DRAFTING OFFICE PERIOD ENDING DRAFTING SCHED PROGRESS PROJECT ENGR PLANT NUMBER

AMJ
DRAWING CONTROL START COMPL
DESIGN ENGINEER MA'DEN ALUMINUM COMPANY
NESMA 01-Jan-18 DRAWING IS CONSIDERED 65% COMPLETE WHEN
READY FOR CHECKING
AGM

COMPLETION TRANSMITTED TO
SHEET REV STARTING DATE PERCENT COMPLETE HOURS REVISION
DRAWING NUMBER DRAWING TITLES DATE FIELD REMARKS
NO. NO.
SCHED ACTUAL 10 20 30 40 50 60 70 80 90 100 SCHED ACTUAL SCHED ACTUAL NO. DATE LETTER DATE

MD-401-4260-EG-CV-LST-80000 1-1 A02 DRAWING CONTROL LIST


MD-401-4260-EG-CV-SOW-80001 1-15 A02 CONSTRUCTION SCOPE OF WORK
EXPLOSIVE MAGAZINE AREA
MD-401-4260-EG-CV-DWG-80020 1-1 A02 GENERAL NOTES - CIVIL & CONCRETE WORKS P-1
MD-401-4260-EG-CV-DWG-80021 1-1 A02 GENERAL NOTES - CIVIL & CONCRETE WORKS P-2
MD-401-4260-EG-CV-DWG-80022 1-1 A02 GENERAL NOTES - CIVIL & CONCRETE WORKS P-3
MD-401-4260-EG-CV-DWG-80023 1-1 A02 MIDS POLE FOUNDATION PLAN, SECTIONS & DETAILS
MD-401-4260-EG-CV-DWG-80024 1-1 A02 LIGHTING POLE FOUNDATION PLAN, SECTIONS & DETAILS
MD-401-4260-EG-CV-DWG-80025 1-1 A02 FEC FOUNDATION PLAN, SECTIONS & DETAILS
MD-401-4260-EG-CV-DET-80026 1-1 A02 CAMERA POLE FOUNDATION PLAN, SECTIONS & DETAILS
MD-401-4260-EG-CV-DWG-80027 1-1 A02 CARD READER FOUNDATION PLAN, SECTIONS & DETAILS
MD-401-4260-EG-CV-DWG-80028 1-1 A02 PLAN, SECTIONS & DETAILS - GENERATOR PAD
MD-401-4260-EG-CV-DWG-80030 1-1 A02 PLAN AND ELEVATIONS - ROAD MEDIAN/CONCRETE CRASH BARRIER
MD-401-4260-EG-CV-DIA-80031 1-1 A02 ELEVATIONS, SECTIONS & DETAILS - ROAD MEDIAN/CONCRETE CRASH BARRIER
MD-401-4260-EG-CV-DWG-80034 1-1 A02 OVERALL PLOT PLAN - CRASH BARRIER FOUNDATION LAYOUT
MD-401-4260-EG-CV-PLN-80035 1-1 A02 OVERALL PLOT PLAN - CRASH BARRIER FOUNDATION INDEX PLAN
MD-401-4260-EG-CV-PLN-80036 1-1 A02 CRASH RATED BARRIER FOUNDATION TYPICAL PLAN & SECTIONS
MD-401-4260-EG-CV-DET-80037 1-1 A02 CRASH RATED BARRIER FOUNDATION TYPICAL SECTIONS & DETAILS
MD-401-4260-EG-CV-PLN-80039 1-1 A02 CRASH BARRIER FOUNDATION ENLARGED PLAN - 1
MD-401-4260-EG-CV-PLN-80040 1-1 A02 CRASH BARRIER FOUNDATION ENLARGED PLAN - 2
MD-401-4260-EG-CV-PLN-80041 1-1 A02 CRASH BARRIER FOUNDATION ENLARGED PLAN - 3
MD-401-4260-EG-CV-PLN-80042 1-1 A02 CRASH BARRIER FOUNDATION ENLARGED PLAN - 4
MD-401-4260-EG-CV-PLN-80043 1-1 A02 CRASH BARRIER FOUNDATION ENLARGED PLAN - 5
MD-401-4260-EG-CV-PLN-80044 1-1 A02 CRASH BARRIER FOUNDATION ENLARGED PLAN - 6
MD-401-4260-EG-CV-PLN-80045 1-1 A02 CRASH BARRIER FOUNDATION ENLARGED PLAN - 7
MD-401-4260-EG-CV-PLN-80046 1-1 A02 CRASH BARRIER FOUNDATION ENLARGED PLAN - 8
MD-401-4260-EG-CV-PLN-80047 1-1 A02 CRASH BARRIER FOUNDATION ENLARGED PLAN - 9
MD-401-4260-EG-CV-PLN-80048 1-1 A02 CRASH BARRIER FOUNDATION ENLARGED PLAN - 10
MD-401-4260-EG-CV-PLN-80049 1-1 A02 CRASH BARRIER FOUNDATION ENLARGED PLAN - 11
MD-401-4260-EG-CV-PLN-80050 1-1 A02 CRASH BARRIER FOUNDATION ENLARGED PLAN - 12
MD-401-4260-EG-CV-PLN-80051 1-1 A02 CRASH BARRIER FOUNDATION ENLARGED PLAN - 13
MD-401-4260-EG-CV-DET-80052 1-2 00 TYPICAL STATIC BOLLAR DETAILS SHT. 1 OF 2
MD-401-4260-EG-CV-DET-80052 2-2 00 TYPICAL STATIC BOLLAR DETAILS SHT. 2 OF 2
MD-401-4260-EG-CV-DET-80053 1-1 00 ROAD BLOCKER FOUNDATION DETAIL 3.0M
MD-401-4260-EG-CV-PLN-80054 1-1 00 ARM BARRIER FOUNDATION PLAN
MD-401-4260-EG-CV-DWG-80055 1-1 00 TURNSTILE FOUNDATION DETAIL
MD-401-4260-EG-CV-DWG-80056 1-1 00 SLIDING GATE FOUNDATION
MD-401-4260-EG-CV-ELE-80054 1-1 00 SLIDING GATE ELEVATION
MD-401-4260-EG-CV-DIA-80057 1-1 00 ELEVATIONS, SECTIONS & DETAILS - MICROWAVE COMMUNICATION TOWER FOUNDATION

MINE ADMINISTRATION AREA


MD-401-4230-EG-CV-ELE-80084 1-1 A01 PLAN & ELEVATIONS - SUPPORT BUILDING (PRE-FAB)
MD-401-4230-EG-CV-PLN-80085 1-1 A01 PLAN, ELEVATIONS & SECTIONS - SUNSHADE (PIC)
MD-401-4230-EG-CV-DET-80086 1-1 A01 FOUNDATION PLAN, SECTIONS & DETAILS - PRELIMENARY INSPECTION CHECKPOINT (PIC)
MD-401-4230-EG-CV-PLN-80087 1-1 A01 SITE DEVELOPMENT & PAVING PLAN - PRELIMENARY INSPECTION CHECKPOINT (PIC)
MD-401-4230-EG-CV-DET-80088 1-1 A01 SECTION & DETAIL - PRELIMENARY INSPECTION CHECKPOINT (PIC)
MD-401-4230-EG-CV-DWG-00184 1-1 A01 LIGHTING POLE FOUNDATION PLAN SECTION ANS DETAIL
MD-401-4230-EG-CV-ELE-80109 1-1 00 LIGHTING POLE FOUNDATION PLAN, SECTIONS & DETAILS
MD-401-4230-EG-CV-ELE-80110 1-1 00 PLAN AND ELEVATIONS - ROAD MEDIAN/CONCRETE CRASH BARRIER
MD-401-4230-EG-CV-DIA-80111 1-1 00 ELEVATIONS, SECTIONS & DETAILS - ROAD MEDIAN/CONCRETE CRASH BARRIER
MD-401-4230-EG-CV-ELE-80112 1-1 00 FOUNDATION PLAN, SECTIONS & DETAILS - DAY FUEL TANK
MD-401-4230-EG-CV-DIA-80113 1-1 00 FOUNDATION PLAN, SECTIONS & DETAILS - GENERATOR ( G225XW)
MD-401-4230-EG-CV-DIA-80114 1-1 00 ELEVATIONS, SECTIONS & DETAILS - MICROWAVE COMMUNICATION TOWER FOUNDATION
MD-401-4230-EG-CV-DIA-80115 1-1 00 ELEVATIONS, SECTIONS & DETAILS - CAMERA POLE FOUNDATION

PERSONNEL VILLAGE AREA


MD-401-5160-EG-CV-PLN-80090 1-1 A02 PLAN - EMERGENCY GATE
MD-401-5160-EG-CV-ELE-80091 1-1 A02 ELEVATION - EMERGENCY GATE
MD-401-5160-EG-CV-PLN-80094 1-1 A02 FOUNDATION PLAN & SECTIONS - EMERGENCY GATE
MD-401-5160-EG-CV-ELE-80104 1-1 A01 PLAN & ELEVATIONS - SUPPORT BUILDING (PRE-FAB)
MD-401-5160-EG-CV-PLN-80105 1-1 A01 PLAN, ELEVATIONS & SECTIONS - SUNSHADE (PIC)
NOTES: 1) LIST DRAWINGS BY INDEX IN NUMBERICAL ORDER DWG TYPE PLANT NO. INDEX DRAWING NUMBER SHEET NO. REVISION

2) NORMALLY THE FIELD ETA OF DRAWINGS CAN BE OBTAINED BY CIVIL-STRUCTURAL


ADDING 2 TO 3 WEEK TO THE SCHEDULED COMPLETION DATE ABOVE
X XX A MD-401-4230-EG-CV-LST-80000 1 OF 2 A02
DRAFTING OFFICE PERIOD ENDING DRAFTING SCHED PROGRESS PROJECT ENGR PLANT NUMBER

AMJ
DRAWING CONTROL START COMPL
DESIGN ENGINEER MA'DEN ALUMINUM COMPANY
NESMA 01-Jan-18 DRAWING IS CONSIDERED 65% COMPLETE WHEN
READY FOR CHECKING
AGM

COMPLETION TRANSMITTED TO
SHEET REV STARTING DATE PERCENT COMPLETE HOURS REVISION
DRAWING NUMBER DRAWING TITLES DATE FIELD REMARKS
NO. NO.
SCHED ACTUAL 10 20 30 40 50 60 70 80 90 100 SCHED ACTUAL SCHED ACTUAL NO. DATE LETTER DATE

MD-401-5160-EG-CV-DIA-80106 1-1 A01 FOUNDATION PLAN, SECTIONS & DETAILS - PRELIMENARY INSPECTION CHECKPOINT (PIC)
MD-401-5160-EG-CV-PLN-80107 1-1 A01 SITE DEVELOPMENT & PAVING PLAN - PRELIMENARY INSPECTION CHECKPOINT (PIC)
MD-401-5160-EG-CV-DET-80108 1-1 A01 SECTION & DETAIL - PRELIMENARY INSPECTION CHECKPOINT (PIC)
MD-401-5160-EG-CV-DET-80109 1-1 00 LIGHTING POLE FOUNDATION PLAN, SECTION & DETAILS
MD-401-5160-EG-CV-ELE-80110 1-1 00 PLAN AND ELEVATIONS - ROAD MEDIAN/CONCRETE CRASH BARRIER
MD-401-5160-EG-CV-DIA-80111 1-1 00 ELEVATIONS, SECTIONS & DETAILS - ROAD MEDIAN/CONCRETE CRASH BARRIER
MD-401-5160-EG-CV-DIA-80112 1-1 00 FOUNDATION PLAN, SECTIONS & DETAILS - DAY FUEL TANK
MD-401-5160-EG-CV-DIA-80113 1-1 00 FOUNDATION PLAN, SECTIONS & DETAILS - GENERATOR ( G225XW)

NOTES: 1) LIST DRAWINGS BY INDEX IN NUMBERICAL ORDER DWG TYPE PLANT NO. INDEX DRAWING NUMBER SHEET NO. REVISION

2) NORMALLY THE FIELD ETA OF DRAWINGS CAN BE OBTAINED BY CIVIL-STRUCTURAL


ADDING 2 TO 3 WEEK TO THE SCHEDULED COMPLETION DATE ABOVE
X XX A MD-401-4230-EG-CV-LST-80000 2 OF 2 A02