SASSCO Intermediate Check Instruction Sheet

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

SASSCO Intermediate Check Instruction Sheet

SAUDI ARABIAN SENSING SOLUTIONS CO., LTD.

Title: Intermediate Check Instruction Sheet Prepared by:


Equipment: 8058A Precision Multimeter Omer Nadeem
Approved
Asset no: SS-001 by:
Abdulwahab Almajed

Date of Intermediate Check -

Instruction Checklist for Intermediate Check / Maintenance Check

Figure 01 : Front Panel Schematic (a)

Figure 02 : Rear Panel Schematic (a)

Instruction Sheet for Intermediate Check / Maintenance Checklist


Instruction Detail(b) Check Box(c) Remarks
Ports Connection Grip Check
(Front Panel).

Rear Panel Check- Power Cable


Connection, Fuse Check, Port

Page 1 of 2
SASSCO Intermediate Check Instruction Sheet
SAUDI ARABIAN SENSING SOLUTIONS CO., LTD.

Grip Check & Remote Cable


Connections Check

Earth Grounding Connection Grip


Check
Stabilization time of 30 Minutes
for the Equipment

Check zero value of the


equipment when fully stabilized

Functions check by selecting all


the menus

Buttons Functionality Test

Calibration Switch Disabled


Check / Rear Panel Switch
Intermediate Readings Check(d)
(a) Mark the figure for any defect on the physical component during visual inspection
(b) Instruction details to be followed as it is, for any further calcification refer to manual in the Server
(c) Mark Check Box with Alphabets A: Accepted , AC: Accepted with Comments, R: Rejected, RE: Repaired
(d) Reading Data Sheet attached for filling.

Page 2 of 2

You might also like