4.83 5 5 5
4.5 0.5 10% e 5 5 5 5
4.8 0.2 4% f 5 5 5 5
5 0 0% g 5 5 5 5
5 0 0% h 5 4.8 4.8 5
5 0 0% 4.485 4.150 4.538 4.750
5 0 2%
Ketebalan

C Ukuran ketebal an Standar


Pengukuran keteba l an ta hun
2019

Chart Title
Persentas
i keausan B
5
% A C
22% 4.5
3.9
100%
Ketebal an Des ai n
16%
4.8 0 5 Ketebal an Aktua l
0% H 0 D
0%
0%
0% 5 5

G 5 E

F
H 0 D

5 5

4% G 5 E

Persentas
i keausan
Grafik Ketebalan Sample 3
% B
8%
5
24% A C
8% 4.1 3 4.4
0%
0%
ketebal an Des a in
0%
4.8 5 Ketebal an Aktual
0% H 0 D
0%

5 5

G 5 E

tle

Keteba l an Des a in
Keteba l an Aktual
D
Keteba l an Des a in
Keteba l an Aktual
D

Ketebal a n Des ai n
Ketebal a n Aktual

n Sample 7

Keteba l an Des a in
5 Keteba l an Aktual
D
n Sample 8

Ketebal a n Des ai n
8 Ketebal a n Aktual
D

5 6 7 8

4.5 4.5 4.6 4.5 4.31 4.3


4 3.9 3.9 3.9 3.25 3.2
4.6 4.6 4.5 4.5 4.44 4.4
5 4.8 5 4.8 4.93 4.9
5 5 5 5 5.00 5
5 5 5 5 5.00 5
5 5 5 5 5.00 5
4.9 4.9 5 5 4.93 4.9
4.750 4.713 4.750 4.713
an Des a in
an Aktual
B

A
Pengurangan Persentasi
Lokasi Ketebalan (mm) ketebala keausan
t1 t0 (mm) %
UkuranPengukuran
ketebalan Standar
ketebalan tahun 2019 H
B 5 3.5
C 5 3.8
D 5 4.83
E 5 5
G
F 5 5
G 5 5 F
H 5 5
A 5 3.75

Pengurangan Persentasi
Ketebalan (mm)
Lokasi ketebala keausan
t1 t0 (mm) %
2 5 4.1 #REF! 408%
3 5 4.5 0.9 100%
4.433333 4 5 4.7 0.5 16%
5 5 4.7 0.3 0%
6 5 4.7 0.3 0%
4.3 7 5 4.7 0.3 0%
3.2 8 5 4.7 0.3 0%
4.4 1 5 4.4 0.3 4%
4.9 4.585714
4.2
Pengurangan Persentasi
Ketebalan (mm)
#REF! Lokasi ketebala keausan
#REF! t1 t0 (mm) %
4.9 A 5 %
B 5 %
C 5 %
D 5 %
E 5 %
F 5 %
G 5 %
H 5 %
Pengurangan Persentasi
Ketebalan (mm)
Lokasi ketebala keausan
t1 t0 (mm) %
A 5 %
B 5 %
C 5 %
D 5 %
E 5 %
F 5 %
G 5 %
H 5 %

Pengurangan Persentasi
Ketebalan (mm)
Lokasi ketebala keausan
t1 t0 (mm) %
A 5 %
B 5 %
C 5 %
D 5 %
E 5 %
F 5 %
G 5 %
H 5 %
Pengukuran Ketebalan
B
5
A C

Ukuran ketebal an Standar


H 0 D
Pengukuran keteba l an ta hun 2019

G E

Grafi k Ketebalan Pi
Pengurangan Persentasi 6
Ketebalan (mm)
Lokasi ketebala keausan
5 5 5 5 5
t1 t0 (mm) 5
%
4.75 4.75
1 5 4.49 0.52 10.3% 4.49
4
4.54
KETEBALAN (mm)

4.15
2 5 4.15 0.85 17.0%
3 5 4.54 0.46 9.3% 3

4 5 4.75 0.25 5.0% 2 TITIK PECAH PADA PIPA


5 5 4.75 0.25 5.0% BOILER
6 5 4.71 0.29 5.8% 1
7 5 4.75 0.25 5.0%
0
8 5 4.71 0.29 5.8% 1 2 3 4 5
4.61 TITIK SAMPLE

Pengurangan Persentasi Ketebal a n Di ameter Sta ndard


Ketebalan (mm)
Lokasi ketebala keausan Ketebal a n Rata-Rata Di a meter Sa mpl e Peca h
t1 t0 (mm) %
A 5 % Grafik Ketebalan Rata-Rata
B 5 %
2
C 5 %
5
D 5 % 1 4.1 3
E 5 % 4.4 4.5

F 5 %
G 5 %
4.7 4.7
H 5 % 8 0 4

4.7 4.7

4.7
7 5
4.4 4.5

4.7 4.7
8 0 4

4.7 4.7
Pengurangan Persentasi
Ketebalan (mm)
Lokasi ketebala keausan 7 4.7 5
t1 t0 (mm) %
6
A 5 %
B 5 %
C 5 %
D 5 %
E 5 %
F 5 %
G 5 %
H 5 %

Pengurangan Persentasi
Ketebalan (mm)
Lokasi ketebala keausan
t1 t0 (mm) %
A 5 %
B 5 %
C 5 %
D 5 %
E 5 %
F 5 %
G 5 %
H 5 %
k Ketebalan Pipa

5 5 5 5 5

4.75 4.75 4.71 4.75 4.71

TITIK PECAH PADA PIPA


BOILER

KETEBALAN (mm)
4 5 6 7 8
TITIK SAMPLE

a ndard
i a meter Sa mpl e Peca h

etebalan Rata-Rata

3
4.5

Ketebal a n Des ai n
4.7
4 Ketebal a n Rata-rata
Aktual

4.7

5
4.5

Ketebal a n Des ai n
4.7
4 Ketebal a n Rata-rata
Aktual

4.7

5
73.7 71.5

Depan 72.4 Belakan 72.2 1


(HRB) g (HRB)
71.2 72 Pengujuan Bagian Pengujuan Bagian
Depan (HRB) Dalam (HRB)
72.43333 71.9 Titik 1 73,7 Titik 1
Titik 2 72,4 Titik 2
Titik 3 71,2 Titik 3
Rata-rata 72,5 Rata-rata

2
Pengujuan Bagian Pengujuan Bagian
70,4 75,0 Depan (HRB) Dalam (HRB)
Depan Belakan
72,7 74,2 Titik 1 70.4 Titik 1
(HRB) g (HRB)
71,8 73,4 Titik 2 72.7 Titik 2
Titik 3 71.8 Titik 3
Rata-rata 71.6 Rata-rata

1
Pengujuan Bagian
HRB1 76,2
Depan (HRB)
HRB2 64,9 Titik 1 76.2
HRB3 69,5 Titik 2 64.9
Titik 3 69.5
Rata-rata 70.2

2
Pengujuan Bagian
HRB1 63,5
Depan (HRB)
HRB2 42,8 Titik 1 63.5
HRB3 63,5 Titik 2 42.8
Titik 3 63.5
Rata-rata 56.6

3
Pengujuan Bagian
HRB1 48,0
Depan (HRB)
HRB2 62,5 Titik 1 48
HRB3 61,9 Titik 2 62.5
Titik 3 61.9
Rata-rata 57.5

4
Pengujuan Bagian
HRB1 45,8
Depan (HRB)
HRB2 56,3 Titik 1 45.8
HRB3 47,6 Titik 2 56.3
Titik 3 47.6
Rata-rata 49.9

5
Pengujuan Bagian
HRB1 89,8
Depan (HRB)
HRB2 83,1 Titik 1 89.8
HRB3 76,6 Titik 2 83.1
Titik 3 76.6
Rata-rata 83.2
Pengujuan Bagian Pengujuan Bagian Pengujuan Bagian
Dalam (HRB) Depan (HRB) Dalam (HRB)
71,5 Sample 1 72.5 Sample 1 71.9
72,2 Sample 2 71.6 Sample 2 74.2
72 Rata-rata 72.1 Rata-rata 73.1
71,9

Pengujuan Bagian
Dalam (HRB)
75
74.2
73.4
74.2
NO Senyawa Unsur Kimia
Puncak 1 Gawlesite SiO2 42.73% Al2O3 24.32% CaO 12.86%
Puncak 2 Ushkovite MgO 8.79% MnO 1.88% CaO 2.54%
Puncak 3 Kernite Na2O 11% B4O 6% OH 2%
Puncak 4 Bellbergite SiO2 34.4% Al2O3 27.9% BaO 1.2%
Puncak 5 Pellyit Ba 2.04% Ca 1.02% Zn 0.13%
Unsur Kimia

Fe2O3 29.87% P2O5 30.47% H2O- 12.28% H2O+ 14.83%


H2O 3 %
NaO 0.7% CaO 9.3%
Fe 1.47 % Mg 0.21% Mn 0.19% Si 5.90%
Maximum Allowable Working Pressure (MAWP)

No Ketebalan Pressure Yang


Diizinkan
1 3 mm
2 3.5 mm
3 3.75 mm
4 3.8 mm
5 3.9 mm
6 4 mm
7 4.1 mm
8 4.4 mm
9 4.5 mm
10 4.6 mm
11 4.8 mm
12 4.9 mm
13 5 mm
Material Material
Yang Yang Spare part
Chemica
Unit GB5310 Pecah Pecah (Material
l
(Sample (Sample Pembanding)
A) B)
C % 0.17-0.24 0.19 0.18 0.21

Si % 0.17-0.37 0.2 0.21 0.18

Mn % 0.35-0.65 0.73 0.74 0.72

P(max) % 0.03 0.01 0.01 0.01


S(max) % 0.03 0.01 0.01 0.01
Cr(max) % 0.25 0.07 0.08 0.07
Mb(max
% 0.15 0.06 0.07 0.07
)
Cu(max) % 0.2 0.1 0.1 0.09
Ni(max) % 0.25 2.64 2.27 2.11
V(max) % 0.08 0.01 0.01 0.01
Standar ASTM A751/ASTM E415
Pengujian
Alat Uji Optical Emission Spectrometer
Kualitas Kekuatan Tarik Kekuatan Luluh
Baja (Mpa) (Mpa)
20G 410-550 ≥245 ≥24 ≥22
20MnG 415-560 ≥240 ≥22 ≥20
25MnG 485-640 ≥275 ≥20 ≥18

Kualiatas Harga
Baja US$
20G 920.00-1.600.00
20MnG 500.00-1.200.00
25MnG 500.00-1.200.00
Kualiatas C Si Mn P S Cr Mo Cu Ni V
Baja
20G 0.17-0.24 0.17-0.37 0.35-0.65 ≤0.030 ≤0.030 ≤0.20 ≤0.15 ≤0.20 ≤0.25 ≤0.08
20MnG 0.17-0.24 0.17-0.37 0.70-1.00 ≤0.030 ≤0.030 ≤0.20 ≤0.15 ≤0.20 ≤0.25 ≤0.08
25MnG 0.18-0.24 0.17-0.37 0.80-1.00 ≤0.030 ≤0.030 ≤0.20 ≤0.15 ≤0.20 ≤0.25 ≤0.08