inrerlors Non-Conformity Report (NCR)
Project wre
Ref, : AIC-BUR-QA-CIV-0001
Employer: THE CONSULTANTS.
Date: 05-05-2019
Engineer ARCO INTERIORS CONSULTANTS
Contractor: ARCO INTERIORS
‘Source of report
Ofiginator: Adnan Siddique Signature: Gere 7
NCR ISSUED TO: ALBAB ALBRONZI TECHNICAL SERVICES LLC
BAS ALBRO! GYPSUM PARTITION Wi
It has been observed that M/s Albab Aloronzi completed the mock up for gypsum partition poorly.
The following observations were made after completion of second coat stucco by the painter:
1. Sanding prior to primer not completed properly by M/s Albab Albronz
2. There are undulation at joints of gypsum board.
3. Stability of the completed wall stil not satisfactory
Refer to the attached photos for your reference, information & action. M/s Albab Albronzi should take
| immediate and necessary action to avoid such problem,
Reference documentation Classification of action
inva 1
1. Photos: 03 Nos. Y iat (Baca cero
Fy. Retenio upstorsubconractor
ai Scrap _
Corrective action
Date Name: ‘Signatur: a
Relevant Manager
Gane ‘ARGO’s approval,
TlApproved C1 Not Approved
| Project QA/QC Engineer ‘Construction Manager
Nome Nats)
Date sign Date Signatur:
Verification
[Action implemented and effective}
Project (AGC Manager Date Name Signature:
AICOFMOTZ v0UNDULATIONS AT Jorntsgars CAUSED PVE To (mpROPEK SANDING
Ar JOINTS -UNDULF >< GA oF more
THAN Lh Smm-