DS Ref. No. MALL-ARMA-MEC-MAT-01146 Rev. No. 01

Origin of Submittal: $/(& Date: 28 July, 2019

Submittal Type: 0DWHULDO6XEPLWWDO


Document Type: Product Data

Subject of Submittal: Material Submittal For DPCV

Issued For: ✔ Approval Information

Discipline: Architectural Civil Electrical ✔ Mechanical Structural MEP


Landscape HSE VT ELV Plumbing Others

Enclosure:
Main Contractor Signature: Consultant Received:
ALEC Gatekeeper (Mohammad Asahad ) Arcadis Approver (Saikat Banerjee)

Date: Jul 28, 2019 12:21:40 PM Date: Jul 28, 2019 12:21:40 PM

The Consultant Resident Engineer's Comments:


A -Approved
Further to the discussion with the contractor on 29/7/2019 & 01/08/2019 following information
B -Approved As Noted
shall be provided:
1) Provide the Kv values & the schematic drawing reference against each of the DPCV proposed
in the schedule. ✔ C -Not Approved, Resubmit
2) Refer to the comments in the attached with the response.
3) Trade Licence of Herz has expired. D -Information, Record

The Consultant RE Signature: Arcadis Approver (Saikat Banerjee) Date: 01 August, 2019

Employer's Representative's Comments / Approval


A -Approved

B -Approved As Noted

C -Not Approved, Resubmit

D -Information, Record

Employer's Representative's Signature: Date:

Corrections or comments made relative to submittals during this review do not relieve the contractor from compliance with the
contract requirement and specifications. This check is only for review of general conformance with the design concept of the
project and general compliance with the information given in the contract documents.