Revision Notes: Mountain of Fire and Miracles Ministries Southwest, 58 Araromi Regional Headqquarters

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

NOTE:

DO NOT SCALE. ALL CONTRACTORS MUST CHECK


ON SITE
2525 3425 2850 2356 1225 1225 1225 825 1225 1225 2023
1. ALL DIMENSIONS AND INFORMATION
700 PROVIDED. ANY QUERIES OR DISCREPANCIES
400
MUST BE REFERRED TO THE ENGINEERS BEFORE
MATERIALS ARE ORDERED OR WORK PUT IN
HAND.

2. THIS DRAWING IS COPYRIGHT AND MAY NOT


BE DUPLICATED OR USED IN ANY WAY WITHOUT
THE AUTHORITY OF THE ENGINEERS.
SNo. RECEIVER'S NAME/ SIGNATURE DATE RECVD.
2325

2325
REVISION NOTES
2700

2700
REV. DESCRIPTION ISSUE DATE
A A A
B B B
C C C
D D D
E E E
F F F
G G G
4888

4888
H H H
I I I
J J J
K K K

CLIENT

3025
MOUNTAIN OF FIRE AND MIRACLES
MINISTRIES SOUTHWEST, 58 ARAROMI
REGIONAL HEADQQUARTERS.
6850

PROJECT

3825
PROPOSED CHURCH BUILDING
AT
I.K OJO STREET, OFF AKURE HIGH SCHOOL
ARAROMI, AKURE, ONDO STATE.

450
150mm Mass Concrete on

600
150
25mm blinding on
damp proof polythene membrane on

50 150
200mm hardcore filling

3225
450
5850

2625
2823

2823
DWG. REV.

S01
DWG. TITLE
614

614

FOUNDATION LAYOUT
SCALE DATE DRAWN CHECKED / APPROVED

392 387 1:100 AUG E.O.B E.D


2019
2621 5225 4752 5225 2626
NOTE:
Soil bearing capacity assumed to be 150kN/m²

You might also like