Professional Documents
Culture Documents
Handrail For Staircase-3: Notes
Handrail For Staircase-3: Notes
Handrail For Staircase-3: Notes
NOTES
1. ALL DIMENSION ARE IN MILLIMETERS AND ALL LEVELS ARE IN METERS
AND CO-ORDINATES ARE IN METERS UNLESS NOTED OTHERWISE.
1
L OF COLUMN
6230
KEY PLAN
1 2963 1135 830
C
HR031 HR033
HR031
976
969
HR
02 HR018
6 AMENDMENTS
1633
REV. DATE DESCRIPTION
30
EL.+6.450
30
(MEZZANINE LVL) EL.+6.450 A 07.03.2018 ISSUED FOR APPROVAL
(MEZZANINE LVL)
661
661
HR030
HR030
1633
1634
3137 1965 ISSUE
976
SUBCONTRACTORS
CONTRACTOR
TECHNOPARK
DCD
973
973
Q.S.
ST. ENG.
TRAKHEES
CLIENT
MUNICIPALITY
TENDER ISSUE
DIC
MEP
DATE
30
EL.+4.816
30
(2ND LANDING LVL) EL.+4.816
(2ND LANDING LVL)
HR019
657
38 144 3496 2552
657
657
1118 2522 2552
HR031
1633
4899
HR031
4900
1633
HR
976
02
1391
7
1391
HR028
PROJECT & CLIENT
30
EL.+3.183
30
(1ST LANDING LVL) EL.+3.183 PROPOSED IDS WORKSHOP
(1ST LANDING LVL)
OILFIELDS SUPPLY CENTER LTD.
PLOT No. TP030501C, TCHNO PARK, DUBAI
1634
1633
CLIENT REPRESENTATIVE
1218
B & A ENGINEERING
1218
CONSULTANTS
P.O.Box: 53363, Office 2201, Gold & Diamond Park-2
Dubai, United Arab Emirates, Tel: +9714 3791883,
Fax: +9714 3791884, Web: www.badriassociates.com
EL.+1.550
(F.F.L) EL.+1.550
(F.F.L) CONSULTANT
A-A B-B
SCALE : 1:25 SCALE : 1:25
E055 E055
CONTRACTOR
CONTECH
ENGINEERING
PB.NO. 5750, DUBAI, UAE.
TEL. 04-8802662 FAX. 04-8802622
DRAWING TITLE
STAIR-3 HR SECTIONS - 1
E056 A
J-1654 SCALE DATE