Timeline

Main Activity Parallel Activity Days


Mobilization 4
Site Clearing & Excavation 3
Foindation preparation 1
Lean Concrete Pouring 1
Rebar and Formwork 6
Concrete Pouring 1
Concrete Drying 3
Rebar and Formwork 6
Concrete Pouring 1
Concrete Drying 3
Pipe Spool and Support Fabrication
Equipment Lifting and Installation
- Coolin Tower Train 1 40 1
- Coolin Tower Train 2 1
- Coolin Tower Train 3 1
- GRP Tank 1
- Supply Pump 1
Equipment Levelling
- Coolin Tower Train 1 2
- Coolin Tower Train 2 2
- Coolin Tower Train 3 2
- GRP Tank
Pump Preallignment
Piping Erection 14
Cable Tray & Panel Erection
Pipe Support Installation Cable Pulling 10
Hydrotest Cable Termination 3
Touchup Paint Motor Solo Run 2
Pipe Blowing 2
Hot Shaft Allignment
Tie in 2
Bolt Tightening Backfilling & Levelling 1
Commissioning 7
Start Up 7
Demobilize 4
Duration = 92

Manpower
Trade Total Remark
Supervisor 1pax
Technician c/w Tools & PPE 1pax
Rigger Foremen c/w Tools & PPE 1pax
Fitter Foremen c/w Tools & PPE 1pax
Rigger c/w Tools & PPE 4pax
Fitter c/w Tools & PPE 6pax
Welder c/w Tools & PPE 3pax
Carpenter c/w Tools & PPE 6pax
Civil Worker only for 2 weeks
Bar Bender c/w Tools & PPE 6pax
Semiskill c/w Tools & PPE 6pax
Helper 4pax
TOTAL 39pax

Machinery & Equipment


Description Total Duration
4WD Pickup 1 3 Months
Mobile Crane 200ton 1 3 Days
Mobile Crane 25ton 1 3 Months
JCB 1 3 Days
Compactor 1 1 Day
Tipper Lorry 1 1 Day
Genset 100Kva 1 2 Months
DB 1 2 Months
JB 3 2 Months
Miller 2 2 Months
GTAW Welding Machine 6 1 Month
Diesel Dewatering Pump/Vibrator 2 7 Days
20ft Site Cabin Office c/w Aircond 1 3 Months
Canopy Rest Shelter 2 3 Months
Portable Toilet 2 3 Months
IBC Tank 4 3 Months

Service
Description Duration
Portable Toilet Desludge Daily
Freshwater Topup Daily
PMT Accomodation 4person 3 months
Roro bin every week 3 months
NDT
Scaffolding
Remark

JCB
JCB & Compactor
6m3 Low Grade Concrete

52m3 M30

200ton Mobile Crane

JCB

Days

r
Remark Daily Charge RM

Civil Worker only for 2 weeks


nt
Duration RM
3 Months
3 Days
3 Months
3 Days
1 Day
1 Day
2 Months
2 Months
2 Months
2 Months
1 Month
7 Days
3 Months
3 Months
3 Months
3 Months
Construction Bulk MTO
Description Total RM
6m x DN150 Sch.40 Seamless Pipe, A106
6m x DN300 Sch.20 Seamless Pipe, A106 5
6m x DN125 Sch.40 Seamless Pipe, A106 4
6m x DN100 Sch.20 Seamless Pipe, A106 1
DN150 x 150# Sch 40 WN Flange RFFE ASME B16.5, A105 4
DN300 x 150# Sch 20 WN Flange RFFE ASME B16.5, A105 4
DN125 x 150# Sch 40 WN Flange RFFE ASME B16.5, A105 6
DN100 x 150# Sch 40 WN Flange RFFE ASME B16.5, A105 2
DN300 x 150# Blind Flange RFFE ASME B16.5, A105 4
DN125 Sch.40 LR 90 Deg. Elbow ASME B 16.9, A234 6
DN125 Sch.40 LR 90 Deg. Elbow ASME B 16.9, A234
DN150 Sch.40 x DN100 Sch.40 Ecc Reducer ASME B 16.9, A234 2
12mm x 4m x 6m A36 Plate 1
6m HEA 100 Beam, A36 10
Angle
Angle
Cable Tray
Cable Gland
Cable
Gasket
Bolt
Anchor Bolt

Equipment
Description Total RM
Cooling Tower 3 RM91,000.00
GRP Sectional Water Tank 1
Supply Pump 1
On/Off Panel 4
DN 150 Strainer 1
DN 150 Valve 2
PSV 1
Consumable
Description Total RM
SMAW Welding Electrode
GTAW Welding Rod
Argon Gas
Oxygen Gas
Acetylene Gas
Diesel
Plywood
Freshwater
4" Cutting Disc
4" Grinding Disc