EPIC FOR UPGRADATION OF AC UPS UNITS IN NGL3,

MESAIEED

TITLE: CABLE TERMINATION CHECKLIST

DOC NO. EI-E/013 CONTRACT NO. GC12105200


PROJECT NO. SYSTEM/SUB-SYSTEM NO.
TYPE MANUFACTURER
LENGTH DRAWING NO.
LOCATION RATING
TAG NO. CABLE SCHEDULE NO.
ITEM CHECKLIST DESCRIPTION RESULT REMARKS

1 Check cable against cable schedule, size/type correct and accepted.


Check cable gland/termination accessories are as per specifications and
2
accepted
3 Check cable for any physical damage
4 Check that cables are routed correctly as per approved drawing
5 Check any support is required for cable
6 Check cable bending radius are within manufacturers specified limits
Check that cables are correctly loomed and segregated as per project
7
specification
8 Check cable identification tag provided for control cables
Check cable and core markings are as per cable schedule and
9
project specification
10 Cable color coding checked and accepted
11 Check cross reference ferruling provided for control cables
12 Cable termination accepted
13 Cable lugs/connector used are correct and crimping accepted
14 Check cable glands and earthing are in accordance with specification
Cable connection done properly and bolt tightness checked by using
15
calibrated torque wrench, torque value is as per specification/standards

Remarks:-

Dopet Construction Dopet QA/QC QP


Name
Position
Signature
Date

DOC NO : 3513-M3GE-2-25-0019 REV. A PAGE 28 OF 29