K.P.

K STEEL HATTAR

Overhead Crane Inspectio

Daily Visual Inspection

DATE 1 2 3 4 5 6 7 8 9 10 11 12
Operating controls
Limit switches and stops
Warning devices
Hoist rope and chain
Trolley rails and wheels
Bridge rails and wheels
Hoist block and hooks
Brakes
Access to bridge and cab
DAILY HOUSEKEEPING
STEEL HATTAR

Crane Inspection

sual Inspection
Month MAY YEAR 2016
13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Engineer Danish Raza


K.P.K STEEL HATTAR
DAILY LOG
EME Dept.

DATE Fault Discription


1/10/2016 Crane Fault hoist (up/down) break motor (copla) is over heated
break preassure is removed to ensure the continuity of the production
process (with megnt break problem)
Regular mentaince of all creane
2/10/2016 blocks are prepared for furnace rings
3/10/2016 Shade A crane 2 (Tapa CRANE) hook got stuck in the trolly channal
chanal is repaired damaged rope is repaired
4/10/2016 megnet crane alignment problem
loose/ broken bolte are repaired by welding
5/10/2016 HOIST drum and motor coupling failure
coupling pins of motor and drum are repaired
trolly weel aligment is improved by welding loose nuts and bolts
6/10/2016 Regular mentaince of all creane
7/10/2016 megnet crane remote cable is repaired
8/10/2016 panel pipe leakage heat off and repaired in 15 min
9/10/2016 sheduled wapda shutdown
Regular mentaince of all creane
10/10/2016 Regular mentaince of all creane
11/10/2016 coupling pins of motor and drum are repaired
12/10/2016 hosit rope is replaced by new rope
13/10/2016 Regular mentaince of all creane
14/10/2016 Shade A crane 2 (Tapa CRANE) trolly weel aligment is improved
by welding loose nuts and bolts
15/10/2016 Regular mentaince of all creane
16/10/2016 sheduled wapda shutdown
Regular mentaince of all creane
17/10/2016 Regular mentaince of all creane
18/10/2016 Shade A crane 2 (Tapa CRANE) trolly weel aligment is improved
19/10/2016 Shade A crane 2 (Tapa CRANE) runway wheel alligment is improved
by installing new bearings
20/10/2016 fernace fan is repaired
Regular mentaince of all creane
K.P.K STEEL HATTAR
CRANE LOG
Shade A crane 2 (Tapa CRANE)
May-16
DATE Fault Discription
11/5/2016 HOIST drum and motor coupling failure
coupling pins of motor and drum are repaired
trolly weel aligment is improved by welding loose nuts and bolts

JUNE
K.P.K STEEL HATTAR
CRANE LOG
Shade C crane 3 (Tapa CRANE)
May-16
DATE Fault Discription
13/5/2016 HOIST motor fault and replaced
15/5/2016 a standby motor is installed on the trolly
25/5/2016 motor fault hoist configration is shifted to standby 20HP motor and faulty
motor is removed for repairing
25/5/2016 A 40 HP repaired motor is installed with no load current of(R_15A/ Y_16A
B_15A) in the peak time shutdown
30/5/2016 HOIST Motor break problem(loose break fault) ,fault is removed
31/5/2016 HOIST Motor break problem(loose break fault) ,break is checked and
fault is recovered
crane remote broken goes out of orde , a new remote is insltalled

JUNE
K.P.K STEEL HATTAR
CRANE LOG
Shade C crane 1 (LADLE CRANE )
May-16
DATE Fault Discription
13/5/2016HOIST BRAKE MOTOR(COPLA) CONNECTION FAILURE
fault removed by re-connection
16/5/2016runway breaker tripping fault ,fault removed by re-connection

JUNE
K.P.K STEEL HATTAR
CRANE LOG
Shade C crane 2 (LADLE CRANE )
May-16
DATE Fault Discription
16/5/2016resistors ar broken due to trolly end stops
new end stops are febricated and installes also new resistors are
installed
26/5/2016Trolly motor belts(2) are changed
27/5/2016HOIST MOTOR fault motor shaft goes out of order (broken) motor is
removed for repairing
29/5/2016repaired motor is installed to the HOIST

JUNE
K.P.K STEEL HATTAR

FURNACE log
May-16
Fault Discription
1/5/2016 panel pipe leakage heat off and repaired in 15 min
8/5/2016 FEC Tripped due to spark in coil ,carbon removed from sparking spot
and heat is on withen 10min
9/5/2016 FEC is tripped due to fuse blown in FEC converter panal,fuse is changed
withen 35 min
17/5/2016Desizing of the coil due to improper coil support,desizing leads to coil
expension and the EMF effect for rapidly reversing megnetic field
water circulation in ringer pipe is also blocked
new coil is installed along with the necessery installation pakage
18/5/2016coil yoke is over heated due to bypassed water circulation system in the
repaired yoke, more insulation pakage is used between coil and yoke
19/5/2016transformer tripped due to earth fault