Ok EPIC MUSHTARI ENGINEERING SDN BHD
isioabinoat : HYDROTEST ACCEPTANCE CERTIFICATE
| PROJECT NOMRU PROJECT VTPACRAGENO: A-16
CLIENT: CARIGALI HESS OPERATING CO.SONBHD | TEST DATE: a/0tza010
LOCATION : WORKSHOP TELUK KALONG TEST PRESSURE: 160PS10
LINE SPEOS: AIR MANIFOLD TEST MEDIUM: WATER
DESIGN PRESSURE: 107 PSIG TEST TEMPERATURE : 31°C
OPERATING PRESSURE: NIA DURATION TEST 4 HOUR
TESTING EQUIPMENT USED TO MONITOR TEST oH
PRR __ pot P62
MANUFACTURER : BARTON ROTOTHERM WIKA ASHCROFT... |
TAG NO: : earn | TRy-002 EPS 17 meeps 27 |
SERIAL NO: 242E 4014 sisee7/t42 “NA, WA I
| RANGE, [atovopsi_| 0°10" ‘0-1000 PSI (0-100 PSI
| CALIBRATION CERT. NO (ACES.6546.01 | KPW.CALOo | _s74iop 378100)
|
i LINE SPOOL INCLUDED IN THE TEST
| (ie Toaawins no. REY. | SPOOL NO.
| [4 [musirarvossioe ~_ [0 [ain maniroto = ennese ~ aur = 16
i REMARKS
NO LEAK WAS OBSERVE DURING THE TEST CLEAN AND SATISFACTORY _
THE TESTING WAS WITNESSED AND ACCEPTED BY
PERFORMED BY wittesseD By ACCEPTED BY
PRODUGTION EMESE Q¢ INSPECTOR CLIENT REPR.
Name NORAZMAN NAME = SUFFIAN A
DATE =: 431032010 bate Faotzo10‘Appendix!
Fogo" of
fey oh EPIC MUSHTARI ENGINEERING SDN BHD
MUSHTARI PIPING
PROJECT TITLE : MERCURY REMOVAL UNIT ( MRU)
| CLIENT : CARIGALI HESS OPERATING COMPANY SDN BHD
PROJECT NO : MRU PROJECT HT PACKAGE NO. : AMT-16
REQUEST FOR FLUSHING AND HYDROTEST
REQUEST NO. NIA
| REQUEST DATE Pee HEH 43/01/2010
TIME = 42:40 PM
LOCATION rae WORKSHOP TELUK KALONG
DESCRIPTION : z
PLEASE MAKE AVAILABLE EMESB QC PERSONNEL FOR THE
FOLLOWING :
1 LINE CHECK (DEFICIENCY CHECKLIST FORMAT)
2. [4 Flusuinc activity
3. 1 yorostatic test
NOTE: NDT ACCEPTANCE AND CLEARANCE IS AS PER ATTACHED
FORMAT DULY SIGNED BY EME PIPING INSPECTOR.
PREPARED AND REQUESTED BY WITNESSED BY:
EMESB Qc: CLIENT REPR
NAME : SUFFIAN ALI
DATE : 13/01/2010
Ane. Kanan