Act Case Study
Act Case Study
JAMNAGAR
Gujarat technological university
Civil engineering
2014
BUILDING CRACKS
GROUP:8
JOSHI M.R-116250306502
PARMAR A.D-116250306510
SOJITRA M.B -116250306521
ADITRAVADA A.A-116250306526
VYAS A.H-106250306038
GOHIL S.J.-106250306547
SITE INTRODUCTION
FIELD INVESTIGATION
The first signs of deterioration in concrete buildings are usually fine
Cracks and rust stains which may be accompanied by spelling of concrete.
Visual Inspection is the first step to be taken in order to prepare a
Complete investigation to determine the cause, nature and extent of
Deterioration.
Types of cracks
• Structural cracks.
• Non Structural Cracks.
Structural Cracks
Structural cracks are those which result from incorrect design, faulty construction or
overloading and these may endanger the safety of a building and their inmates.
Non Structural Cracks.
Non Structural cracks occur mostly due to internally induced stresses in building materials.
These cracks normally do not endanger the safety but may look unsightly, create an
impression of faulty work or give a feeling of instability.
Cracks reappear over repaired surface as rust scales were not removed
Causes of occurrence of cracks:
The important causes responsible for occurrence in building, are as under:
Preparation of surface
The follows procedure are used for preparation of surface by concert repair
Cracks loosed concrete mortar and sand are removed from surface
i. To prepared shape edge and under cots
ii. To prepare the cavity for required ship
iii. Removed dust and mud crack b wire bracing
iv. To clean the surface by chemical when oil and grebes are available in
surface
i. Dry packing
ii. Concrete replacement
iii. Mortar replacement
iv. Grouting
v. Uniting or shortcreting
When repaired portion are more deep so, mortar are coated in 10mm thick layer
(2)Concrete replacement
This method are used for maintenance in big and deep portion and
mostly used for wall pear parapet curb canal, lining etc.
In R.C.C work a loose concrete are removed and protective coating are
steel bar and fill the ordinary greed concrete in portion.
A portion are more deep in dry packing and less deep in concrete
replacement so, it’s portion are fill in mortar replacement method.
A mortar fill up by pressure gun so, cement sand content are 1:4 and
4 mortar fill up hand so content are some for structure concrete content.
(4) Grouting
A cracks are more depend thick so, cracks are fill up cement grout a
cement grout are (cement sand) or (cement+sand+water) a w\c ratio of cement
grout are minimum so, given for more strength. This method is mainly used for
concrete gravity dam and concrete wall.