Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 61

DAFTAR ANALISA BIAYA SATUAN PEKERJAAN

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL
UPAH
1 2 3 4 5 6 7 8=4x7 9

I PEKERJAAN INSTALASI LISTRIK

Pasang Sambungan Baru

900 VA 2,500,000.00

1300 VA 3,000,000.00

Di Hit. 1 1.0000 m' Memasang Instalasi


3.5000 m' Pralon PVC 1/4" AW 2,500.00 8,750.00
0.1000 set perlengkapan + asesories 2,500.00 250.00
7.0000 m' Kabel NYA 2,5 mm 3,000.00 21,000.00
0.1000 set perlengkapan + asesories 3,000.00 300.00
30,300.00
1.0000 OH pekerja 28,500.00 28,500.00
1.0000 OH tukang listrik 54,000.00 54,000.00
0.0500 OH kepala tukang 60,000.00 3,000.00
0.0050 OH mandor - -
85,500.00
115,800.00
Di Hit. 2 1.0000 m' Memasang saklar tunggal
1.0000 m' Saklar tanam tunggal ex broco 14,950.00 14,950.00
0.1000 set perlengkapan + asesories 14,950.00 1,495.00
16,445.00
0.0100 OH pekerja 28,500.00 285.00
0.1000 OH tukang listrik 54,000.00 5,400.00
0.0100 OH kepala tukang 60,000.00 600.00
0.0050 OH mandor - -
6,285.00
22,730.00
Di Hit. 3 1.0000 m' Memasang saklar ganda
1.0000 m' Saklar tanam ganda ex broco 16,250.00 16,250.00
0.1000 set perlengkapan + asesories 16,250.00 1,625.00
17,875.00
0.0100 OH pekerja 28,500.00 285.00
0.1000 OH tukang listrik 54,000.00 5,400.00
0.0100 OH kepala tukang 60,000.00 600.00
0.0050 OH mandor - -
6,285.00
24,160.00
Di Hit. 4 1.0000 m' Memasang stopkontak
1.0000 m' Stopkontak tanam ex broco 13,650.00 13,650.00
0.1000 set perlengkapan + asesories 13,650.00 1,365.00
15,015.00
0.0100 OH pekerja 28,500.00 285.00
0.1000 OH tukang listrik 54,000.00 5,400.00
0.0100 OH kepala tukang 60,000.00 600.00
0.0050 OH mandor - -
6,285.00
21,300.00
Di Hit. 5 1.0000 m' Memasang lampu SL 20 W Ex. Philips & Fitting lampu
1.0000 m' Lampu SL 20 W Ex Philips 28,750.00 28,750.00
1.0000 m' Fitting tempel 9,000.00 9,000.00
0.1000 set perlengkapan + asesories 9,000.00 900.00
38,650.00
0.0100 OH pekerja 28,500.00 285.00
0.1000 OH tukang listrik 54,000.00 5,400.00
0.0100 OH kepala tukang 60,000.00 600.00
0.0050 OH mandor - -
6,285.00
44,935.00

Di Hit. 6 1.0000 m' Memasang lampu SL 11 W Ex. Philips & Fitting lampu
1.0000 m' Lampu SL 20 W Ex Philips 25,875.00 25,875.00
1.0000 m' Fitting tempel 9,000.00 9,000.00
0.1000 set perlengkapan + asesories 9,000.00 900.00
35,775.00
0.0100 OH pekerja 28,500.00 285.00
NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL
UPAH
1 2 3 4 5 6 7 8=4x7 9
0.1000 OH tukang listrik 54,000.00 5,400.00
0.0100 OH kepala tukang 60,000.00 600.00
0.0050 OH mandor - -
6,285.00
42,060.00

Di Hit. 7 1.0000 m' Memasang Box sekring + MCB 1 fase 16 A


1.0000 m' Fuse Box 51,750.00 51,750.00
1.0000 m' MCB 19,550.00 19,550.00
0.1000 set perlengkapan + asesories 51,750.00 5,175.00
76,475.00
0.0100 OH pekerja 28,500.00 285.00
0.1000 OH tukang listrik 54,000.00 5,400.00
0.0100 OH kepala tukang 60,000.00 600.00
0.0050 OH mandor - -
6,285.00
82,760.00
RENCANA ANGGARAN BIAYA

PEKERJAAN : Membuat bak mandi ukuran 70 x 70 x 60

VOLUME ANALIS HARGA SATUAN


NO URAIAN PEKERJAAN SAT. JUMLAH (Rp)
RENCANA A (Rp)

a b c d e f g
I PEKERJAAN DINDING
1 Pas. batu merah Kalipucang tbl. 1/2 bata, 1 Pc : 3 Ps 1.750 m2 D.4 96,882.40 169,544.20
SUB TOTAL I : 169,544.20
II PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm di aci 3.500 m2 PL.1 43,757.20 153,150.20
SUB TOTAL II : 153,150.20
III PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Pasang keramik 20 x 20 2.883 m2 L.4 115,093.00 331,755.57
SUB TOTAL III : 331,755.57

JUMLAH HARGA TOTAL A + B 654,449.97


DIBULATKAN 654,000.00

Jepara, Maret 2012


Menyetujui ; Di Buat Oleh ;
PIMPINAN KEGIATAN CV. WASTU ARSY ARCHITECTS

S U H A L I, S.Pd, MH H. ARIYANTO, ST. MTA. IAI


NIP. 19650101 198903 1 033 Direktur
Mengetahui ;
KEPALA DINAS PENDIDIKAN KEPALA DINAS CIPTA KARYA
PEMUDA DAN OLAHRAGA TATA RUANG DAN KEBERSIHAN
KABUPATEN JEPARA KABUPATEN JEPARA

Drs. MOHAMMAD ZAHID, M. Pd Ir. S U Y A T N O


NIP. 19580502 198103 1 017 NIP. 19580514 198903 1 006
PROGRES REPORT PHISIK (MINGGUAN)

Kegiatan : PELAKSANAAN DANA ALOKASI KHUSUS (DAK) BIDANG PENDIDIKAN KAB. JEPARA
Nama Sekolah : REHABILITASI RUANG KELAS RUSAK SDN WANUSOBO
Lokasi : DESA WANUSOBO KECAMATAN KEDUNG KABUPATEN JEPARA
Tahun : 2013
Periode Ke : I (Satu)
Tanggal : 2 September s/d 5 September 2013

HASIL PELAKSANAAN PEKERJAAN


NILAI Pelaks. s/d Minggu lalu Pelaks. Jml. Prosentase Nilai
NO URAIAN PEKERJAAN VOLUME BOBOT
(%) Vol. Nilai BobotMinggu ini Pelaks. Pelaks. s/d Bobot
Volume Minggu ini (%)
a b c d e f g h i j
I PEKERJAAN PERSIAPAN
1 Mengupas plesteran lama 193.182 m2 0.888 193.18 193.18 100% 0.888
2 Membongkar usuk dan reng bangunan lama 393.750 m2 2.942 393.75 393.75 100% 2.942
3 Membongkar nok, gording, kuda-kuda bangunan lama 0.797 m3 0.843 0.80 0.80 100% 0.843
SUB TOTAL I :
II PEKERJAAN TANAH
1 Galian tanah pondasi 3.300 m3 0.199 3.30 3.30 100% 0.199
2 Urugan kembali 1.089 m3 0.022 1.09 1.09 100% 0.022
3 Urugan pasir hurug bawah pondasi 0.550 m3 0.126 0.55 0.55 100% 0.126
SUB TOTAL II :
III PEKERJAAN PONDASI
1 Pasang pondasi umpak batu kali 1 PC : 8 Ps 1.760 m3 1.875
dengan pasir beton 0.000 -
SUB TOTAL III : 0.000 1.875
IV PEKERJAAN DINDING dan PLESTERAN -
1 Pasangan Batu Merah Kali Pucang Tebal 1 bata, 30.900 m2 11.461
1Pc : 4 Ps pasir beton (peninggian dinding) 0.000 -
2 Pasangan Batu Merah Kali Pucang Tebal 1/2 bata, 19.200 m2 3.213
1Pc : 8 Ps pasir beton (gunungan/sophi2) -
SUB TOTAL IV :
V PEKERJAAN BETON -
1 Beton Kolom Teras (15 x 15) -
a. Beton mutu K.175 0.945 m3 1.641
b. Pembesian 131.080 kg 3.345
c. Bekisting 25.200 m2 3.157
2 Beton Kolom Susupan sudut dinding (15 x 15) -
a. Beton mutu K.175 0.810 m3 1.407
b. Pembesian 112.354 kg 2.868
c. Bekisting 5.400 m2 0.676
3 Kolom praktis beton bertulang pd gunungan 12.000 m1 1.548
4 Beton Balok Sunduk (8 x 20) -
a. Beton mutu K.175 0.494 m3 0.859
b. Pembesian 68.629 kg 1.752
c. Bekisting 12.070 m2 1.512
d. Perancah 2.472 m2 0.364
5 Beton Balok Konsol (15 x 20) -
a. Beton mutu K.175 0.504 m3 0.875
b. Pembesian 67.244 kg 1.716
c. Bekisting 9.240 m2 1.158
d. Perancah 2.520 m2 0.371
6 Ringbalk beton bertulang 109.800 m1 16.799
SUB TOTAL V : 40.047
VII PEKERJAAN ATAP dan PENUTUP -
1 Pasang kasau & reng baru kayu kruing 59.063 m2 13.114
2 Pasang Kasau kayu lama & Reng baru Kayu Kruing 174.826 m2 18.149
3 Pasang kembali / rehab kuda-kuda kayu lama 1.831 m3 3.494
4 Pas. Kembali nok, gording, murplat kayu lama 1.901 m3 3.627
Realisasi Kemajuan Pekerjaan minggu ini 5.020
Rencana kemajuan pekerjaan minggu ini 3.385
Mengalami percepatan / keterlambatan (-) 1.635

Jepara, 5 September 2013


Menyetujui ; Di buat oleh ;
Ketua Panitia Rehabilitasi Ruang Kelas Perencana
SD N Wanusobo

H.RADLOLI H. ARIYANTO, ST. MTA. IAI

Mengetahui / Menyetujui ;
Kepala Sekolah SDN Wanusobo

RUMANI, S.Pd
NIP. 19630663 198806 1 001
JADWAL PELAKSANAAN PEKERJAAN

KEGIATAN : PELAKSANAAN DANA ALOKASI KHUSUS (DAK) BIDANG PENDIDIKAN KAB. JEPARA
PEKERJAAN : REHABILITASI RUANG KELAS RUSAK SDN WANUSOBO
LOKASI : DESA WANUSOBO KECAMATAN KEDUNG KABUPATEN JEPARA
Tahun : 2013
Periode Ke : I (Satu) 2 September - 3 oktober

MINGGU
NO URAIAN PEKERJAAN Bobot %
1 2 3 4 5 6

I PEKERJAAN PERSIAPAN 4.673 4.673


II PEKERJAAN TANAH 0.347 0.347
III PEKERJAAN PONDASI 1.875 1.875
IV PEKERJAAN DINDING dan PLESTERAN 14.674 7.33677 7.34
V PEKERJAAN BETON 40.047 20.02 20.02
VII PEKERJAAN ATAP dan PENUTUP 38.384 38.38
Recana Progres mingguan 100 5.020 9.21208 27.36 20.02 38.38 -
Rencana Komulatif Progres Mingguan 5.02025 14.2323 41.5927 61.61629 100 100

Jepara, 3 September 2013


Menyetujui ; Di buat oleh ;
Ketua Panitia Rehabilitasi Ruang Kelas Perencana
SD N 1 Parang

……………… H. ARIYANTO, ST. MTA. IAI


NIP. ……………….
REKAPITULASI (RAB 40%)

KEGIATAN : PELAKSANAAN DANA ALOKASI KHUSUS (DAK) BIDANG PENDIDIKAN KAB. JEPARA
PEKERJAAN : REHABILITASI RUANG KELAS RUSAK SDN WANUSOBO
LOKASI : DESA WANUSOBO KECAMATAN KEDUNG KABUPATEN JEPARA
TAHUN : 2013
VOLUME : 3 RUANG KELAS (DAN PENGEMBANGAN 2 RUANG KEGIATAN/KANTOR)

NO URAIAN PEKERJAAN HARGA

I PEKERJAAN DINDING dan PLESTERAN 12,647,813.96


II PEKERJAAN KOSEN PINTU dan JENDELA 1,112,400.00
III PEKERJAAN ATAP dan PENUTUP 25,381,696.57

JUMLAH HARGA 39,141,910.53


DIBULATKAN 39,141,900.00

TERBILANG : Tiga Puluh Sembilan Juta Seratus Empat Puluh Satu Ribu Sembilan Ratus Rupiah

Jepara, 5 Oktober 2013

Menyetujui ; Di buat oleh ;


Ketua Panitia Rehabilitasi Ruang Kelas Perencana
SD N Wanusobo

……………… H. ARIYANTO, ST. MTA. IAI

Mengetahui / Menyetujui ;
Kepala Sekolah Selaku Penanggung Jawab
Rehabilitasi Ruang Kelas
Kepala Sekolah SDN Wanusobo

RUMANI, S.Pd
NIP. 19630663 198806 1 001
RENCANA ANGGARAN BIAYA (RAB 30 %)

KEGIATAN : PELAKSANAAN DANA ALOKASI KHUSUS (DAK) BIDANG PENDIDIKAN KAB. JEPARA
PEKERJAAN : REHABILITASI RUANG KELAS RUSAK SDN WANUSOBO
LOKASI : DESA WANUSOBO KECAMATAN KEDUNG KABUPATEN JEPARA
TAHUN : 2013
VOLUME : 3 RUANG KELAS (DAN PENGEMBANGAN 2 RUANG KEGIATAN/KANTOR)

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME ANALISA
(Rp) (Rp)
a b c d e f
I PEKERJAAN DINDING dan PLESTERAN
1 Plesteran 1 Pc : 8 Ps di aci PC pasir beton 254.982 m2 PL.4 26.75 41,070.72 10,472,284.47
2 Plesteran Beton 1 Pc : 2 Ps Tebal 15 mm pasir beton 26.710 m2 PL.6 2.53 37,074.00 990,229.49
3 Skonengan sudut 263.400 m1
taksir 3.03 4,500.00 1,185,300.00
SUB TOTAL I : 32.31 12,647,813.96
II PEKERJAAN KOSEN PINTU dan JENDELA -
1 Rehab Pintu Panyl Kayu lama 5.40 m 2
KY.21.a 2.84 206,000.00 1,112,400.00
SUB TOTAL II : 2.84 1,112,400.00
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME ANALISA
(Rp) (Rp)
a b c d e f
III PEKERJAAN ATAP dan PENUTUP -
1 Pasang Kasau kayu lama & Reng baru Kayu Kruing 159.862 m2 KY.7.a 22.13 54,178.50 8,661,073.12
2 Pasang atap genteng pres lokal (sulaman baru) 9.844 m2 PA.1 1.44 57,330.00 564,342.19
3 Pasang kembali atap genteng lama 383.906 m 2
PA.5.a 11.50 11,730.00 4,503,220.31
4 Pasang kerpus lokal (baru) 31.500 m1 PA.8 4.04 50,262.00 1,583,253.00
5 Pasang pyan eternit atrisco dg rangka kayu baru 90.15 m2 LL.2 25.73 111,700.00 10,069,807.95
(2 ruang dalam kelas) -
SUB TOTAL III : 64.85 25,381,696.57

JUMLAH HARGA TOTAL 39,141,910.53


DIBULATKAN 39,141,900.00

Jepara, 5 Oktober 2013


Menyetujui ; Di buat oleh ;
Ketua Panitia Rehabilitasi Ruang Kelas Perencana
SD N Wanusobo

……………… H. ARIYANTO, ST. MTA. IAI

Mengetahui / Menyetujui ;
Kepala Sekolah Selaku Penanggung Jawab
Rehabilitasi Ruang Kelas
SD N Wanusobo

………………….
NIP. …………………..
RENCANA ANGGARAN BIAYA (RAB 30 %)

KEGIATAN : PELAKSANAAN DANA ALOKASI KHUSUS (DAK) BIDANG PENDIDIKAN KAB. JEPARA
PEKERJAAN : REHABILITASI RUANG KELAS RUSAK SDN WANUSOBO
LOKASI : DESA WANUSOBO KECAMATAN KEDUNG KABUPATEN JEPARA
TAHUN : 2013
VOLUME : 3 RUANG KELAS (DAN PENGEMBANGAN 2 RUANG KEGIATAN/KANTOR)

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME ANALISA
(Rp) (Rp)
a b c d e f
I PEKERJAAN DINDING dan PLESTERAN 0.000
1 Plesteran 1 Pc : 8 Ps di aci PC pasir beton 254.982 m2 PL.4 41,070.72 10,472,284.47
2 Plesteran Beton 1 Pc : 2 Ps Tebal 15 mm pasir beton 26.710 m2 PL.6 37,074.00 990,229.49
3 Skonengan sudut 263.400 m 1
taksir 4,500.00 1,185,300.00
SUB TOTAL I : 12,647,813.96
II PEKERJAAN KOSEN PINTU dan JENDELA
1 Rehab Pintu Panyl Kayu lama 5.40 m2 KY.21.a 206,000.00 1,112,400.00
SUB TOTAL II : 1,112,400.00
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME ANALISA
(Rp) (Rp)
a b c d e f
III PEKERJAAN ATAP dan PENUTUP
1 Pasang Kasau kayu lama & Reng baru Kayu Kruing 159.862 m2 KY.7.a 54,178.50 8,661,073.12
2 Pasang atap genteng pres lokal (sulaman baru) 9.844 m2 PA.1 57,330.00 564,342.19
3 Pasang kembali atap genteng lama 383.906 m 2
PA.5.a 11,730.00 4,503,220.31
4 Pasang kerpus lokal (baru) 31.500 m1 PA.8 50,262.00 1,583,253.00
5 Pasang pyan eternit atrisco dg rangka kayu baru 90.15 m2 LL.2 111,700.00 10,069,807.95
(2 ruang dalam kelas)
SUB TOTAL III : 25,381,696.57

JUMLAH HARGA TOTAL 39,141,910.53


DIBULATKAN 39,141,900.00

Jepara, 5 Oktober 2013


Menyetujui ; Di buat oleh ;
Ketua Panitia Rehabilitasi Ruang Kelas Perencana
SD N Wanusobo

……………… H. ARIYANTO, ST. MTA. IAI

Mengetahui / Menyetujui ;
Kepala Sekolah Selaku Penanggung Jawab
Rehabilitasi Ruang Kelas
SD N Wanusobo

………………….
NIP. …………………..
REKAPITULASI (RAB 70%)

KEGIATAN : PELAKSANAAN DANA ALOKASI KHUSUS (DAK) BIDANG PENDIDIKAN KAB. JEPARA
PEKERJAAN : REHABILITASI RUANG KELAS RUSAK SDN WANUSOBO
LOKASI : DESA WANUSOBO KECAMATAN KEDUNG KABUPATEN JEPARA
TAHUN : 2013
VOLUME : 3 RUANG KELAS (DAN PENGEMBANGAN 2 RUANG KEGIATAN/KANTOR)

NO URAIAN PEKERJAAN HARGA

I PEKERJAAN PERSIAPAN 2,439,041.83


II PEKERJAAN TANAH 180,988.50
III PEKERJAAN PONDASI 978,707.84
IV PEKERJAAN DINDING dan PLESTERAN 20,305,832.06
V PEKERJAAN BETON 20,900,348.69
VI PEKERJAAN KOSEN PINTU dan JENDELA 1,112,400.00
VII PEKERJAAN ATAP dan PENUTUP 45,413,856.59

JUMLAH HARGA 91,331,175.50


DIBULATKAN 91,331,100.00

TERBILANG : Sembilan Puluh Satu Juta Tiga Ratus Tiga Puluh Satu Ribu Seratus Rupiah

Jepara, 3 September 2013

Menyetujui ; Di buat oleh ;


Ketua Panitia Rehabilitasi Ruang Kelas Perencana
SD N Wanusobo

……………… H. ARIYANTO, ST. MTA. IAI

Mengetahui / Menyetujui ;
Kepala Sekolah Selaku Penanggung Jawab
Rehabilitasi Ruang Kelas
Kepala Sekolah SDN Wanusobo

RUMANI, S.Pd
NIP. 19630663 198806 1 001
RENCANA ANGGARAN BIAYA (RAB 30 %)

KEGIATAN : PELAKSANAAN DANA ALOKASI KHUSUS (DAK) BIDANG PENDIDIKAN KAB. JEPARA
PEKERJAAN : REHABILITASI RUANG KELAS RUSAK SDN WANUSOBO
LOKASI : DESA WANUSOBO KECAMATAN KEDUNG KABUPATEN JEPARA
TAHUN : 2013
VOLUME : 3 RUANG KELAS (DAN PENGEMBANGAN 2 RUANG KEGIATAN/KANTOR)

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME ANALISA
(Rp) (Rp)
a b c d e f
I PEKERJAAN PERSIAPAN
1 Mengupas plesteran lama 0.000 m2 PS. 5 2,400.00 -
2 Membongkar usuk dan reng bangunan lama 0.000 m2 PS. 6 3,900.00 -
3 Membongkar nok, gording, kuda-kuda bangunan lama 0.000 m 3
PS. 7 552,000.00 -
SUB TOTAL I : 0.000 -
II PEKERJAAN TANAH 0.000
1 Galian tanah pondasi 0.000 m3 T.1 31,500.00 -
2 Urugan kembali 0.000 m3 T.13 10,500.00 -
3 Urugan pasir hurug bawah pondasi 0.000 m3 T.14 119,280.00 -
SUB TOTAL II : 0.000 -
III PEKERJAAN PONDASI 0.000
1 Pasang pondasi umpak batu kali 1 PC : 8 Ps 0.000 m3 Pd.4 556,084.00 -
dengan pasir beton 0.000
SUB TOTAL III : 0.000 -
IV PEKERJAAN DINDING dan PLESTERAN 0.000
1 Pasangan Batu Merah Kali Pucang Tebal 1 bata, 0.000 m2 D.2 193,569.00 -
1Pc : 4 Ps pasir beton (peninggian dinding) 0.000
2 Pasangan Batu Merah Kali Pucang Tebal 1/2 bata, 0.000 m2 D.6 87,330.00 -
1Pc : 8 Ps pasir beton (gunungan/sophi2) 0.000
3 Plesteran 1 Pc : 8 Ps di aci PC pasir beton 254.982 m2 PL.4 41,070.72 10,472,284.47
4 Plesteran Beton 1 Pc : 2 Ps Tebal 15 mm pasir beton 26.710 m2 PL.6 37,074.00 990,229.49
5 Skonengan sudut 263.400 m1 taksir 4,500.00 1,185,300.00
SUB TOTAL IV : 12,647,813.96
V PEKERJAAN BETON
1 Beton Kolom Teras (15 x 15)
a. Beton mutu K.175 0.000 m3 B.2 906,388.55 -
b. Pembesian 0.000 kg B.7 13,320.00 -
c. Bekisting 0.000 m2 B.12 65,380.00 -
2 Beton Kolom Susupan sudut dinding (15 x 15) 0.000
a. Beton mutu K.175 0.000 m3 B.2 906,388.55 -
b. Pembesian 0.000 kg B.7 13,320.00 -
c. Bekisting 0.000 m2 B.12 65,380.00 -
3 Kolom praktis beton bertulang pd gunungan 0.000 m1 B.8 67,312.71 -
4 Beton Balok Sunduk (8 x 20) 0.000
a. Beton mutu K.175 0.000 m3 B.2 906,388.55 -
b. Pembesian 0.000 kg B.7 13,320.00 -
c. Bekisting 0.000 m2 B.12 65,380.00 -
d. Perancah 0.000 m2 B.11 76,780.00 -
5 Beton Balok Konsol (15 x 20) 0.000
a. Beton mutu K.175 0.000 m3 B.2 906,388.55 -
b. Pembesian 0.000 kg B.7 13,320.00 -
c. Bekisting 0.000 m 2
B.12 65,380.00 -
d. Perancah 0.000 m2 B.11 76,780.00 -
6 Ringbalk beton bertulang 0.000 m1 B.9 79,849.35 -
SUB TOTAL V : -
VI PEKERJAAN KOSEN PINTU dan JENDELA
1 Rehab Pintu Panyl Kayu lama 5.40 m2 KY.21.a 206,000.00 1,112,400.00
SUB TOTAL VI : 1,112,400.00
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME ANALISA
(Rp) (Rp)
a b c d e f
VII PEKERJAAN ATAP dan PENUTUP
1 Pasang kasau & reng baru kayu kruing 0.000 m2 KY.7 115,882.50 -
2 Pasang Kasau kayu lama & Reng baru Kayu Kruing 159.862 m2 KY.7.a 54,178.50 8,661,073.12
3 Pasang kembali / rehab kuda-kuda kayu lama 0.000 m3 KY.12.a 995,760.00 -
4 Pas. Kembali nok, gording, murplat kayu lama 0.000 m3 KY.12.a 995,760.00 -
5 Pasang atap genteng pres lokal (sulaman baru) 9.844 m2 PA.1 57,330.00 564,342.19
6 Pasang kembali atap genteng lama 383.906 m2 PA.5.a 11,730.00 4,503,220.31
7 Pasang kerpus lokal (baru) 31.500 m1 PA.8 50,262.00 1,583,253.00
8 Pasang pyan eternit atrisco dg rangka kayu baru 90.15 m2 LL.2 111,700.00 10,069,807.95
(2 ruang dalam kelas)
SUB TOTAL VII : 25,381,696.57

JUMLAH HARGA TOTAL 39,141,910.53


DIBULATKAN 39,141,900.00

Jepara, 3 September 2013


Menyetujui ; Di buat oleh ;
Ketua Panitia Rehabilitasi Ruang Kelas Perencana
SD N Wanusobo

……………… H. ARIYANTO, ST. MTA. IAI

Mengetahui / Menyetujui ;
Kepala Sekolah Selaku Penanggung Jawab
Rehabilitasi Ruang Kelas
SD N Wanusobo

………………….
NIP. …………………..
RENCANA ANGGARAN BIAYA (RAB 30 %)

KEGIATAN : PELAKSANAAN DANA ALOKASI KHUSUS (DAK) BIDANG PENDIDIKAN KAB. JEPARA
PEKERJAAN : REHABILITASI RUANG KELAS RUSAK SDN WANUSOBO
LOKASI : DESA WANUSOBO KECAMATAN KEDUNG KABUPATEN JEPARA
TAHUN : 2013
VOLUME : 3 RUANG KELAS (DAN PENGEMBANGAN 2 RUANG KEGIATAN/KANTOR)

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME ANALISA
(Rp) (Rp)
a b c d e f
I PEKERJAAN PERSIAPAN
1 Mengupas plesteran lama 193.182 m2 PS. 5 2,400.00 463,636.22
2 Membongkar usuk dan reng bangunan lama 393.750 m2 PS. 6 3,900.00 1,535,625.00
3 Membongkar nok, gording, kuda-kuda bangunan lama 0.797 m3 PS. 7 552,000.00 439,780.61
SUB TOTAL I : 2,439,041.83
II PEKERJAAN TANAH
1 Galian tanah pondasi 3.300 m3 T.1 31,500.00 103,950.00
2 Urugan kembali 1.089 m3 T.13 10,500.00 11,434.50
3 Urugan pasir hurug bawah pondasi 0.550 m3 T.14 119,280.00 65,604.00
SUB TOTAL II : 180,988.50
III PEKERJAAN PONDASI
1 Pasang pondasi umpak batu kali 1 PC : 8 Ps 1.760 m3 Pd.4 556,084.00 978,707.84
dengan pasir beton
SUB TOTAL III : 978,707.84
IV PEKERJAAN DINDING dan PLESTERAN
1 Pasangan Batu Merah Kali Pucang Tebal 1 bata, 30.900 m2 D.2 193,569.00 5,981,282.10
1Pc : 4 Ps pasir beton (peninggian dinding)
2 Pasangan Batu Merah Kali Pucang Tebal 1/2 bata, 19.200 m2 D.6 87,330.00 1,676,736.00
1Pc : 8 Ps pasir beton (gunungan/sophi2)
3 Plesteran 1 Pc : 8 Ps di aci PC pasir beton 254.98 m2 PL.4 41,070.72 10,472,284.47
4 Plesteran Beton 1 Pc : 2 Ps Tebal 15 mm pasir beton 26.71 m2 PL.6 37,074.00 990,229.49
5 Skonengan sudut 263.40 m1 taksir 4,500.00 1,185,300.00
SUB TOTAL IV : 20,305,832.06
V PEKERJAAN BETON
1 Beton Kolom Teras (15 x 15)
a. Beton mutu K.175 0.945 m3 B.2 906,388.55 856,537.18
b. Pembesian 131.080 kg B.7 13,320.00 1,745,979.33
c. Bekisting 25.200 m2 B.12 65,380.00 1,647,576.00
2 Beton Kolom Susupan sudut dinding (15 x 15)
a. Beton mutu K.175 0.810 m3 B.2 906,388.55 734,174.73
b. Pembesian 112.354 kg B.7 13,320.00 1,496,553.71
c. Bekisting 5.400 m2 B.12 65,380.00 353,052.00
3 Kolom praktis beton bertulang pd gunungan 12.000 m1 B.8 67,312.71 807,752.52
4 Beton Balok Sunduk (8 x 20)
a. Beton mutu K.175 0.494 m3 B.2 906,388.55 448,118.50
b. Pembesian 68.629 kg B.7 13,320.00 914,136.95
c. Bekisting 12.070 m2 B.12 65,380.00 789,106.53
d. Perancah 2.472 m2 B.11 76,780.00 189,800.16
5 Beton Balok Konsol (15 x 20)
a. Beton mutu K.175 0.504 m3 B.2 906,388.55 456,819.83
b. Pembesian 67.244 kg B.7 13,320.00 895,685.82
c. Bekisting 9.240 m 2
B.12 65,380.00 604,111.20
d. Perancah 2.520 m2 B.11 76,780.00 193,485.60
6 Ringbalk beton bertulang 109.800 m1 B.9 79,849.35 8,767,458.63
SUB TOTAL V : 20,900,348.69
VI PEKERJAAN KOSEN PINTU dan JENDELA
1 Rehab Pintu Panyl Kayu lama 5.40 m2 KY.21.a 206,000.00 1,112,400.00
SUB TOTAL VI : 1,112,400.00
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME ANALISA
(Rp) (Rp)
a b c d e f
VII PEKERJAAN ATAP dan PENUTUP
1 Pasang kasau & reng baru kayu kruing 59.063 m2 KY.7 115,882.50 6,844,310.16
2 Pasang Kasau kayu lama & Reng baru Kayu Kruing 334.688 m2 KY.7.a 54,178.50 18,132,866.72
3 Pasang kembali / rehab kuda-kuda kayu lama 1.831 m3 KY.12.a 995,760.00 1,823,340.12
4 Pas. Kembali nok, gording, murplat kayu lama 1.901 m3 KY.12.a 995,760.00 1,892,740.61
5 Pasang atap genteng pres lokal (sulaman baru) 9.844 m2 PA.1 57,330.00 564,342.19
6 Pasang kembali atap genteng lama 383.906 m 2
PA.5.a 11,730.00 4,503,220.31
7 Pasang kerpus lokal (baru) 31.500 m1 PA.8 50,262.00 1,583,253.00
8 Pasang pyan eternit atrisco dg rangka kayu baru 90.15 m2 LL.2 111,700.00 10,069,783.48
(2 ruang dalam kelas)
SUB TOTAL VII : 45,413,856.59

JUMLAH HARGA TOTAL 91,331,175.50


DIBULATKAN 91,331,100.00

Jepara, 3 September 2013


Menyetujui ; Di buat oleh ;
Ketua Panitia Rehabilitasi Ruang Kelas Perencana
SD N Wanusobo

……………… H. ARIYANTO, ST. MTA. IAI

Mengetahui / Menyetujui ;
Kepala Sekolah Selaku Penanggung Jawab
Rehabilitasi Ruang Kelas
SD N Wanusobo

………………….
NIP. …………………..
REKAPITULASI (RAB 40%)

KEGIATAN : PELAKSANAAN DANA ALOKASI KHUSUS (DAK) BIDANG PENDIDIKAN KAB. JEPARA
PEKERJAAN : REHABILITASI RUANG KELAS RUSAK SDN WANUSOBO
LOKASI : DESA WANUSOBO KECAMATAN KEDUNG KABUPATEN JEPARA
TAHUN : 2013
VOLUME : 3 RUANG KELAS (DAN PENGEMBANGAN 2 RUANG KEGIATAN/KANTOR)

NO URAIAN PEKERJAAN HARGA

I PEKERJAAN PERSIAPAN 2,439,041.83


II PEKERJAAN TANAH 180,988.50
III PEKERJAAN PONDASI 978,707.84
IV PEKERJAAN DINDING dan PLESTERAN 7,658,018.10
V PEKERJAAN BETON 20,900,348.69
VII PEKERJAAN ATAP dan PENUTUP 20,032,184.48

JUMLAH HARGA 52,189,289.44


DIBULATKAN 52,189,200.00

TERBILANG : Lima Puluh Dua Juta Seratus Delapan Puluh Sembilan Ribu Dua Ratus Rupiah

Jepara, 3 September 2013

Menyetujui ; Di buat oleh ;


Ketua Panitia Rehabilitasi Ruang Kelas Perencana
SD N Wanusobo

……………… H. ARIYANTO, ST. MTA. IAI

Mengetahui / Menyetujui ;
Kepala Sekolah Selaku Penanggung Jawab
Rehabilitasi Ruang Kelas
Kepala Sekolah SDN Wanusobo

RUMANI, S.Pd
NIP. 19630663 198806 1 001
RENCANA ANGGARAN BIAYA (RAB 40 %)

KEGIATAN : PELAKSANAAN DANA ALOKASI KHUSUS (DAK) BIDANG PENDIDIKAN KAB. JEPARA
PEKERJAAN : REHABILITASI RUANG KELAS RUSAK SDN WANUSOBO
LOKASI : DESA WANUSOBO KECAMATAN KEDUNG KABUPATEN JEPARA
TAHUN : 2013
VOLUME : 3 RUANG KELAS (DAN PENGEMBANGAN 2 RUANG KEGIATAN/KANTOR)

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME ANALISA
(Rp) (Rp)
a b c d e f
I PEKERJAAN PERSIAPAN
1 Mengupas plesteran lama 193.182 m2 PS. 5 2,400.00 463,636.22
2 Membongkar usuk dan reng bangunan lama 393.750 m2 PS. 6 3,900.00 1,535,625.00
3 Membongkar nok, gording, kuda-kuda bangunan lama 0.797 m3 PS. 7 552,000.00 439,780.61
SUB TOTAL I : 2,439,041.83
II PEKERJAAN TANAH
1 Galian tanah pondasi 3.300 m3 T.1 31,500.00 103,950.00
2 Urugan kembali 1.089 m3 T.13 10,500.00 11,434.50
3 Urugan pasir hurug bawah pondasi 0.550 m3 T.14 119,280.00 65,604.00
SUB TOTAL II : 180,988.50
III PEKERJAAN PONDASI
1 Pasang pondasi umpak batu kali 1 PC : 8 Ps 1.760 m3 Pd.4 556,084.00 978,707.84
dengan pasir beton
SUB TOTAL III : 978,707.84
IV PEKERJAAN DINDING dan PLESTERAN
1 Pasangan Batu Merah Kali Pucang Tebal 1 bata, 30.900 m2 D.2 193,569.00 5,981,282.10
1Pc : 4 Ps pasir beton (peninggian dinding)
2 Pasangan Batu Merah Kali Pucang Tebal 1/2 bata, 19.200 m2 D.6 87,330.00 1,676,736.00
1Pc : 8 Ps pasir beton (gunungan/sophi2)
SUB TOTAL IV : 7,658,018.10
V PEKERJAAN BETON
1 Beton Kolom Teras (15 x 15)
a. Beton mutu K.175 0.945 m3 B.2 906,388.55 856,537.18
b. Pembesian 131.080 kg B.7 13,320.00 1,745,979.33
c. Bekisting 25.200 m2 B.12 65,380.00 1,647,576.00
2 Beton Kolom Susupan sudut dinding (15 x 15)
a. Beton mutu K.175 0.810 m3 B.2 906,388.55 734,174.73
b. Pembesian 112.354 kg B.7 13,320.00 1,496,553.71
c. Bekisting 5.400 m2 B.12 65,380.00 353,052.00
3 Kolom praktis beton bertulang pd gunungan 12.000 m1 B.8 67,312.71 807,752.52
4 Beton Balok Sunduk (8 x 20)
a. Beton mutu K.175 0.494 m3 B.2 906,388.55 448,118.50
b. Pembesian 68.629 kg B.7 13,320.00 914,136.95
c. Bekisting 12.070 m2 B.12 65,380.00 789,106.53
d. Perancah 2.472 m2 B.11 76,780.00 189,800.16
5 Beton Balok Konsol (15 x 20)
a. Beton mutu K.175 0.504 m3 B.2 906,388.55 456,819.83
b. Pembesian 67.244 kg B.7 13,320.00 895,685.82
c. Bekisting 9.240 m 2
B.12 65,380.00 604,111.20
d. Perancah 2.520 m2 B.11 76,780.00 193,485.60
6 Ringbalk beton bertulang 109.800 m1 B.9 79,849.35 8,767,458.63
SUB TOTAL V : 20,900,348.69
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME ANALISA
(Rp) (Rp)
a b c d e f
VII PEKERJAAN ATAP dan PENUTUP
1 Pasang kasau & reng baru kayu kruing 59.063 m2 KY.7 115,882.50 6,844,310.16
2 Pasang Kasau kayu lama & Reng baru Kayu Kruing 174.826 m2 KY.7.a 54,178.50 9,471,793.59
3 Pasang kembali / rehab kuda-kuda kayu lama 1.831 m 3
KY.12.a 995,760.00 1,823,340.12
4 Pas. Kembali nok, gording, murplat kayu lama 1.901 m3 KY.12.a 995,760.00 1,892,740.61
SUB TOTAL VII : 20,032,184.48

JUMLAH HARGA TOTAL 52,189,289.44


DIBULATKAN 52,189,200.00

Jepara, 3 September 2013


Menyetujui ; Di buat oleh ;
Ketua Panitia Rehabilitasi Ruang Kelas Perencana
SD N Wanusobo

……………… H. ARIYANTO, ST. MTA. IAI

Mengetahui / Menyetujui ;
Kepala Sekolah Selaku Penanggung Jawab
Rehabilitasi Ruang Kelas
SD N Wanusobo

………………….
NIP. …………………..
REKAPITULASI
RENCANA ANGGARAN BIAYA

KEGIATAN : PELAKSANAAN DANA ALOKASI KHUSUS (DAK) BIDANG PENDIDIKAN KAB. JEPARA
PEKERJAAN : REHABILITASI RUANG KELAS RUSAK SDN WANUSOBO
LOKASI : DESA WANUSOBO KECAMATAN KEDUNG KABUPATEN JEPARA
TAHUN : 2013
VOLUME : 3 RUANG KELAS (DAN PENGEMBANGAN 2 RUANG KEGIATAN/KANTOR)

NO URAIAN PEKERJAAN HARGA

I PEKERJAAN PERSIAPAN 2,439,041.83


II PEKERJAAN TANAH 180,988.50
III PEKERJAAN PONDASI 978,707.84
IV PEKERJAAN DINDING dan PLESTERAN 20,305,832.06
V PEKERJAAN BETON 20,900,348.69
VI PEKERJAAN KOSEN PINTU dan JENDELA 1,112,400.00
VII PEKERJAAN ATAP dan PENUTUP 48,371,640.70
VIII PEKERJAAN PENGGANTUNG dan ASSECORIES 750,720.00
IX PEKERJAAN LANTAI 23,396,166.40
X PEKERJAAN INSTALASI LISTRIK 1,608,400.00
XI PEKERJAAN PENGECATAN 10,428,931.26

JUMLAH HARGA 130,473,177.28


DIBULATKAN 130,473,000.00

TERBILANG : Seratus Tiga Puluh Juta Empat Ratus Tujuh Puluh Tiga Ribu Rupiah

Jepara, 3 September 2013

Menyetujui ; Di buat oleh ;


Ketua Panitia Rehabilitasi Ruang Kelas Perencana
SD N Wanusobo

H.RADLOLI H. ARIYANTO, ST. MTA. IAI

Mengetahui / Menyetujui ;
Kepala Sekolah SDN Wanusobo

RUMANI, S.Pd
NIP. 19630663 198806 1 001
RENCANA ANGGARAN BIAYA

KEGIATAN : PELAKSANAAN DANA ALOKASI KHUSUS (DAK) BIDANG PENDIDIKAN KAB. JEPARA
PEKERJAAN : REHABILITASI RUANG KELAS RUSAK SDN WANUSOBO
LOKASI : DESA WANUSOBO KECAMATAN KEDUNG KABUPATEN JEPARA
TAHUN : 2013
VOLUME : 3 RUANG KELAS (DAN PENGEMBANGAN 2 RUANG KEGIATAN/KANTOR)

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME ANALISA
(Rp) (Rp)
a b c d e f
I PEKERJAAN PERSIAPAN
1 Mengupas plesteran lama 193.182 m2 PS. 5 2,400.00 463,636.22
2 Membongkar usuk dan reng bangunan lama 393.750 m2 PS. 6 3,900.00 1,535,625.00
3 Membongkar nok, gording, kuda-kuda bangunan lama 0.797 m3 PS. 7 552,000.00 439,780.61
SUB TOTAL I : 2,439,041.83
II PEKERJAAN TANAH
1 Galian tanah pondasi 3.300 m3 T.1 31,500.00 103,950.00
2 Urugan kembali 1.089 m3 T.13 10,500.00 11,434.50
3 Urugan pasir hurug bawah pondasi 0.550 m3 T.14 119,280.00 65,604.00
SUB TOTAL II : 180,988.50
III PEKERJAAN PONDASI
1 Pasang pondasi umpak batu kali 1 PC : 8 Ps 1.760 m3 Pd.4 556,084.00 978,707.84
dengan pasir beton
SUB TOTAL III : 978,707.84
IV PEKERJAAN DINDING dan PLESTERAN
1 Pasangan Batu Merah Kali Pucang Tebal 1 bata, 30.900 m2 D.2 193,569.00 5,981,282.10
1Pc : 4 Ps pasir beton (peninggian dinding)
2 Pasangan Batu Merah Kali Pucang Tebal 1/2 bata, 19.200 m2 D.6 87,330.00 1,676,736.00
1Pc : 8 Ps pasir beton (gunungan/sophi2)
3 Plesteran 1 Pc : 8 Ps di aci PC pasir beton 254.98 m2 PL.4 41,070.72 10,472,284.47
4 Plesteran Beton 1 Pc : 2 Ps Tebal 15 mm pasir beton 26.71 m2 PL.6 37,074.00 990,229.49
5 Skonengan sudut 263.40 m1 taksir 4,500.00 1,185,300.00
SUB TOTAL IV : 20,305,832.06
V PEKERJAAN BETON
1 Beton Kolom Teras (15 x 15)
a. Beton mutu K.175 0.945 m3 B.2 906,388.55 856,537.18
b. Pembesian 131.080 kg B.7 13,320.00 1,745,979.33
c. Bekisting 25.200 m2 B.12 65,380.00 1,647,576.00
2 Beton Kolom Susupan sudut dinding (15 x 15)
a. Beton mutu K.175 0.810 m3 B.2 906,388.55 734,174.73
b. Pembesian 112.354 kg B.7 13,320.00 1,496,553.71
c. Bekisting 5.400 m2 B.12 65,380.00 353,052.00
3 Kolom praktis beton bertulang pd gunungan 12.000 m1 B.8 67,312.71 807,752.52
4 Beton Balok Sunduk (8 x 20)
a. Beton mutu K.175 0.494 m3 B.2 906,388.55 448,118.50
b. Pembesian 68.629 kg B.7 13,320.00 914,136.95
c. Bekisting 12.070 m2 B.12 65,380.00 789,106.53
d. Perancah 2.472 m2 B.11 76,780.00 189,800.16
5 Beton Balok Konsol (15 x 20)
a. Beton mutu K.175 0.504 m3 B.2 906,388.55 456,819.83
b. Pembesian 67.244 kg B.7 13,320.00 895,685.82
c. Bekisting 9.240 m 2
B.12 65,380.00 604,111.20
d. Perancah 2.520 m2 B.11 76,780.00 193,485.60
6 Ringbalk beton bertulang 109.800 m1 B.9 79,849.35 8,767,458.63
SUB TOTAL V : 20,900,348.69
VI PEKERJAAN KOSEN PINTU dan JENDELA
1 Rehab Pintu Panyl Kayu lama 5.40 m2 KY.21.a 206,000.00 1,112,400.00
SUB TOTAL VI : 1,112,400.00
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME ANALISA
(Rp) (Rp)
a b c d e f
VII PEKERJAAN ATAP dan PENUTUP
1 Pasang kasau & reng baru kayu kruing 59.063 m2 KY.7 115,882.50 6,844,310.16
2 Pasang Kasau kayu lama & Reng baru Kayu Kruing 334.688 m2 KY.7.a 54,178.50 18,132,866.72
3 Pasang kembali / rehab kuda-kuda kayu lama 1.831 m3 KY.12.a 995,760.00 1,823,340.12
4 Pas. Kembali nok, gording, murplat kayu lama 1.901 m3 KY.12.a 995,760.00 1,892,740.61
5 Pasang atap genteng pres lokal (sulaman baru) 9.844 m2 PA.1 57,330.00 564,342.19
6 Pasang kembali atap genteng lama 383.906 m 2
PA.5.a 11,730.00 4,503,220.31
7 Pasang kerpus lokal (baru) 31.500 m1 PA.8 50,262.00 1,583,253.00
8 Pasang pyan eternit atrisco dg rangka kayu baru 109.50 m2 LL.2 111,700.00 12,231,150.00
(2 ruang dalam kelas)
9 Pasang List kayu profil 59.20 m1 LL.7 13,453.00 796,417.60
SUB TOTAL VII : 48,371,640.70
VIII PEKERJAAN PENGGANTUNG dan ASSECORIES
1 Pasang kunci pintu 2 x putar 3.00 bh KK.1 150,580.00 451,740.00
2 Pasang engsel pintu 9.00 bh KK.3 33,220.00 298,980.00
SUB TOTAL VIII : 750,720.00
IX PEKERJAAN LANTAI
1 Pasang Lantai Keramik 40x40 warna (teras kelas) 53.80 m2 L.2 122,557.00 6,593,566.60
2 Pas. Lantai Keramik 30x30 Putih (3 ruang dalam kelas) 153.30 m 2
L.6 109,606.00 16,802,599.80
SUB TOTAL IX : 23,396,166.40
X PEKERJAAN INSTALASI LISTRIK
1 Pasang jaringan instalasi listrik 10.00 titik taksir 115,800.00 1,158,000.00
2 Pasang lampu SL 20 watt Ex. Philips + fitting 8.00 bh taksir 44,935.00 359,480.00
3 Pasang saklar ganda Ex. Broco 2.00 bh taksir 24,160.00 48,320.00
4 Pasang stop kontak Ex. Broco 2.00 bh taksir 21,300.00 42,600.00
SUB TOTAL X : 1,608,400.00
XI PEKERJAAN PENGECATAN
1 Mengecat kayu 3 kali 3.08 m2 C.1 27,551.78 84,815.40
2 Mengecat kayu 2 kali 98.43 m 2
C.2 17,741.02 1,746,227.31
3 Mengecat tembok baru dengan decolith 281.69 m2 C.11 18,645.00 5,252,134.29
4 Mengecat tembok ulang dengan decolith 139.89 m2 C.12 9,322.50 1,304,126.76
5 Mengecat plafond dengan decolith 109.50 m 2
C.11 18,645.00 2,041,627.50
SUB TOTAL XI : 10,428,931.26

JUMLAH HARGA TOTAL 130,473,177.28


DIBULATKAN 130,473,000.00

Jepara, 3 September 2013


Menyetujui ; Di buat oleh ;
Ketua Panitia Rehabilitasi Ruang Kelas Perencana
SD N Wanusobo

H.RADLOLI H. ARIYANTO, ST. MTA. IAI

Mengetahui / Menyetujui ;
Kepala Sekolah SDN Wanusobo

RUMANI, S.Pd
NIP. 19630663 198806 1 001
BACK UP VOLUME
KEGIATAN : PELAKSANAAN DANA ALOKASI KHUSUS (DAK) BIDANG PENDIDIKAN KAB. JEPARA
PEKERJAAN : REHABILITASI RUANG KELAS RUSAK SDN WANUSOBO
LOKASI : DESA WANUSOBO KECAMATAN KEDUNG KABUPATEN JEPARA
TAHUN : 2013
VOLUME : 3 RUANG KELAS (DAN PENGEMBANGAN 2 RUANG KEGIATAN/KANTOR)

RAB Anggaran Rp 130,473,000.00


luas lantai p l
r. dalam 1 7.50 x 7.50 = 56.25
2 7.50 x 7.50 = 56.25
3 7.50 x 7.50 = 56.25
r.k 5.00 x 7.50 = 37.50

Teras 1 7.50 x 2.00 = 15.00


2 7.50 x 2.00 = 15.00
3 7.50 x 2.00 = 15.00
r.k 5.00 x 2.00 = 10.00

Jumlah 261.25
Harga/m2 Rp 499,418.18
I PEKERJAAN PERSIAPAN

1 Membongkar dinding bata bangunan lama


: 0.25 x 7.15 x - = 0.000 m3

2 Mengupas plesteran lama rk


memanjang : 3.00 14.60 x 2.00 x 3.00 = 262.80
x

:
melebar : 3.00 7.00 x 6.00 = 126.00
x

sisi
388.80

dikurangi pintu jendela p : 1.02 x 2.40 x 1.00 x 3.00 = 7.34


j : 2.00 x 1.45 x 2.00 x 3.00 = 17.40
partisi/penyekat/roling : 2.25 x 2.00 x 2.00 x - = -
bv : 1.00 x 0.52 X 2.00 x 3.00 = 3.12

27.86
27.86 x 2.00 55.73

Plesteran baru 388.80 - 55.73 = 333.07 x 0.58 = 193.182 m2


%

sisa (plesteran lama) 333.07 - 193.18 = 139.890

3 Membongkar usuk dan reng bangunan lama


r. kelas : 7.50 12.50 x 3.00 = 281.250
x

r. kecil : 9.00 12.50 x 1.00 = 112.500


x

393.750 m2

4 Membongkar nok, gording, kuda-kuda bangunan lama


Miring : 0.08 x 0.12 x 4.22 x 2.00 x 1.00 = 0.081 m3
tarik : 0.08 x 0.12 x 7.30 x 1.00 = 0.070
Silang : 0.08 x 0.12 x 2.00 x 2.00 x 1.00 = 0.038
Ander : 0.08 x 0.12 x 2.75 x 1.00 = 0.026
gapit : 0.06 x 0.12 x 4.20 x 2.00 x 1.00 = 0.060
sambungan : 0.08 x 0.12 x 1.00 x 3.00 x 1.00 = 0.029

Nok : 0.08 x 0.12 x 7.50 x 1.00 = 0.072


Gording : 0.08 x 0.12 x 7.50 x 2.00 x 1.00 = 0.144
Murplat : 0.08 x 0.12 x 7.50 x 3.00 x 1.00 = 0.216
Balok angin : 0.08 x 0.12 x 3.10 x 2.00 x 1.00 = 0.060

0.797 m3

5 Membongkar plafond eternit bangunan lama : 7.50 7.00 x - = 0.000


x

0.000 m2
II PEKERJAAN TANAH
1 Galian tanah pondasi umpak batu kali
teras menerus : 1.00 0.70 x 0.70 x - = - m3

+
2
umpak : 0.50 0.50 x 0.60 x 14.00 = 2.10

x
induk menerus : 1.00 1.00 x 0.90 x - = - m3

+
2 +

umpak : 0.50 0.50 x 0.60 x 8.00 = 1.20

x
Galian tanah pondasi rollag bata : 0.30 0.30 x - = -

x
m3
3.30

2 Urugan tanah kembali : 0.33 3.30 = 1.09 m3

x
3 Urugan tanah peninggian : - 261.25 = -

x
: +
- m3

4 Urugan Pasir bawah pondasi : 0.10 - x - = - m3

x
: 0.10 - x - = -

x
umpak : 0.10 0.50 x 0.50 x 14.00 = 0.35
x
: 0.10 0.50 x 0.50 x 8.00 = 0.20
x

Urugan Pasir bawah pondasi rollaag : 0.10 0.20 x - = -


x

m3
0.55

5 Urugan Pasir bawah lantai : - 261.25 = - m3


x

III PEKERJAAN PONDASI


1 Aanstamping : 0.20 0.60 x - = - = - m3
x

0.20 0.80 x - = -
x

-
2 Pasangan batu belah
teras menerus : 0.30 0.50 x 0.50 x - = - = 1.76 m3
+

umpak : 0.40 0.40 x 0.50 x 14.00 = 1.12


x

induk menerus : 0.30 0.70 x 0.70 x - = -


+

umpak : 0.40 0.40 x 0.50 x 8.00 = 0.64


x

1.76

3 Pasang rollag trashram batumerah : 0.15 0.25 x - x - = 0.000 m3

IV PEKERJAAN PASANGAN T P

1 Pasangan Batu Merah Kali Pucang Tebal 1 bata, : 0.50 61.80 = 30.90
x

1Pc : 4 Ps pasir beton (peninggian dinding)

2 Pasangan Batu Merah Kali Pucang Tebal 1/2 bata,


1Pc : 8 Ps pasir beton (peninggian gunungan/sophi2)
: 0.40 4.00 2.00 6.00
x

= 19.20 m2

3 Plesteran 1 Pc : 8 Ps di aci PC pasir beton


dinding baru : 30.90 2.00 = 61.80 m2
x

dinding lama di plester baru kisaran 0.58 % = 193.18

254.98 m2

4 Plesteran Beton 1 Pc : 2 Ps Tebal 15 mm pasir beton


Beton Kolom Teras (15 x 15) 25.20
Beton Kolom Susupan sudut dinding (15 x 15) 5.40
Beton Balok Sunduk (8 x 20) 12.07
Beton Balok Konsol (15 x 20) : 9.24
+

26.71 = 26.71

7 Skonengan sudut
Beton Kolom Teras (15 x 15) 168.00
Beton Kolom Susupan sudut dinding (15 x 15) -
Beton Balok Sunduk (8 x 20) 61.80
Beton Balok Konsol (15 x 20) 33.60
+
263.40 = 263.40
+
-
263.40 m'

V PEKERJAAN BETON

1 Beton Kolom Teras (15 x 15)


a. Beton mutu K.175 : 0.15 0.15 x 3.00 x 14.00 = 0.945 m3

x
b. Pembesian Pokok : 4.00 0.62 x 3.00 x 14.00 = 103.656

x
Begel : 17.65 0.22 x 0.50 x 14.00 = 27.424 +

x
131.080 kg

c. Bekisting : 0.60 3.00 x 14.00 = 25.200 m2

x
2 Beton Kolom Susupan sudut dinding (15 x 15)
a. Beton mutu K.175 : 0.15 0.15 x 4.50 x 8.00 = 0.810 m3
x

b. Pembesian Pokok : 4.00 0.62 x 4.50 x 8.00 = 88.848


x

Begel : 26.47 0.22 x 0.50 x 8.00 = 23.506 +


x

112.354 kg

c. Bekisting : 0.15 4.50 x 8.00 = 5.400 m2


x

3 Kolom praktis beton bertulang pd gunungan = 12.00 m'


gunungan 2.00 6.00 = 12.00 +
x

12.00

6 Balok latiue beton bertulang : = 0.000 m'

4 Beton Balok Sunduk (8 x 20)


a. Beton mutu K.175 : 0.08 0.20 x 30.90 = 0.494 m3
x

b. Pembesian Pokok : 3.00 0.62 x 30.90 = 57.196


x

Begel : 206.00 0.22 x 0.25 = 11.433 +


x

68.629 kg

c. Bekisting : 0.39 30.90 = 12.070 m2


x

d. Perancah : 0.08 30.90 = 2.472 m2


x

7 Beton Balok Konsol (15 x 20)


a. Beton mutu K.175 : 0.15 0.20 x 16.80 = 0.504 m3
x

b. Pembesian Pokok : 5.00 0.62 x 16.80 = 51.828


x

Begel : 112.00 0.22 x 0.62 = 15.416 +


x

67.244 kg

c. Bekisting : 0.55 16.80 = 9.240 m2


x

d. Perancah : 0.15 16.80 = 2.520 m2


x

9 Ringbalk beton bertulang : = 109.800 m'


dinding = 61.80

gunungan 4.00 2.00 6.00 = 48.00


x

109.80

VI PEKERJAAN KOSEN PINTU dan JENDELA


Pasang kusen pintu dan jendela kayu bengkirai :
dengan krepyaknya P Q
P : 0.06 x 0.12 x 7.68 x - = 0.000
krepyaknya : 0.02 x 0.10 x 0.92 x - x 5.00 = 0.000
J1 : 0.06 x 0.12 x 14.14 x - = 0.000
krepyaknya : 0.02 x 0.10 x 0.72 x - x 15.00 = 0.000
J2 : 0.06 x 0.12 x 9.40 x - = 0.000
krepyaknya : 0.02 x 0.10 x 0.72 x - x 10.00 = 0.000
Boven : 0.06 x 0.12 x 6.00 x - = 0.000

+
- m3
2 Bikin daun pintu rangka kayu bengkirai tb. 3,5 cm Q
panil multiplek tb. 9 mm
P : 0.90 x 2.00 x - = - m2

: 0.90 x 2.00 x - = -
+
- m2

Rehab Pintu Panyl Kayu lama


: 0.90 x 2.00 x 3 = 5.40 m2
+
5.40 m2
3 Pasang jendela kaca kayu kanfer tb. 3 cm Q
krepyaknya : 0.70 x 1.20 x - x 1 = -
J1 : 0.70 x 1.20 x - x 1 = -
J2 : 0.70 x 1.20 x - x 2 = -

+
- m2

VII PEKERJAAN ATAP dan PENUTUP

Pasang kasau & reng baru kayu kruing

depan : 31.50 x 7.00 = 220.500


belakang : 31.50 x 5.50 = 173.250 +

393.750 m2

Pasang Baru 393.75 x 0.15 = 59.063


%

Pasang Kasau kayu lama & Reng baru Kayu Kruing


Pasang Lama 393.75 x 0.85 = 334.688
%
393.750 ok

5 Pasang Konstruksi Kuda-Kuda Kayu kruing cheks


Kuda kuda baru Miring : 0.08 x 0.12 x 4.22 x 2.00 x - = 0.000 m3
tarik : 0.08 x 0.12 x 7.30 x - = 0.000
Silang : 0.08 x 0.12 x 2.00 x 2.00 x - = 0.000
Ander : 0.08 x 0.12 x 2.75 x - = 0.000
gapit : 0.06 x 0.12 x 4.20 x 2.00 x - = 0.000
sambungan : 0.08 x 0.12 x 1.00 x 3.00 x - = 0.000

0.000
Pasang kembali / rehab kuda-kuda kayu lama
Kuda kuda lama Miring : 0.08 x 0.12 x 4.22 x 2.00 x 6.00 = 0.486 m3
tarik : 0.08 x 0.12 x 7.30 x 6.00 = 0.420
Silang : 0.08 x 0.12 x 2.00 x 2.00 x 6.00 = 0.230
Ander : 0.08 x 0.12 x 2.75 x 6.00 = 0.158
gapit : 0.06 x 0.12 x 4.20 x 2.00 x 6.00 = 0.363
sambungan : 0.08 x 0.12 x 1.00 x 3.00 x 6.00 = 0.173

1.831

Kayu baru Nok : 0.08 x 0.12 x - x 1.00 = 0.000

Kayu baru Gording dalam : 0.08 x 0.12 x - x 2.00 = 0.000

Kayu baru murplat /gording teras : 0.08 x 0.12 x - x 1.00 = 0.000

Kayu baru Murplat : 0.08 x 0.12 x - x 2.00 = 0.000

Kayu baru Balok angin : 0.08 x 0.12 x - x 3.00 = 0.000

0.000

Kayu Lama Nok : 0.08 x 0.12 x 31.50 x 1.00 = 0.302

Kayu Lama Gording dalam : 0.08 x 0.12 x 31.50 x 2.00 = 0.605


m3
Kayu Lama murplat /gording teras : 0.08 x 0.12 x 31.50 x 1.00 = 0.302

Kayu Lama Murplat : 0.08 x 0.12 x 31.50 x 2.00 = 0.605

Kayu Lama Balok angin : 0.08 x 0.12 x 3.00 x 3.00 = 0.086

1.901
3 Pasang atap genteng pres lokal (sulaman baru) : 393.75 x 0.03 3% = 9.84

Pasang kembali atap genteng lama 393.75 x 0.98 95% = 383.91

4 Pasang kerpus lokal (baru) :


31.50 = 31.50

Pasang pyan eternit atrisco dg rangka kayu baru


dalam kelas : 7.50 x 7.30 x 2.00 = 109.50

#REF!
: 7.50 x 7.30 x - = -

Pasang List kayu profil


dalam kelas 29.60 x 2.00 = 59.20

Pasang Lisplank Uk. 3/20 Kayu bengkirai : - = -

PEKERJAAN PENGGANTUNG dan ASSECORIES

m2
PEKERJAAN LANTAI
Pas. Lantai Keramik 30x30 Putih (3 ruang dalam kelas)
Pas. Lantai Keramik 30x30 Putih (3 ruang dalam kelas)
dalam kelas : 7.30 x 7.00 x 3.00 = 153.30 = 153.30

Pasang Lantai Keramik 40x40 warna (teras kelas)


teras depan : 7.30 x 2.00 x 3.00 = 43.80
5.00 x 2.00 x 1.00 = 10.00

53.80
PEKERJAAN PENGECATAN

1 Mengecat kayu 3 kali


Kusen P : 0.36 x 7.68 x - = 0.000
krepyaknya 0.22 x 0.92 x - x - = 0.000
J1 : 0.36 x 14.14 x - = 0.000
krepyaknya 0.22 x 0.72 x - x - = 0.000
BV : 0.36 x 6.00 x - = 0.000

Daun pintu : 5.40 x - = 0.000 m2

Daun jendela : 2 x 0.16 x 1.90 x 2.00 x - = 0.000


: 2 x 0.16 x - x - x - = 0.000

Lisplank : - x 0.30 = 0.000 m2

List : 59.20 x 0.05 = 3.078 m2

Jumlah Total cat kayu 3X = 3.078 m2

2 Mengecat kayu 2 kali

Kusen P : 0.36 x 7.68 x 3.00 = 8.294


krepyaknya 0.22 x 0.92 x 3.00 x 5.00 = 3.036
J1 : 0.36 x 14.14 x 6.00 = 30.542
krepyaknya 0.22 x 0.72 x 6.00 x 15.00 = 14.256
J2 : 0.36 x 9.40 x - = 0.000
krepyaknya 0.22 x 0.72 x - x 10.00 = 0.000
Boven 0.36 x 6.00 x 9.00 x 3.00 = 19.440

Daun pintu : 0.90 x 2.10 x 3.00 x 2.00 = 11.340 m2

Daun jendela : 2 x 0.16 x 3.00 x 2.00 x 6.00 = 11.520


: 2 x 0.16 x - x - x - = 0.000

Lisplank : 0.43 x - = 0.000 m2

List : 0.03 x - = 0.000 m2

Jumlah Total cat kayu 3X = 98.429 m2

3 Mengecat tembok baru dengan decolith :


dinding baru 61.80
dinding lama di plester baru 193.18
kolom2 beton 26.71

281.69 = 281.69 m2

4 Mengecat tembok ulang dengan decolith


sisa (plesteran lama) 139.89

= 139.890
5 Mengecat plafon dengan decolith
109.50
- = 109.500
+
109.50
DAFTAR HARGA SATUAN BAHAN BANGUNAN
KABUPATEN JEPARA TAHUN 2013

HARGA SATUAN
NO BAHAN / MATERIAL SATUAN KET
BAHAN

I. BAHAN / MATERIAL
1 Batu belah 15 - 20 cm / m3 Rp 133,350
2 Batu pecah 1 - 2 cm / m3 Rp 204,690
3 Batu merah Kali Pucang / bj Rp 600
4 Pasir hurug / timbun / m3 Rp 88,900
5 Pasir beton / Muntilan / m3 Rp 241,000
6 Pasir pasang (lokal) /m 3
Rp 138,000
7 Tanah hurug / m3 Rp 29,100
8 Sirtu / m3 Rp 115,000
9 S e m e n ( PC ) / kg Rp 1,520
10 Semen PC warna / kg Rp 11,250
11 Cat besi (emco/dextro) / kg Rp 52,660
12 Cat kayu / kg Rp 50,500
13 Cat Tembok Mowilex utk luar ruangan / kg Rp 87,600
14 Cat Tembok Mowilex utk dalam ruangan (standar) / kg Rp 56,800
15 Cat Tembok Decolith/sintex / kg Rp 18,000
16 Plamur / kg Rp 14,600
17 Amplas / lbr Rp 12,240
18 Meni / kg Rp 28,200
19 Baut Baja / kg Rp 17,160
20 Baja tulangan beton / besi beton / kg Rp 11,690
21 Paku usuk / reng / kg Rp 14,950
22 Kawat baja / bindrat / kg Rp 19,300
23 Multiplek 9 mm (90x220) / lbr Rp 134,000
24 Triplek 3 mm (90 x 220) / lbr Rp 50,500
25 Kalsiboard (4,50 mm x 1200 mm x 2400 mm) / lbr Rp 80,000
26 Lem kayu / kg Rp 16,000
27 Afduners / ltr Rp 11,970
28 Ubin keramik 40/40 putih (sekualitas Asia/Mulia) / bh Rp 8,600
29 Ubin keramik 40/40 warna (sekualitas Asia/Mulia) / bh Rp 10,200
30 Ubin keramik warna 30/30 (sekualitas Asia/Mulia) / bh Rp 4,800
31 Ubin keramik 30/30 cm putih (sekualitas Asia/Mulia) / bh Rp 4,300
32 Ubin keramik warna 20/20 (sekualitas Asia/Mulia) / bh Rp 2,100
33 Blok pafing tebal 6 cm lokal / m2 Rp 41,900
34 Blok pafing blok tebal 6 cm K.225 / m2 Rp 72,000
35 Buis beton U 20 / m' Rp 43,000
36 Kloset INA jongkok / bh Rp 121,000
37 Wastafel / bh Rp 269,000
38 Bak CuciPiring Stainles / bh Rp 191,000
39 Tempat sabun tanam / bh Rp 32,000
40 Floor drain / bh Rp 11,000
41 Eternit kerang super / m2 Rp 15,000
42 Asbes plat tb 2 mm / atrisco / m2 Rp 18,000
43 Asbes plat tb 4 mm / m2 Rp 16,000
44 Asbes kalsiplank / m' Rp 30,000
45 Genting pres lokal / bh Rp 1,100
46 Genting pres Jatiwangi (kecil) tak berwarna / bh Rp 1,900
47 Genting bubung Jatiwangi tak berwarna / bh Rp 15,600
48 Genting bubung lokal / bh Rp 2,700
49 Kayu hutan / m3 Rp 4,375,000
50 Kayu randu / m3 Rp 900,000
51 Kayu Kruing eks Banjar Merah / m3 Rp 8,570,000
52 Kayu bengkirai / m3 Rp 10,810,000
53 Kayu kanfer /m 3
Rp 9,650,000
54 Bambu / btg Rp 18,000
55 Kaca bening 5 mm / m2 Rp 73,000
56 Rolling door alumunium tebal 5 mm / m2 Rp 346,500
57 Folding door alumunium tebal 5 mm / m2 Rp 400,000
58 Kasa / m2 Rp 19,000
59 Engsel pintu kuningan lokal / bh Rp 23,500
60 Engsel jendela / set Rp 12,000
61 Kunci tanam royal / sekualitas / bh Rp 122,500
62 Sloot / grendel pintu / bh Rp 5,500
63 Hak angin biasa / bh Rp 5,000
64 Handle jendela / bh Rp 5,500
65 Rel Pintu Dorong / bh Rp 198,000
66 Pipa PVC Ø 1/2" AW / m' Rp 5,200
67 Pipa PVC Ø 3/4" AW / m' Rp 6,500
68 Pipa PVC Ø 1" AW / m' Rp 8,300
69 Pipa PVC Ø 2" AW / m' Rp 17,800
70 Pipa PVC Ø 3" AW / m' Rp 36,000
71 Pipa PVC Ø 4" AW / m' Rp 54,000
72 Kran stainlesteel / bh Rp 47,000
73 Asbes Gelombang besar (2,25x0,92x5mm) / lbr Rp 108,500
74 Nok stel asbes / m' Rp 68,750
75 Paku sumbat / kait / bj Rp 1,500
76 Skrup fizzer / bh Rp 1,100
77 Sealant / tube Rp 28,000
78 Besi Strip 2 cm / m1 Rp 20,600
79 List kayu profil / m1 Rp 7,500
80 Besi holow 40 x 40 / m1 Rp 10,250
81 Kompon / kg Rp 17,800
82 Alumunium strip / m2 Rp 35,000
83 Profil alumunium / m' Rp 104,900
84 Skrup fizzer / bh Rp 1,100
85 Seng plat BJLS 28 / lbr Rp 43,750
86 Air / ltr Rp 17
NO JENIS TENAGA KERJA SATUAN HARGA SATUAN

1 Mandor 1 hari Rp -
2 Kepala tukang gali 1 hari Rp 60,000
3 Tukang gali / pekerja 1 hari Rp 42,000
4 Kepala tukang batu 1 hari Rp 60,000
5 Tukang batu 1 hari Rp 54,000
6 Laden tukang batu/pekerja 1 hari Rp 48,000
7 Kepala tukang kayu 1 hari Rp 60,000
8 Laden tukang kayu/pekerja 1 hari Rp 48,000
9 Tukang kayu 1 hari Rp 54,000
10 Kepala tukang besi 1 hari Rp 60,000
11 Tukang besi 1 hari Rp 54,000
12 Laden tukang besi/pekerja 1 hari Rp 48,000
13 Kepala tukang cat 1 hari Rp 60,000
14 Tukang cat 1 hari Rp 54,000
15 Laden tukang cat /pekerja 1 hari Rp 48,000
16 Laden tukang pipa/pekerja 1 hari Rp 28,500
NO URAIAN UNIT INSTALASI DAN
HARGA
ALAT BERAT
1 Motor Grader 100 HP Rp 236,500 / jam
2 Wheel loader 115 HP Rp 192,500 / jam
3 Wheel tractor 60 HP Rp 82,500 / jam
4 Roller vibrator Self P6 - 6 Rp 170,500 / jam
5 Water tank truck 115 HP Rp 82,500 / jam
6 Dump truck 3,5 Ton/115 HP Rp 71,500 / jam
7 Service Car Rp 95,300 / jam
DAFTAR ANALISA BIAYA SATUAN PEKERJAAN
PEKERJAAN KONSTRUKSI
KABUPATEN JEPARA
TAHUN 2013

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL
UPAH
1 2 3 4 5 6 7 8=4x7 9

I 03-2835-2002 PEKERJAAN PERSIAPAN

PS. 1 1.0000 m' Pengukuran dan Pemasangan Bouwplank


0.0120 m3 kayu 5/7x4m kayu hutan 4,375,000.00 52,500.00
0.0200 kg paku biasa 2"-5" 14,950.00 299.00
0.0070 m3 kayu papan 3/20 randu 900,000.00 6,300.00
59,099.00
0.1000 OH tukang kayu 54,000.00 5,400.00
0.1000 OH pekerja 48,000.00 4,800.00
0.0100 OH kepala tukang 60,000.00 600.00
0.0050 OH mandor - -
10,800.00
69,899.00
PS. 2 1.0000 m2 Membersihkan Lapangan dan Peralatan
0.1000 OH pekerja 48,000.00 4,800.00
0.0500 OH mandor - -
4,800.00
PS. 3 1.0000 m3 Bongkar Beton Bertulang
6.6670 OH pekerja 48,000.00 320,016.00
0.3330 OH mandor - -
320,016.00
PS. 4 1.0000 m3 membongkar dinding bata merah
6.6670 OH pekerja 48,000.00 320,016.00
0.0330 OH mandor - -
320,016.00
PS. 5 1.0000 m2 mengupas plesteran
0.0500 OH pekerja 48,000.00 2,400.00
0.0025 OH mandor - -
2,400.00
PS. 6 1.0000 m2 membongkar usuk dan reng
0.0250 OH Tukang kayu 54,000.00 1,350.00
0.0025 OH Kepala tukang kayu 60,000.00 150.00
0.0500 OH pekerja 48,000.00 2,400.00
0.0050 OH mandor - -
3,900.00
PS. 7 1.0000 m3 membongkar kuda-kuda
6.0000 OH Tukang kayu 54,000.00 324,000.00
0.6000 OH Kepala tukang kayu 60,000.00 36,000.00
4.0000 OH pekerja 48,000.00 192,000.00
0.2000 OH mandor - -
552,000.00
PS. 8 1.0000 m2 membongkar plafond eternit
0.2500 OH pekerja 48,000.00 12,000.00
0.0250 OH mandor - -
12,000.00
PS. 9 1.0000 m2 galian tanah keras/mengupas permukaan aspal
1.0000 OH pekerja 48,000.00 48,000.00
0.0330 OH mandor - -
48,000.00
PS. 10 1.0000 m2 Membuat Andang Dari Bambu
1.0000 btg bambu Ø 6-8/600 cm 18,000.00 18,000.00
0.2500 kg paku 14,950.00 3,737.50
21,737.50
0.1700 OH tukang kayu 54,000.00 9,180.00
0.2500 OH pekerja 48,000.00 12,000.00
0.0020 OH kepala tukang 60,000.00 120.00
0.0013 OH mandor - -
21,300.00
43,037.50

II DT 91-0006 PEKERJAAN TANAH


2007
T.1 1.0000 m3 Galian Tanah Biasa Sedalam 1 m
0.7500 OH pekerja 42,000.00 31,500.00
0.0250 OH mandor - -
31,500.00
T.10 1.2000 m3 Urugan tanah biasa dan dipadatkan
1.2000 m3 tanah biasa 29,100.00 34,920.00
0.0714 jam pekerja 42,000.00 2,998.80
0.0178 jam mandor - -
NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL
UPAH
1 2 3 4 5 6 7 8=4x7 9
0.0178 jam whell loader 192,500.00 3,426.50
0.2289 jam dump truck 71,500.00 16,366.35
NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL
UPAH
1 2 3 4 5 6 7 8=4x7 9
0.0061 jam motor grader 236,500.00 1,442.65
0.0100 jam vibro roller 170,500.00 1,705.00
0.0070 jam water tangker 82,500.00 577.50
1.0000 ls alat bantu 1,500.00 1,500.00
62,936.80
T.13 1.0000 m3 Urugan Kembali
0.2500 OH pekerja 42,000.00 10,500.00
0.0083 OH mandor - -
10,500.00
T.14 1.0000 m3 Urugan Pasir Hurug
1.2000 m3 pasir hurug 88,900.00 106,680.00
0.3000 OH pekerja 42,000.00 12,600.00
0.0100 OH mandor - -
119,280.00
T.15 1.0000 m3 Urugan Sirtu padat
1.2000 m3 sirtu 115,000.00 138,000.00
0.2500 OH pekerja 48,000.00 12,000.00
0.0250 OH mandor - -
150,000.00

III DT 91-0007 PEKERJAAN PONDASI


2007
Pd.1 1.0000 m3 Pasang anstampeng batu belah
1.2000 m3 batu belah15/20 133,350.00 160,020.00
0.4320 m3 pasir hurug 88,900.00 38,404.80
198,424.80
0.7800 OH pekerja 48,000.00 37,440.00
0.3900 OH tukang batu - -
0.0390 OH kepala tukang 60,000.00 2,340.00
0.0390 OH mandor - -
39,780.00
238,204.80
Pd.3 1.0000 m3 Pasang Pondasi Batu Kali 1Pc : 8 Ps dengan pasir lokal
1.2000 m3 batu belah 133,350.00 160,020.00
91.0000 kg semen / PC 1,520.00 138,320.00
0.5840 m3 pasir pasang 138,000.00 80,592.00
378,932.00
1.5000 OH pekerja 48,000.00 72,000.00
0.7500 OH tukang batu 54,000.00 40,500.00
0.0750 OH kepala tukang 60,000.00 4,500.00
0.0750 OH mandor - -
117,000.00
495,932.00
Pd.4 1.0000 m3 Pasang Pondasi Batu Kali 1Pc : 8 Ps dengan pasir Beton
1.2000 m3 batu belah 133,350.00 160,020.00
91.0000 kg semen / PC 1,520.00 138,320.00
0.5840 m3 pasir beton 241,000.00 140,744.00
439,084.00
1.5000 OH pekerja 48,000.00 72,000.00
0.7500 OH tukang batu 54,000.00 40,500.00
0.0750 OH kepala tukang 60,000.00 4,500.00
0.0750 OH mandor - -
117,000.00
556,084.00
Pd.9 1.0000 m3 Pasang Pondasi Rolag Trashraam Bata Merah 1 Pc : 3 Ps
500.0000 m3 bata merah 600.00 300,000.00
156.0000 kg semen / PC 1,520.00 237,120.00
0.3300 m3 pasir pasang 138,000.00 45,540.00
582,660.00
4.5000 OH pekerja 48,000.00 216,000.00
1.5000 OH tukang batu 54,000.00 81,000.00
0.1500 OH kepala tukang 60,000.00 9,000.00
0.2250 OH mandor - -
306,000.00
888,660.00
IV DT 91-0009 PEKERJAAN DINDING
2007
D.1 1.0000 m2 Pasangan Batu Merah Kali Pucang Tebal 1 bata, 1Pc : 4 Ps pasir lokal
150.0000 bh biji bata merah Kali Pucang 600.00 90,000.00
26.5500 kg semen / PC 1,520.00 40,356.00
0.0930 m3 pasir pasang 138,000.00 12,834.00
143,190.00
0.6000 OH pekerja 48,000.00 28,800.00
0.2000 OH tukang batu 54,000.00 10,800.00
0.0200 OH kepala tukang 60,000.00 1,200.00
0.0300 OH mandor - -
40,800.00
183,990.00
NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL
UPAH
1 2 3 4 5 6 7 8=4x7 9
D.2 1.0000 m2 Pasangan Batu Merah Kali Pucang Tebal 1 bata, 1Pc : 4 Ps pasir beton
150.0000 bh biji bata merah Kali Pucang 600.00 90,000.00
26.5500 kg semen / PC 1,520.00 40,356.00
0.0930 m3 pasir beton 241,000.00 22,413.00
152,769.00
0.6000 OH pekerja 48,000.00 28,800.00
0.2000 OH tukang batu 54,000.00 10,800.00
0.0200 OH kepala tukang 60,000.00 1,200.00
0.0300 OH mandor - -
40,800.00
193,569.00
D.3 1.0000 m2 Pasangan Batu Merah Kali Pucang Tebal 1/2 bata, 1Pc : 3 Ps pasir lokal
75.0000 bh biji bata merah Kali Pucang 600.00 45,000.00
14.3700 kg semen / PC 1,520.00 21,842.40
0.0400 m3 pasir pasang 138,000.00 5,520.00
72,362.40
0.3000 OH pekerja 48,000.00 14,400.00
0.1000 OH tukang batu 54,000.00 5,400.00
0.0100 OH kepala tukang 60,000.00 600.00
0.0150 OH mandor - -
20,400.00
92,762.40
D.4 1.0000 m2 Pasangan Batu Merah Kali Pucang Tebal 1/2 bata, 1Pc : 3 Ps pasir beton
75.0000 bh biji bata merah Kali Pucang 600.00 45,000.00
14.3700 kg semen / PC 1,520.00 21,842.40
0.0400 m3 pasir muntilan 241,000.00 9,640.00
76,482.40
0.3000 OH pekerja 48,000.00 14,400.00
0.1000 OH tukang batu 54,000.00 5,400.00
0.0100 OH kepala tukang 60,000.00 600.00
0.0150 OH mandor - -
20,400.00
96,882.40
D.5 1.0000 m2 Pasangan Batu Merah Kali PucangTebal 1/2 bata, 1Pc : 8 Ps pasir lokal
75.0000 bh biji bata merah Kali Pucang 600.00 45,000.00
6.5000 kg semen / PC 1,520.00 9,880.00
0.0500 m3 pasir pasang 138,000.00 6,900.00
61,780.00
0.3000 OH pekerja 48,000.00 14,400.00
0.1000 OH tukang batu 54,000.00 5,400.00
0.0100 OH kepala tukang 60,000.00 600.00
0.0150 OH mandor - -
20,400.00
82,180.00
D.6 1.0000 m2 Pasangan Batu Merah Kali PucangTebal 1/2 bata, 1Pc : 8 Ps pasir beton
75.0000 bh biji bata merah Kali Pucang 600.00 45,000.00
6.5000 kg semen / PC 1,520.00 9,880.00
0.0500 m3 pasir beton 241,000.00 12,050.00
66,930.00
0.3000 OH pekerja 48,000.00 14,400.00
0.1000 OH tukang batu 54,000.00 5,400.00
0.0100 OH kepala tukang 60,000.00 600.00
0.0150 OH mandor - -
20,400.00
87,330.00

V DT 91-0010 PEKERJAAN PLESTERAN


2007
PL.1 1.0000 m2 Plesteran 1 Pc : 3 Ps pasir lokal
6.5000 kg semen/PC 1,520.00 9,880.00
0.0194 m3 pasir pasang 138,000.00 2,677.20
12,557.20
0.4000 OH pekerja 48,000.00 19,200.00
0.2000 OH tukang batu 54,000.00 10,800.00
0.0200 OH kepala tukang 60,000.00 1,200.00
0.0200 OH mandor - -
31,200.00
43,757.20
PL.2 1.0000 m2 Plesteran 1 Pc : 3 Ps pasir beton
6.5000 kg semen/PC 1,520.00 9,880.00
0.0194 m3 pasir muntilan 241,000.00 4,675.40
14,555.40
0.4000 OH pekerja 48,000.00 19,200.00
0.2000 OH tukang batu 54,000.00 10,800.00
0.0200 OH kepala tukang 60,000.00 1,200.00
0.0200 OH mandor - -
31,200.00
45,755.40
PL.3 1.0000 m2 Plesteran 1 Pc : 8 Ps di aci PC pasir lokal
NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL
UPAH
1 2 3 4 5 6 7 8=4x7 9
7.1860 kg semen/PC 1,520.00 10,922.72
0.0280 m3 pasir pasang 138,000.00 3,864.00
14,786.72
NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL
UPAH
1 2 3 4 5 6 7 8=4x7 9
0.3000 OH pekerja 48,000.00 14,400.00
0.1500 OH tukang batu 54,000.00 8,100.00
0.0150 OH kepala tukang 60,000.00 900.00
0.0150 OH mandor - -
23,400.00
38,186.72
PL.4 1.0000 m2 Plesteran 1 Pc : 8 Ps di aci PC pasir beton
7.1860 kg semen/PC 1,520.00 10,922.72
0.0280 m3 pasir muntilan 241,000.00 6,748.00
17,670.72
0.3000 OH pekerja 48,000.00 14,400.00
0.1500 OH tukang batu 54,000.00 8,100.00
0.0150 OH kepala tukang 60,000.00 900.00
0.0150 OH mandor - -
23,400.00
41,070.72
PL.5 1.0000 m2 Plester Siar Adukan 1 Pc : 2 Ps
6.3400 kg semen 1,520.00 9,636.80
0.0120 m3 pasir pasang 138,000.00 1,656.00
11,292.80
0.2000 OH pekerja 48,000.00 9,600.00
0.1500 OH tukang batu 54,000.00 8,100.00
0.0150 OH kepala tukang 60,000.00 900.00
0.0100 OH mandor - -
18,600.00
29,892.80
PL.6 1.0000 m2 Plesteran Beton 1 Pc : 2 Ps Tebal 15 mm pasir beton
9.3000 kg semen 1,520.00 14,136.00
0.0180 m3 pasir muntilan 241,000.00 4,338.00
18,474.00
0.2000 OH pekerja 48,000.00 9,600.00
0.1500 OH tukang batu 54,000.00 8,100.00
0.0150 OH kepala tukang 60,000.00 900.00
0.0100 OH mandor - -
18,600.00
37,074.00
VI DT 91-0011 PEKERJAAN KAYU
2007
KY.1 1.0000 m3 Pasang gantungan pyan
15.0000 OH tukang kayu 54,000.00 810,000.00
1.5000 OH tukang kepala 60,000.00 90,000.00
5.0000 OH pekerja 48,000.00 240,000.00
0.2500 OH mandor - -
1,140,000.00
1.1000 m3 kayu kruing 8,570,000.00 9,427,000.00
0.1500 kg paku 14,950.00 2,242.50
9,429,242.50
10,569,242.50
KY.1.a 1.0000 m3 Pasang gantungan pyan dengan kayu lama
15.0000 OH tukang kayu 54,000.00 810,000.00
1.5000 OH tukang kepala 60,000.00 90,000.00
5.0000 OH pekerja 48,000.00 240,000.00
0.2500 OH mandor - -
1,140,000.00
0.1500 kg paku 14,950.00 2,242.50
2,242.50
1,142,242.50
KY.2 1.0000 m3 Pasang Kusen Pintu dan Jendela kayu Bengkirai
1.2000 m3 kayu bengkirai 10,810,000.00 12,972,000.00
1.2500 kg paku 14,950.00 18,687.50
1.0000 kg lem kayu 16,000.00 16,000.00

13,006,687.50
6.0000 OH pekerja 48,000.00 288,000.00
20.0000 OH tukang kayu 54,000.00 1,080,000.00
2.0000 OH kepala tukang 60,000.00 120,000.00
0.3000 OH mandor - -
1,488,000.00
14,494,687.50
KY.2.a 1.0000 m3 Pasang Kusen kusen dengan kayu lama
1.2500 kg paku 14,950.00 18,687.50
1.0000 kg lem kayu 16,000.00 16,000.00

34,687.50
6.0000 OH pekerja 48,000.00 288,000.00
20.0000 OH tukang kayu 54,000.00 1,080,000.00
2.0000 OH kepala tukang 60,000.00 120,000.00
0.3000 OH mandor - -
1,488,000.00
1,522,687.50
NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL
UPAH
1 2 3 4 5 6 7 8=4x7 9
KY.7 1.0000 m2 Pasang Kasau & Reng Kayu Kruing
0.0120 m3 kayu kruing 8,570,000.00 102,840.00
0.1500 kg paku 14,950.00 2,242.50
105,082.50
0.1000 OH pekerja 48,000.00 4,800.00
0.1000 OH tukang kayu 54,000.00 5,400.00
0.0100 OH kepala tukang 60,000.00 600.00
0.0050 OH mandor - -
10,800.00
115,882.50
KY.7.a 1.0000 m2 Pasang Kasau kayu lama & Reng baru Kayu Kruing
0.0048 m3 kayu kruing 8,570,000.00 41,136.00
0.1500 kg paku 14,950.00 2,242.50
43,378.50
0.1000 OH pekerja 48,000.00 4,800.00
0.1000 OH tukang kayu 54,000.00 5,400.00
0.0100 OH kepala tukang 60,000.00 600.00
0.0050 OH mandor - -
10,800.00
54,178.50

KY.8 1.0000 m2 Pasang Kasau & Reng Kayu bengkirai


0.0120 m3 kayu bengkirai 10,810,000.00 129,720.00
0.1500 kg paku 14,950.00 2,242.50
131,962.50
0.1000 OH pekerja 48,000.00 4,800.00
0.1000 OH tukang kayu 54,000.00 5,400.00
0.0100 OH kepala tukang 60,000.00 600.00
0.0050 OH mandor - -
10,800.00
142,762.50
KY.11 1.0000 m3 Pasang Konstruksi Kuda-Kuda Kayu Bengkirai
1.1000 m3 kayu bengkirai 10,810,000.00 11,891,000.00
15.0000 kg baut / angkur 17,160.00 257,400.00
5.6000 kg paku 14,950.00 83,720.00
12,232,120.00
4.0000 OH pekerja 48,000.00 192,000.00
12.0000 OH tukang kayu 54,000.00 648,000.00
1.2000 OH kepala tukang 60,000.00 72,000.00
0.2000 OH mandor - -
912,000.00
13,144,120.00
KY.12 1.0000 m3 Pasang Konstruksi Kuda-Kuda Kayu kruing
1.1000 m3 kayu kruing 8,570,000.00 9,427,000.00
15.0000 kg baut / angkur 17,160.00 257,400.00
5.6000 kg paku 14,950.00 83,720.00
9,768,120.00
4.0000 OH pekerja 48,000.00 192,000.00
12.0000 OH tukang kayu 54,000.00 648,000.00
1.2000 OH kepala tukang 60,000.00 72,000.00
0.2000 OH mandor - -
912,000.00
10,680,120.00
KY.12.a 1.0000 m3 Pasang Konstruksi Kuda-Kuda dg Kayu lama
15.0000 kg baut / angkur 4,800.00 72,000.00
5.6000 kg paku 2,100.00 11,760.00
83,760.00
4.0000 OH pekerja 48,000.00 192,000.00
12.0000 OH tukang kayu 54,000.00 648,000.00
1.2000 OH kepala tukang 60,000.00 72,000.00
0.2000 OH mandor - -
912,000.00
995,760.00
KY.15 1.0000 m2 Pasang Jalusi mati Kosen Kayu Bengkirai
0.0600 m3 kayu bengkirai 10,810,000.00 648,600.00
0.1500 kg paku 14,950.00 2,242.50
650,842.50
0.5000 OH pekerja 48,000.00 24,000.00
2.0000 OH tukang kayu 54,000.00 108,000.00
0.2000 OH kepala tukang 60,000.00 12,000.00
0.0250 OH mandor - -
144,000.00
794,842.50
KY.18 1.0000 m2 Bikin daun pintu rangka kayu bengkirai tb 3,5 cm panil multiplek tb 9mm
0.0140 m3 kayu bengkirai 10,810,000.00 151,340.00
0.2500 lbr mulitplek 134,000.00 33,500.00
0.0500 kg paku 14,950.00 747.50
185,587.50
NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL
UPAH
1 2 3 4 5 6 7 8=4x7 9
2.5000 OH pekerja 48,000.00 120,000.00
7.5000 OH tukang kayu 54,000.00 405,000.00
0.7500 OH kepala tukang 60,000.00 45,000.00
0.1250 OH mandor - -
570,000.00
755,587.50
KY.21 1.0000 m2 Pasang Pintu Panyl Kayu Kanfer tb.3,5 cm
0.0400 m3 kayu kanfer 9,650,000.00 386,000.00
0.5000 kg lem 16,000.00 8,000.00
394,000.00
1.0000 OH pekerja 48,000.00 48,000.00
2.5000 OH tukang kayu 54,000.00 135,000.00
0.2500 OH kepala tukang 60,000.00 15,000.00
0.0500 OH mandor - -
198,000.00
592,000.00
KY.21.a 1.0000 m2 Rehab Pintu Panyl Kayu lama
0.5000 kg lem 16,000.00 8,000.00
8,000.00
1.0000 OH pekerja 48,000.00 48,000.00
2.5000 OH tukang kayu 54,000.00 135,000.00
0.2500 OH kepala tukang 60,000.00 15,000.00
0.0500 OH mandor - -
198,000.00
206,000.00
KY.23 1.0000 m2 Pasang Pintu & Jendela Kaca Kayu Kanfer tb.3 cm
0.0240 m3 kayu kanfer 9,650,000.00 231,600.00
0.3000 kg lem 16,000.00 4,800.00
236,400.00
0.8000 OH pekerja 48,000.00 38,400.00
2.0000 OH tukang kayu 54,000.00 108,000.00
0.2000 OH kepala tukang 60,000.00 12,000.00
0.0400 OH mandor - -
158,400.00
394,800.00
KY.23.a 1.0000 m2 Rehab Jendela Kaca Kayu lama
0.3000 kg lem 16,000.00 4,800.00
4,800.00
0.8000 OH pekerja 48,000.00 38,400.00
2.0000 OH tukang kayu 54,000.00 108,000.00
0.2000 OH kepala tukang 60,000.00 12,000.00
0.0400 OH mandor - -
158,400.00
163,200.00
KY.30 1.0000 m' Pasang Lisplank Uk. 3/20 Kayu bengkirai
0.0108 m3 kayu bengkirai 10,810,000.00 116,748.00
0.1000 kg paku 14,950.00 1,495.00
118,243.00
0.0100 OH pekerja 48,000.00 480.00
0.2000 OH tukang kayu 54,000.00 10,800.00
0.0250 OH kepala tukang 60,000.00 1,500.00
0.0050 OH mandor - -
12,780.00
131,023.00

KY.30.a 1.0000 m' Pasang kembali lisplank lama


0.1000 kg paku 14,950.00 1,495.00
1,495.00
0.0100 OH pekerja 48,000.00 480.00
0.2000 OH tukang kayu 54,000.00 10,800.00
0.0250 OH kepala tukang 60,000.00 1,500.00
0.0050 OH mandor - -
12,780.00
14,275.00
KY.32 1.0000 m' Pasang papan sirip
0.0050 m3 kayu kruing 8,570,000.00 42,850.00
0.0500 kg paku 14,950.00 747.50
43,597.50
0.1000 OH pekerja 48,000.00 4,800.00
0.1000 OH tukang kayu 54,000.00 5,400.00
0.0100 OH kepala tukang 60,000.00 600.00
0.0500 OH mandor - -
10,800.00
54,397.50

VII DT 91-0008 PEKERJAAN BETON


2007
B.1 1.0000 m3 Membuat beton tumbuk Mutu k.100 ( 1pc : 3.5ps : 4kr)
247.0000 kg Pc 1,520.00 375,440.00
0.6210 m3 pasir beton 241,000.00 149,661.00
0.7400 m3 batu pecah 1-2 204,690.00 151,470.60
NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL
UPAH
1 2 3 4 5 6 7 8=4x7 9
215.0000 ltr air 17.00 3,655.00
680,226.60
NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL
UPAH
1 2 3 4 5 6 7 8=4x7 9
1.6500 OH pekerja 48,000.00 79,200.00
0.2750 OH tukang batu 54,000.00 14,850.00
0.0280 OH kepala tukang 60,000.00 1,680.00
0.0830 OH mandor - -
95,730.00
775,956.60
B.2 1.0000 m3 Membuat beton Mutu k.175 ( 1 Pc : 2,5 Ps : 3 Kr )
326.0000 kg Pc 1,520.00 495,520.00
0.6514 m3 pasir beton 241,000.00 156,994.29
0.7622 m3 batu pecah 1-2 204,690.00 156,019.27
215.0000 ltr air 17.00 3,655.00
812,188.55
1.6500 OH pekerja 48,000.00 79,200.00
0.2500 OH tukang batu 54,000.00 13,500.00
0.0250 OH kepala tukang 60,000.00 1,500.00
0.0800 OH mandor - -
94,200.00
906,388.55
B.4 1.0000 m3 Membuat beton Mutu k.225 ( 1pc : 2ps : 3kr)
371.0000 kg Pc 1,520.00 563,920.00
0.5983 m3 pasir beton 241,000.00 144,186.86
0.7756 m3 batu pecah 1-2 204,690.00 158,748.47
215.0000 ltr air 17.00 3,655.00
870,510.32
1.6500 OH pekerja 48,000.00 79,200.00
0.2500 OH tukang batu 54,000.00 13,500.00
0.0250 OH kepala tukang 60,000.00 1,500.00
0.0800 OH mandor - -
94,200.00
964,710.32
B.7 1.0000 kg Pembesian dg Besi Polos atau Ulir
1.0500 kg besi beton 11,690.00 12,274.50
0.0150 kg kawat bindrat 19,300.00 289.50
12,564.00
0.0070 OH pekerja 48,000.00 336.00
0.0070 OH tukang besi 54,000.00 378.00
0.0007 OH kepala tukang 60,000.00 42.00
0.0004 OH mandor - -
756.00
13,320.00
B.8 1.0000 m' Kolom praktis (11 x 11 cm)
0.0020 m3 papan kayu randu 900,000.00 1,800.00
0.0100 kg paku 14,950.00 149.50
3.0000 kg besi beton 11,690.00 35,070.00
0.4500 kg kawat bindrat 19,300.00 8,685.00
4.0000 kg Pc 1,520.00 6,080.00
0.0060 m3 pasir beton 241,000.00 1,446.00
0.0090 m3 batu pecah 1-2 204,690.00 1,842.21
55,072.71
0.1800 OH pekerja 48,000.00 8,640.00
0.0200 OH tukang batu 54,000.00 1,080.00
0.0200 OH tukang kayu 54,000.00 1,080.00
0.0200 OH tukang besi 54,000.00 1,080.00
0.0060 OH kepala tukang 60,000.00 360.00
0.0090 OH mandor - -
12,240.00
67,312.71
B.9 1.0000 m' Sloof / ring balk beton bertulang (10 x 15 cm)
0.0030 m3 papan kayu randu 900,000.00 2,700.00
0.0200 kg paku 14,950.00 299.00
3.6000 kg besi beton 11,690.00 42,084.00
0.0500 kg kawat bindrat 19,300.00 965.00
5.5000 kg Pc 1,520.00 8,360.00
0.0090 m3 pasir beton 241,000.00 2,169.00
0.0150 m3 batu pecah 1-2 204,690.00 3,070.35
59,647.35
0.2970 OH pekerja 48,000.00 14,256.00
0.0330 OH tukang batu 54,000.00 1,782.00
0.0330 OH tukang kayu 54,000.00 1,782.00
0.0330 OH tukang besi 54,000.00 1,782.00
0.0100 OH kepala tukang 60,000.00 600.00
0.0150 OH mandor - -
20,202.00
79,849.35
B.10 1.0000 m2 Begisting untuk plat lantai
0.0400 m3 papan kayu randu 900,000.00 36,000.00
0.4000 kg paku 14,950.00 5,980.00
0.0150 m3 balok kayu 900,000.00 13,500.00
0.3500 lbr triplek 50,500.00 17,675.00
3.0000 btg bambu Ø 8-10 cm pj. 8 m 18,000.00 54,000.00
NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL
UPAH
1 2 3 4 5 6 7 8=4x7 9
127,155.00
NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL
UPAH
1 2 3 4 5 6 7 8=4x7 9
0.6600 OH pekerja 48,000.00 31,680.00
0.3300 OH tukang kayu 54,000.00 17,820.00
0.0330 OH kepala tukang 60,000.00 1,980.00
0.0330 OH mandor - -
51,480.00
178,635.00
B.11 1.0000 m2 Steiger dari bambu
0.4000 kg paku 14,950.00 5,980.00
0.0150 m3 balok kayu 900,000.00 13,500.00
2.0000 btg bambu Ø 8-10 cm pj. 8 m 18,000.00 36,000.00
55,480.00
0.2500 OH pekerja 48,000.00 12,000.00
0.1700 OH tukang kayu 54,000.00 9,180.00
0.0020 OH kepala tukang 60,000.00 120.00
0.0013 OH mandor - -
21,300.00
76,780.00
B.12 1.0000 m2 Cetakan beton (bekisting) dengan kayu randu tebal 2 cm
0.0220 m3 kayu randu tebal 2 cm 900,000.00 19,800.00
0.4000 kg paku 14,950.00 5,980.00
25,780.00
0.5000 OH tukang kayu 54,000.00 27,000.00
0.0500 OH tukang kepala 60,000.00 3,000.00
0.2000 OH pekerja 48,000.00 9,600.00
0.0100 OH mandor - -
39,600.00
65,380.00

VIII 03-3436-2002PEKERJAAN PENUTUP ATAP

PA.1 1.0000 m2 Pas atap genteng Jatiwangi tak berwarna kecil


0.0750 OH tukang kayu 54,000.00 4,050.00
0.0080 OH tukang kepala 60,000.00 480.00
0.1500 OH pekerja 48,000.00 7,200.00
0.0080 OH mandor - -
11,730.00
24.0000 bj genteng pres Jatiwangi kecil 1,900.00 45,600.00
57,330.00
PA.5 1.0000 m2 Pas atap genteng lokal
Upah tenaga 11,730.00
25.0000 bj genteng lokal 1,100.00 27,500.00
39,230.00

PA.5.a 1.0000 m2 Pasang kembali atap genteng lama


0.0750 OH tukang kayu 54,000.00 4,050.00
0.0080 OH tukang kepala 60,000.00 480.00
0.1500 OH pekerja 48,000.00 7,200.00
0.0080 OH mandor - -
11,730.00

11,730.00

PA.7 1.0000 m' Pas krepus Jatiwangi tak berwarna


0.2000 OH tukang batu 54,000.00 10,800.00
0.0200 OH tukang kepala 60,000.00 1,200.00
0.4000 OH pekerja 48,000.00 19,200.00
0.0020 OH mandor - -
31,200.00
8.0000 kg semen / PC 1,520.00 12,160.00
0.0320 m3 pasir 138,000.00 4,416.00
3.5000 bj krepus 15,600.00 54,600.00
71,176.00
102,376.00
PA.8 1.0000 m' Pas krepus lokal
Upah tenaga 31,200.00
3.6000 kg semen 1,520.00 5,472.00
0.0300 m3 pasir 138,000.00 4,140.00
3.5000 bj krepus Kudus/lokal 2,700.00 9,450.00
19,062.00
50,262.00
PA.13 1.0000 m2 Pasang Asbes Gelombang Besar (2,25x0,92x 5 mm)
0.5500 lbr asbes gelombang 108,500.00 59,675.00
0.1200 kg paku pancing 1,500.00 180.00
59,855.00
0.1400 OH pekerja 48,000.00 6,720.00
0.0750 OH tukang kayu 54,000.00 4,050.00
0.0080 OH kepala tukang 60,000.00 480.00
0.0080 OH mandor - -
11,250.00
NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL
UPAH
1 2 3 4 5 6 7 8=4x7 9
71,105.00
NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL
UPAH
1 2 3 4 5 6 7 8=4x7 9
PA.17 1.0000 m' Bubungan asbes gelombang
1.0000 m' bubungan asbes 68,750.00 68,750.00
4.0000 bj paku kait 1,500.00 6,000.00
0.2500 OH tukang kayu 54,000.00 13,500.00
0.0250 OH tukang kepala 60,000.00 1,500.00
0.2500 OH pekerja 48,000.00 12,000.00
0.0125 OH mandor - -
101,750.00

IX DT 91-0013 PEKERJAAN LANGIT-LANGIT


2007
LL.1 1.0000 m2 pasang pyan eternit kerang super
0.4000 OH tukang kayu 54,000.00 21,600.00
0.0400 OH tukang kepala 60,000.00 2,400.00
0.1400 OH pekerja 48,000.00 6,720.00
0.0070 OH mandor - -
30,720.00
0.2000 kg paku 14,950.00 2,990.00
0.0070 m3 kayu kruing 4/6 + 5/7 8,570,000.00 59,990.00
1.0000 m2 eternit kerang super 15,000.00 15,000.00
77,980.00
108,700.00
LL.2 1.0000 m2 Pasang pyan eternit atrisco dg rangka kayu baru
0.4000 OH tukang kayu 54,000.00 21,600.00
0.0400 OH tukang kepala 60,000.00 2,400.00
0.1400 OH pekerja 48,000.00 6,720.00
0.0070 OH mandor - -
30,720.00
0.2000 kg paku 14,950.00 2,990.00
0.0070 m3 kayu kruing 4/6 + 5/7 8,570,000.00 59,990.00
1.0000 m2 eternit atrisco 18,000.00 18,000.00
80,980.00
111,700.00
LL.2.a 1.0000 m2 Pasang pyan eternit atrisco dg rangka kayu lama
0.3000 OH tukang kayu 54,000.00 16,200.00
0.0300 OH tukang kepala 60,000.00 1,800.00
0.1050 OH pekerja 48,000.00 5,040.00
0.0053 OH mandor - -
23,040.00
0.2000 kg paku 14,950.00 2,990.00
1.0000 m2 eternit atrisco 18,000.00 18,000.00
20,990.00
44,030.00
LL.6 1.0000 m2 Pas. Plafond Kalsiboard (4,500 mm x 1200 mm x 2400 mm)
dan rangka besi holow 40 x40
5.000 m' Besi holow 40 x 40 10,250.00 51,250.00
0.364 Lbr Kalsiboard 80,000.00 29,120.00
0.110 Kg Paku sekrup 14,950.00 1,644.50
82,014.50
0.100 OH Pekerja 48,000.00 4,800.00
0.050 OH Tukang Kayu 54,000.00 2,700.00
0.005 OH Kepala Tukang 60,000.00 300.00
0.005 OH Mandor - -
7,800.00
89,814.50
LL.7 1.000 m1 Pasang List kayu profil

1.050 m1 List kayu profil 7,500.00 7,875.00


0.010 Kg Kompond 17,800.00 178.00
8,053.00
0.050 OH Pekerja 48,000.00 2,400.00
0.050 OH Tukang Kayu 54,000.00 2,700.00
0.005 OH Kepala Tukang 60,000.00 300.00
0.003 OH Mandor - -
5,400.00
13,453.00
NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL
UPAH
1 2 3 4 5 6 7 8=4x7 9
LL.8 1.000 m1 Pas. Listplank dg Kalsiplank atau sejenis

1.050 m1 Asbes kalsiplank 30,000.00 31,500.00


0.110 Kg Paku sekrup 14,950.00 1,644.50
33,144.50
0.050 OH Pekerja 48,000.00 2,400.00
0.100 OH Tukang Kayu 54,000.00 5,400.00
0.005 OH Kepala Tukang 60,000.00 300.00
0.003 OH Mandor - -
8,100.00
41,244.50
X DT 91-0014 PEKERJAAN BESI DAN ALUMINIUM
2007
BS.3 1.0000 m2 Pasang Roling Door tebal 5 mm
1.0000 m2 roling door 346,500.00 346,500.00
346,500.00
1.2000 OH pekerja 48,000.00 57,600.00
1.2000 OH tukang besi 54,000.00 64,800.00
0.1200 OH kepala tukang 60,000.00 7,200.00
0.0060 OH mandor - -
129,600.00
476,100.00
BS.3.a 1.0000 m2 Pasang Folding Door tebal 5 mm
1.0000 m2 Folding door 400,000.00 400,000.00
400,000.00
1.2000 OH pekerja 48,000.00 57,600.00
1.2000 OH tukang besi 54,000.00 64,800.00
0.1200 OH kepala tukang 60,000.00 7,200.00
0.0060 OH mandor - -
129,600.00
529,600.00
BS.5 1.0000 m1 Pasang kusen alumunium
1.1000 m1 profil alumunium 104,900.00 115,390.00
2.0000 bh skrup fizzer 1,100.00 2,200.00
0.0600 tube sealent 28,000.00 1,680.00
115,390.00
0.0430 OH pekerja 48,000.00 2,064.00
0.0430 OH tukang besi 54,000.00 2,322.00
0.0043 OH kepala tukang 60,000.00 258.00
0.0021 OH mandor - -
4,644.00
120,034.00
BS.6 1.0000 m2 Pasang pintu alumunium
4.4000 m1 profil alumunium 104,900.00 461,560.00
14.6000 Alumunium strip 35,000.00 511,000.00
461,560.00
0.0850 OH pekerja 48,000.00 4,080.00
0.0850 OH tukang besi 54,000.00 4,590.00
0.0085 OH kepala tukang 60,000.00 510.00
0.0050 OH mandor - -
9,180.00
470,740.00
BS.9 1.0000 m' Pasang Talang Miring Seng BJLS 28
0.5000 lbr seng plat BJLS 28 43,750.00 21,875.00
0.0150 kg paku 14,950.00 224.25
0.0190 m3 kayu kruing 8,570,000.00 162,830.00
184,929.25
0.2000 OH pekerja 48,000.00 9,600.00
0.4000 OH tukang kayu 54,000.00 21,600.00
0.0250 OH kepala tukang 60,000.00 1,500.00
0.0013 OH mandor - -
32,700.00
217,629.25
BS.10 1.0000 kg Baut-baut / angkur
1.1000 kg baut baja 17,160.00 18,876.00
0.0900 OH tukang besi 54,000.00 4,860.00
0.0300 OH tukang kepala 60,000.00 1,800.00
0.0900 OH pekerja 48,000.00 4,320.00
29,856.00
BS.11 1.0000 m' Pasang Talang Gantung 15 cm
0.2500 lbr seng plat BJLS 28 43,750.00 10,937.50
0.0100 kg paku 14,950.00 149.50
0.6500 m1 besi strip 20,600.00 13,390.00
24,477.00
0.1500 OH pekerja 48,000.00 7,200.00
0.3000 OH tukang besi 54,000.00 16,200.00
0.0300 OH kepala tukang 60,000.00 1,800.00
0.0080 OH mandor - -
25,200.00
NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL
UPAH
1 2 3 4 5 6 7 8=4x7 9
49,677.00
NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL
UPAH
1 2 3 4 5 6 7 8=4x7 9
XI 03- PEKERJAAN KUNCI DAN KACA

KK.1 1.0000 bh Pasang Kunci Tanam Biasa


1.0000 bh kunci tanam biasa 122,500.00 122,500.00
122,500.00
0.0100 OH pekerja 48,000.00 480.00
0.5000 OH tukang kayu 54,000.00 27,000.00
0.0100 OH kepala tukang 60,000.00 600.00
0.0050 OH mandor - -
28,080.00
150,580.00
KK.3 1.0000 bh Pasang Engsel Pintu
1.0000 bh engsel pintu 23,500.00 23,500.00
23,500.00
0.0150 OH pekerja 48,000.00 720.00
0.1500 OH tukang kayu 54,000.00 8,100.00
0.0150 OH kepala tukang 60,000.00 900.00
0.0008 OH mandor - -
9,720.00
33,220.00
KK.4 1.0000 set Pasang Engsel Jendela Kupu-Kupu
1.0000 set engsel jendela 12,000.00 12,000.00
12,000.00
0.0100 OH pekerja 48,000.00 480.00
0.1000 OH tukang kayu 54,000.00 5,400.00
0.0100 OH kepala tukang 60,000.00 600.00
0.0050 OH mandor - -
6,480.00
18,480.00
KK.6 1.0000 bh Pasang Kait Angin
1.0000 bh kait angin 5,000.00 5,000.00
5,000.00
0.0150 OH pekerja 48,000.00 720.00
0.1500 OH tukang kayu 54,000.00 8,100.00
0.0150 OH kepala tukang 60,000.00 900.00
0.0008 OH mandor - -
9,720.00
14,720.00
KK.8 1.0000 bh Pasang Kunci Sloot
1.0000 bh kunci sloot 5,500.00 5,500.00
5,500.00
0.0200 OH pekerja 48,000.00 960.00
0.2000 OH tukang kayu 54,000.00 10,800.00
0.0200 OH kepala tukang 60,000.00 1,200.00
0.0010 OH mandor - -
12,960.00
18,460.00
KK.9 1.0000 bh Pasang Rel Pintu Dorong
1.0000 bh rel pintu dorong 198,000.00 198,000.00
198,000.00
0.0600 OH pekerja 48,000.00 2,880.00
0.6000 OH tukang kayu 54,000.00 32,400.00
0.0600 OH kepala tukang 60,000.00 3,600.00
0.0030 OH mandor - -
38,880.00
236,880.00
KK.11 1.0000 m2 Pasang Kaca tb. 5 mm
1.1000 bh kaca 5 mm 73,000.00 80,300.00
80,300.00
0.0150 OH pekerja 48,000.00 720.00
0.1500 OH tukang kayu 54,000.00 8,100.00
0.0150 OH kepala tukang 60,000.00 900.00
0.0008 OH mandor - -
9,720.00
90,020.00
KK.12 1.0000 m2 Pasang handle jendela
1.0000 bh handle jendela 6,500.00 6,500.00
6,500.00
0.0100 OH pekerja 48,000.00 480.00
0.1000 OH tukang kayu 54,000.00 5,400.00
0.0100 OH kepala tukang 60,000.00 600.00
0.0050 OH mandor - -
6,480.00
12,980.00

XII DT 91-0012 PEKERJAAN PENUTUP LANTAI DAN DINDING


2007
L.1 1.0000 m2 Pasang Lantai Keramik uk. 40x40 Putih
6.6300 bh keramik 40/40 8,600.00 57,018.00
9.8000 kg pc 1,520.00 14,896.00
0.0450 m3 pasir pasang 138,000.00 6,210.00
NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL
UPAH
1 2 3 4 5 6 7 8=4x7 9
1.3000 kg semen warna 11,250.00 14,625.00
92,749.00
NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL
UPAH
1 2 3 4 5 6 7 8=4x7 9
0.2500 OH pekerja 48,000.00 12,000.00
0.1250 OH tukang batu 54,000.00 6,750.00
0.0125 OH kepala tukang 60,000.00 750.00
0.0125 OH mandor - -
19,500.00
112,249.00
L.2 1.0000 m2 Pasang Lantai Keramik uk. 40x40 Warna
6.6300 bh keramik 40/40 10,200.00 67,626.00
9.8000 kg pc 1,520.00 14,896.00
0.0450 m3 pasir pasang 138,000.00 6,210.00
1.3000 kg semen warna 11,250.00 14,625.00
103,357.00
0.2500 OH pekerja 48,000.00 12,000.00
0.1200 OH tukang batu 54,000.00 6,480.00
0.0120 OH kepala tukang 60,000.00 720.00
0.0125 OH mandor - -
19,200.00
122,557.00
L.4 1.0000 m2 Pasang Lantai Keramik 20x20
26.5000 bh keramik 20/20 2,100.00 55,650.00
10.4000 kg pc 1,520.00 15,808.00
0.0450 m3 pasir pasang 138,000.00 6,210.00
1.6200 kg semen warna 11,250.00 18,225.00
95,893.00
0.2500 OH pekerja 48,000.00 12,000.00
0.1200 OH tukang batu 54,000.00 6,480.00
0.0120 OH kepala tukang 60,000.00 720.00
0.0125 OH mandor - -
19,200.00
115,093.00
L.5 1.0000 m2 Pasang Lantai Keramik 30x30 warna
11.8700 bh keramik warna 30/30 4,800.00 56,976.00
10.0000 kg pc 1,520.00 15,200.00
0.0450 m3 pasir pasang 138,000.00 6,210.00
1.5000 kg semen warna 11,250.00 16,875.00
95,261.00
0.2600 OH pekerja 48,000.00 12,480.00
0.1300 OH tukang batu 54,000.00 7,020.00
0.0130 OH kepala tukang 60,000.00 780.00
0.0130 OH mandor - -
20,280.00
115,541.00
L.6 1.0000 m2 Pasang Lantai Keramik 30x30 Putih
11.8700 bh keramik putih 30/30 4,300.00 51,041.00
10.0000 kg pc 1,520.00 15,200.00
0.0450 m3 pasir pasang 138,000.00 6,210.00
1.5000 kg semen warna 11,250.00 16,875.00
89,326.00
0.2600 OH pekerja 48,000.00 12,480.00
0.1300 OH tukang batu 54,000.00 7,020.00
0.0130 OH kepala tukang 60,000.00 780.00
0.0130 OH mandor - -
20,280.00
109,606.00
L.8 1.0000 m2 Pasang Dinding Keramik 20x20
26.5000 bh keramik 20/20 2,100.00 55,650.00
9.3000 kg pc 1,520.00 14,136.00
0.0180 m3 pasir pasang 138,000.00 2,484.00
1.9400 kg semen warna 11,250.00 21,825.00
94,095.00
0.9000 OH pekerja 48,000.00 43,200.00
0.4500 OH tukang batu 54,000.00 24,300.00
0.0450 OH kepala tukang 60,000.00 2,700.00
0.0450 OH mandor - -
70,200.00
164,295.00
L.12 1.0000 m2 pasang blok pafing tebal 6 cm K.125
0.0050 m3 pasir muntilan utk nat 241,000.00 1,205.00
1.0000 m2 pafing 41,900.00 41,900.00
43,105.00
0.1500 OH tukang batu 54,000.00 8,100.00
0.0150 OH tukang kepala 60,000.00 900.00
0.5000 OH pekerja 48,000.00 24,000.00
0.0250 OH mandor - -
33,000.00
76,105.00
L.14 1.0000 m2 Pasang blok paving tebal 6 cm dengan paving mutu K 225
0.0050 m3 pasir muntilan utk nat 241,000.00 1,205.00
NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL
UPAH
1 2 3 4 5 6 7 8=4x7 9
1.0000 m2 paving K 225 72,000.00 72,000.00
73,205.00
0.1500 OH tukang batu 54,000.00 8,100.00
0.0150 OH tukang kepala 60,000.00 900.00
0.5000 OH pekerja 48,000.00 24,000.00
0.0250 OH mandor - -
33,000.00
106,205.00
L.18 1.0000 m3 perekat portland 1 : 2
580.6000 kg semen / PC 1,520.00 882,512.00
0.9500 m3 pasir 138,000.00 131,100.00
1,013,612.00
L.20 1.0000 m' pasang saluran U-20 cm
1.0000 m' Buis beton U-20 cm 43,000.00 43,000.00
0.8000 m2 Pasang batu bata 1:3 96,882.40 77,505.92
0.5000 m2 Plesteran 1:3 43,757.20 21,878.60
0.0200 m3 Hurugan pasir 119,280.00 2,385.60
Ongkos pasang Buis U-20 4,000.00 4,000.00
148,770.12
XIII 03- -2002 PEKERJAAN PENGECATAN

C.1 1.0000 m2 mengecat kayu 3 x


0.2600 kg cat 50,500.00 13,130.00
0.1740 ltr afduner 11,970.00 2,082.78
0.0600 kg plamur 14,600.00 876.00
0.0750 kg meni 28,200.00 2,115.00
0.2000 lbr amplas 12,240.00 2,448.00
20,651.78
0.0750 OH tukang cat 54,000.00 4,050.00
0.0075 OH tukang kepala 60,000.00 450.00
0.0500 OH pekerja 48,000.00 2,400.00
0.0025 OH mandor - -
6,900.00
27,551.78
C.2 1.0000 m2 mengecat kayu 2 x
0.1730 kg cat 50,500.00 8,736.50
0.1160 ltr afduner 11,970.00 1,388.52
0.0400 kg plamur 14,600.00 584.00
0.2000 lbr amplas 12,240.00 2,448.00
13,157.02
0.0500 OH tukang cat 54,000.00 2,700.00
0.0050 OH tukang kepala 60,000.00 300.00
0.0330 OH pekerja 48,000.00 1,584.00
0.0016 OH mandor - -
4,584.00
17,741.02
C.5 1.0000 m2 mengecat besi 3 x
0.2600 kg cat 52,660.00 13,691.60
0.1740 ltr afduner 11,970.00 2,082.78
0.0750 kg meni 28,200.00 2,115.00
0.2000 lbr amplas 12,240.00 2,448.00
20,337.38
0.0750 OH tukang cat 54,000.00 4,050.00
0.0075 OH tukang kepala 60,000.00 450.00
0.0500 OH pekerja 48,000.00 2,400.00
0.0025 OH mandor - -
6,900.00
27,237.38
C.6 1.0000 m2 mengecat tembok dg Mowilex utk dalam ruangan
0.2000 kg cat tembok Mowilex 56,800.00 11,360.00
0.2250 kg plamur 14,600.00 3,285.00
0.2500 lbr amplas 12,240.00 3,060.00
0.0750 OH tukang cat 54,000.00 4,050.00
0.0075 OH tukang kepala 60,000.00 450.00
0.0500 OH pekerja 48,000.00 2,400.00
0.0025 OH mandor - -
24,605.00
C.7 1.0000 m2 mengecat tembok dg Mowilex utk luar ruangan
0.3500 kg cat tembok Mowilex 87,600.00 30,660.00
0.2250 kg plamur 14,600.00 3,285.00
0.2500 lbr amplas 12,240.00 3,060.00
0.0750 OH tukang cat 54,000.00 4,050.00
0.0075 OH tukang kepala 60,000.00 450.00
0.0500 OH pekerja 48,000.00 2,400.00
0.0025 OH mandor - -
43,905.00
NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL
UPAH
1 2 3 4 5 6 7 8=4x7 9
C.11 1.0000 m2 mengecat tembok dg Decolith
0.3000 kg cat tembok Decolith 18,000.00 5,400.00
0.2250 kg plamur 14,600.00 3,285.00
0.2500 lbr amplas 12,240.00 3,060.00
0.0750 OH tukang cat 54,000.00 4,050.00
0.0075 OH tukang kepala 60,000.00 450.00
0.0500 OH pekerja 48,000.00 2,400.00
0.0025 OH mandor - -
18,645.00

C.12 1.0000 m2 cat tembok ulang 1/2 x C.6 9,322.50


DAFTAR HARGA SATUAN PEKERJAAN KONSTRUKSI
KABUPATEN JEPARA
TAHUN ANGGARAN 2013

KODE HARGA SATUAN


NO URAIAN PEKERJAAN SATUAN KETERANGAN
ANALISA PEKERJAAN

I PEKERJAAN PERSIAPAN (03-2835-2002)


1 Pengukuran dan Pemasangan Bouwplank 1 m' PS. 1 Rp 69,899.00
2 Membersihkan Lapangan dan Peralatan 1 m2 PS. 2 Rp 4,800.00
3 Bongkar Beton Bertulang 1 m3 PS. 3 Rp 320,016.00
4 Membongkar dinding bata merah 1 m3 PS. 4 Rp 320,016.00
5 Mengupas plesteran 1 m2 PS. 5 Rp. Rp 2,400.00
6 Membongkar usuk dan reng 1 m2 PS. 6 Rp. Rp 3,900.00
7 Membongkar kuda-kuda 1 m3 PS. 7 Rp. Rp 552,000.00
8 Membongkar plafond eternit 1 m2 PS. 8 Rp. Rp 12,000.00
9 Mengupas permukaan aspal 1 m2 PS. 9 Rp 48,000.00
10 Membuat Andang Dari Bambu 1 m2 PS. 10 Rp 43,037.50

II PEKERJAAN TANAH (03-2835-1992)


1 Galian Tanah Biasa Sedalam 1 m 1 m3 T.1 Rp. Rp 31,500.00
2 Urugan tanah biasa dipadatkan 1 m3 T.10 Rp 62,936.80
3 Urugan Kembali 1 m3 T.13 Rp 10,500.00
4 Urugan Pasir Hurug 1 m3 T.14 Rp 119,280.00
5 Urugan Sirtu padat 1 m3 T.15 Rp 150,000.00

III PEKERJAAN PONDASI (03-2836-2002)


1 Pasang anstampeng batu belah 1 m3 Pd.1 Rp. Rp 238,204.80
2 Pasang Pondasi Batu Kali 1Pc : 8 Ps dengan pasir lokal 1 m3 Pd.3 Rp. Rp 495,932.00
3 Pasang Pondasi Batu Kali 1Pc : 8 Ps dengan pasir Beton 1 m3 Pd.4 Rp. Rp 556,084.00
4 Pasang pondasi rolag tashraam batu merah 1:3 1 m3 Pd.9 Rp. Rp 888,660.00

IV PEKERJAAN DINDING (03-2837-2002)


1 Pasangan Batu Merah Kali Pucang Tebal 1 bata, 1Pc : 4 Ps pasir lokal 1 m2 D.1 Rp 183,990.00
2 Pasangan Batu Merah Kali Pucang Tebal 1 bata, 1Pc : 4 Ps pasir beton 1 m2 D.2 Rp 193,569.00
3 Pasangan Batu Merah Kali Pucang Tebal 1/2 bata, 1Pc : 3 Ps pasir lokal 1 m2 D.3 Rp 92,762.40
4 Pasangan Batu Merah Kali Pucang Tebal 1/2 bata, 1Pc : 3 Ps pasir beton 1 m2 D.4 Rp 96,882.40
5 Pasangan Batu Merah Kali PucangTebal 1/2 bata, 1Pc : 8 Ps pasir lokal 1 m2 D.5 Rp 82,180.00
6 Pasangan Batu Merah Kali PucangTebal 1/2 bata, 1Pc : 8 Ps pasir beton 1 m2 D.6 Rp 87,330.00

V PEKERJAAN PLESTERAN (03-2837-2002)


1 Plesteran 1 Pc : 3 Ps pasir lokal 1 m2 PL.1 Rp. Rp 43,757.20
2 Plesteran 1 Pc : 3 Ps pasir beton 1 m2 PL.2 Rp. Rp 45,755.40
3 Plesteran 1 Pc : 8 Ps di aci PC pasir lokal 1 m2 PL.3 Rp. Rp 38,186.72
4 Plesteran 1 Pc : 8 Ps di aci PC pasir beton 1 m2 PL.4 Rp. Rp 41,070.72
5 Plester Siar Adukan 1 Pc : 2 Ps 1 m2 PL.5 Rp. Rp 29,892.80
6 Plesteran Beton 1 Pc : 2 Ps Tebal 15 mm pasir beton 1 m2 PL.6 Rp 37,074.00

VI PEKERJAAN KAYU ( 03-3434-2002 )


1 Pasang gantungan pyan 1 m3 KY.1 Rp. Rp 10,569,242.50
2 Pasang gantungan pyan dengan kayu lama 1 m3 KY.1.a Rp. Rp 1,142,242.50
3 Pasang Kusen Pintu dan Jendela kayu Bengkirai 1 m3 KY.2 Rp 14,494,687.50
4 Pasang Kusen kusen dengan kayu lama 1 m3 KY.2.a Rp 1,522,687.50
5 Pasang Kasau & Reng Kayu kruing 1 m2 KY.7 Rp 115,882.50
6 Pasang Kasau kayu lama & Reng baru Kayu Kruing 1 m2 KY.7.a Rp 54,178.50
7 Pasang Kasau & Reng Kayu bengkirai 1 m2 KY.8 Rp 142,762.50
8 Pasang Konstruksi Kuda-Kuda Kayu bengkirai 1 m3 KY.11 Rp 13,144,120.00
9 Pasang Konstruksi Kuda-Kuda Kayu kruing 1 m3 KY.12 Rp 10,680,120.00
10 Pasang Konstruksi Kuda-Kuda dg Kayu lama 1 m3 KY.12.a Rp 995,760.00
11 Pasang Jalusi mati Kosen Kayu Bengkirai 1 m2 KY.15 Rp 794,842.50
12 Bikin daun pintu rangka kayu bengkirai tb 3,5 cm panil multiplek tb 9 mm 1 m2 KY.18 Rp. Rp 755,587.50
13 Pasang Pintu Panyl Kayu Kanfer tb.3,5 cm 1 m2 KY.21 Rp. Rp 592,000.00
14 Rehab Pintu Panyl Kayu lama 1 m2 KY.21.a Rp. Rp 206,000.00
15 Pasang Pintu & Jendela Kaca Kayu Kanfer tb.3 cm 1 m2 KY.23 Rp 394,800.00
16 Rehab Jendela Kaca Kayu lama 1 m2 KY.23.a Rp 163,200.00
17 Pasang Lisplank Uk. 3/20 Kayu bengkirai 1m' KY.30 Rp 131,023.00
18 Pasang kembali lisplank lama 1m' KY.30.a Rp 14,275.00
19 Pasang papan sirip 1m' KY.32 Rp 54,397.50
KODE HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
ANALISA PEKERJAAN
KODE HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
ANALISA PEKERJAAN

VII PEKERJAAN BETON ( 03-3435-2002 )


1 Membuat beton tumbuk Mutu k.100 ( 1pc : 3.5ps : 4kr) 1 m3 B.1 Rp 775,956.60
2 Membuat beton Mutu k.175 ( 1 Pc : 2,5 Ps : 3 Kr ) 1 m3 B.2 Rp 906,388.55
3 Membuat beton Mutu k.225 ( 1pc : 2ps : 3kr) 1 m3 B.4 Rp 964,710.32
4 Pembesian dg Besi Polos atau Ulir 1 kg B.7 Rp 13,320.00
5 Kolom praktis (11 x 11 cm) 1 m' B.8 Rp 67,312.71
6 Sloof / ring balk beton bertulang (10 x 15 cm) 1 m' B.9 Rp 79,849.35
7 Begisting untuk plat lantai 1 m2 B.10 Rp 178,635.00
8 Steiger dari bambu 1 m2 B.11 Rp 76,780.00
9 Cetakan beton (bekisting) dengan kayu randu tebal 2 cm 1 m2 B.12 Rp 65,380.00

VIII PEKERJAAN PENUTUP ATAP (03-3436-2002)


1 Pas atap genteng Jatiwangi tak berwarna kecil 1 m2 PA.1 Rp. Rp 57,330.00
2 Pasang atap genteng lokal 1 m2 PA.5 Rp. Rp 39,230.00
3 Pasang kembali atap genteng lama 1 m2 PA.5.a Rp. Rp 11,730.00
4 Pas krepus Jatiwangi tak berwarna 1 m2 PA.7 Rp. Rp 102,376.00
5 Pasang krepus lokal 1 m' PA.8 Rp. Rp 50,262.00
6 Pasang Asbes Gelombang Besar (2,25x0,92x 5 mm) 1 m2 PA.13 Rp. Rp 71,105.00
7 Bubungan asbes gelombang 1 m' PA.17 Rp. Rp 101,750.00

IX PEKERJAAN LANGIT-LANGIT ( 03-2838-2002 )


1 pasang pyan eternit kerang super 1 m2 LL.1 Rp. Rp 108,700.00
2 Pasang pyan eternit atrisco dg rangka kayu baru 1 m2 LL.2 Rp. Rp 111,700.00
2 Pasang pyan eternit atrisco dg rangka kayu lama 1 m2 LL.2.a Rp. Rp 44,030.00
3 Pas. Plafond Kalsiboard (4,500 mm x 1200 mm x 2400 mm) 1 m2 LL.6 Rp. Rp 89,814.50
dan rangka besi holow 40 x40
4 Pasang List kayu profil 1 m' LL.7 Rp. Rp 13,453.00
5 Pas. Listplank dg Kalsiplank atau sejenis 1 m' LL.8 Rp. Rp 41,244.50

X PEKERJAAN BESI DAN ALUMINIUM


1 Pasang Roling Door tebal 5 mm 1 m2 BS.3 Rp 476,100.00
2 Pasang Folding Door tebal 5 mm 1 m2 BS.3.a Rp 529,600.00
3 Pasang kusen alumunium 1 m' BS.5 Rp 120,034.00
4 Pasang pintu alumunium 1 m2 BS.6 Rp 470,740.00
5 Pasang Talang Miring Seng BJLS 28 1 m2 BS.9 Rp 217,629.25
6 Baut angkur 1 kg BS.10 Rp. Rp 29,856.00
7 Pasang Talang Gantung 15 cm 1 kg BS.11 Rp. Rp 49,677.00

XI PEKERJAAN KUNCI DAN KACA


1 Pasang Kunci Tanam Biasa bh KK.1 Rp 150,580.00
2 Pasang Engsel Pintu bh KK.3 Rp 33,220.00
3 Pasang Engsel Jendela Kupu-Kupu set KK.4 Rp 18,480.00
4 Pasang Kait Angin bh KK.6 Rp 14,720.00
5 Pasang Kunci Sloot bh KK.8 Rp 18,460.00
6 Pasang Rel Pintu Dorong bh KK.9 Rp 236,880.00
7 Pasang Kaca tb. 5 mm 1 m2 KK.11 Rp 90,020.00
8 Pasang handle jendela bh KK.12 Rp 12,980.00

XII PEKERJAAN PENUTUP LANTAI DAN DINDING


1 Pasang Lantai Keramik uk. 40x40 Putih 1 m2 L.1 Rp 112,249.00
2 Pasang Lantai Keramik uk. 40x40 Warna 1 m2 L.2 Rp 122,557.00
3 Pasang Lantai Keramik 20x20 1 m2 L.4 Rp 115,093.00
4 Pasang Lantai Keramik 30x30 warna 1 m2 L.5 Rp 115,541.00
5 Pasang Lantai Keramik 30x30 Putih 1 m2 L.6 Rp 109,606.00
6 Pasang Dinding Keramik 20x20 1 m2 L.8 Rp 164,295.00
7 pasang blok pafing tebal 6 cm K.125 1 m2 L.12 Rp 76,105.00
8 Pasang blok paving tebal 6 cm dengan paving mutu K 225 1 m2 L.14 Rp 106,205.00
7 Perekat portland 1 : 2 1 m3 L.18 Rp 1,013,612.00
8 pasang saluran U-20 cm 1 m' L.20 Rp. Rp 148,770.12
KODE HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
ANALISA PEKERJAAN

XIII PEKERJAAN PENGECATAN


1 Mengecat kayu 3 kali 1 m2 C.1 Rp. Rp 27,551.78
2 mengecat kayu 2 x 1 m2 C.2 Rp 17,741.02
3 mengecat besi 3 x 1 m2 C.5 Rp 27,237.38
4 mengecat tembok dg Mowilex utk dalam ruangan 1 m2 C.6 Rp 24,605.00
5 mengecat tembok dg Mowilex utk luar ruangan 1 m2 C.7 Rp 43,905.00
6 Mengecat tembok dg Decolit 1 m2 C.11 Rp. Rp 18,645.00
7 cat tembok ulang 1/2 x C.6 1 m2 C.12 Rp. Rp 9,322.50
RENCANA ANGGARAN BIAYA

PEKERJAAN : Membuat septictank dengan ukuran gambar standart

VOLUME ANALIS HARGA SATUAN


NO URAIAN PEKERJAAN SAT. JUMLAH (Rp)
RENCANA A (Rp)

a b c d e f g

I PEKERJAAN TANAH
1 Galian tanah 10.616 m3 T.1 31,500.00 334,404.00
2 Urugan pasir untuk peresapan 0.200 m3 T.14 119,280.00 23,856.00
4 Urugan ijuk untuk peresapan 1.000 pek. taksir 125,000.00 125,000.00
4 Urugan kerikil halus untuk peresapan 1.000 m3 taksir 95,000.00 95,000.00
5 Urugan kerikil kasar untuk peresapan 1.000 m 3
taksir 90,000.00 90,000.00
SUB TOTAL I : 668,260.00
II PEKERJAAN PONDASI
1 Pas. Pondasi rolag trashraam bata merah 1 Pc : 3 Ps 3.705 m3 Pd.9 888,660.00 3,292,485.30
SUB TOTAL II : 3,292,485.30
III PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 3 Ps tebal 15 mm di aci 13.760 m2 PL.1 43,757.20 602,099.07
SUB TOTAL III : 602,099.07
IV PEKERJAAN BETON
1 Cor beton rabat K.175 penutup 0.299 m3 B.2 906,388.55 270,828.90
2 Pembesian 27.654 kg B.7 13,320.00 368,350.48
3 Begisting 0.592 m2 B.12 65,380.00 38,704.96
SUB TOTAL IV : 677,884.34
V PEKERJAAN SANITASI
1 Pasang pipa PVC 2" AW 1.500 m1 taksir 25,865.00 38,797.50
SUB TOTAL V : 38,797.50

JUMLAH HARGA TOTAL 5,279,526.21


DAFTAR ANALISA BIAYA SATUAN PEKERJAAN

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL
UPAH
1 2 3 4 5 6 7 8=4x7 9

I PEKERJAAN SANITASI
Di Hit. 1 1.0000 m' Memasang pralon PVC 3/4" AW
1.0000 m' Pralon PVC 3/4" AW 6,500.00 6,500.00
0.1000 set perlengkapan + asesories 6,500.00 650.00
7,150.00
0.0100 OH pekerja 28,500.00 285.00
0.1000 OH tukang batu 54,000.00 5,400.00
0.0100 OH kepala tukang 60,000.00 600.00
0.0050 OH mandor - -
6,285.00
13,435.00
Di Hit. 2 1.0000 m' Memasang pralon PVC 2" AW
1.0000 m' Pralon PVC 2" AW 17,800.00 17,800.00
0.1000 set perlengkapan + asesories 17,800.00 1,780.00
19,580.00
0.0100 OH pekerja 28,500.00 285.00
0.1000 OH tukang batu 54,000.00 5,400.00
0.0100 OH kepala tukang 60,000.00 600.00
0.0050 OH mandor - -
6,285.00
25,865.00
Di Hit. 3 1.0000 m' Memasang pralon PVC 3" AW
1.0000 m' Pralon PVC 3" AW 36,000.00 36,000.00
0.1000 set perlengkapan + asesories 36,000.00 3,600.00
39,600.00
0.0100 OH pekerja 28,500.00 285.00
0.1000 OH tukang batu 54,000.00 5,400.00
0.0100 OH kepala tukang 60,000.00 600.00
0.0050 OH mandor - -
6,285.00
45,885.00
Di Hit. 4 1.0000 m' Memasang pralon PVC 4" AW
1.0000 m' Pralon PVC 4" AW 54,000.00 54,000.00
0.1000 set perlengkapan + asesories 54,000.00 5,400.00
59,400.00
0.0100 OH pekerja 28,500.00 285.00
0.1000 OH tukang batu 54,000.00 5,400.00
0.0100 OH kepala tukang 60,000.00 600.00
0.0050 OH mandor - -
6,285.00
65,685.00
Di Hit. 5 1.0000 m' Memasang kran stainlesteel
1.0000 m' Kran stainlesteel 47,000.00 47,000.00
0.1000 set perlengkapan + asesories 47,000.00 4,700.00
51,700.00
0.0100 OH pekerja 28,500.00 285.00
0.0500 OH tukang batu 54,000.00 2,700.00
0.0100 OH kepala tukang 60,000.00 600.00
0.0050 OH mandor - -
3,585.00
55,285.00

Di Hit. 6 Membuat sumur gali untuk air bersih


1.0000 m3 Galian Tanah cadas Sedalam 1 m
1.5000 OH pekerja 42,000.00 63,000.00
0.0600 OH mandor - -
63,000.00

Membuat sumur sedalam 15 m dengan diameter 1 m

11.7750 m3 galian tanah 63,000.00 741,825.00


0.7500 set perlengkapan + asesories 741,825.00 556,368.75
1,298,193.75

Membuat tutup sumur dengan cor beton bertulang

0.1200 m3 Membuat beton bertulang penutup sumur Mutu k.175 ( 1 Pc : 2,5 Ps : 3 Kr )


39.1200 kg Pc 1,520.00 59,462.40
0.0782 m3 pasir beton 241,000.00 18,839.31
NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL
UPAH
1 2 3 4 5 6 7 8=4x7 9
0.0915 m3 batu pecah 1-2 204,690.00 18,722.31
24.0000 kg besi beton 11,690.00 280,560.00
0.3600 kg kawat bindrat 19,300.00 6,948.00
25.8000 ltr air 17.00 438.60
384,970.63
0.1980 OH pekerja 48,000.00 9,504.00
0.0300 OH tukang batu 54,000.00 1,620.00
0.0030 OH kepala tukang 60,000.00 180.00
0.0096 OH mandor - -
11,304.00
396,274.63

Total biaya pembuatan sumur gali air bersih 1,694,468.38

Di Hit. 7 1.0000 set Memasang pompa air sekualitas merk National Type GP-125 jb atau Panasonic GP 129JXK
Mesin pompa air National Type GP-125 jb daya hisap 9 - 10 m
dengan spesifikasi
- Model : GP 125
- Motor : induksi / 1 phase
- Sumber daya : 220 V / 50 Hz
- Pemakaian daya (output) : 125 W
- Pemakaian arus : 1,55 Ampere
- Kutub : 2 buah
- Daya hisap : 9 m
- Total head maks : 30 m
- Kapasitas air maks : 35 ltr/menit
- Pipa hisap / dorong : 1 Inci
- Berat bersih : 7,5 kg
- Pressure switch on-of : 1,1 - 1,8 kgf/cm2
- Ukuran (mm) : 256 x 206 x 238
kisaran harga pasar internet Rp. 350.000 belum pajak

Mesin pompa air merk Panasonic type GP 129JXK daya hisap 9 - 10 m


dengan spesifikasi
- Model : GP129JXK
- Motor : induksi / 1 phase
- Sumber daya : 220 V / 50 Hz
- Pemakaian daya listrik (output) : 125 W
- Pemakaian arus : 1,55 Ampere
- Kutub : 2 buah
- Daya hisap : 9 m
- Total head maks (daya dorong) : 30 m
- Kapasitas air maks : 30 ltr/menit atau 16 ltr/mnt (head:12m)
- Pipa hisap / dorong : 1 Inci
- Berat kirim : 8,5 kg
- Pressure switch on-of : 1,1 - 1,8 kgf/cm2
- Ukuran (mm) : 206 x 152 x 212
kisaran harga pasar internet Rp. 325.000 belum pajak

1.1000 bh Mesin pompa air 350,000.00 385,000.00


4.0000 m' Pralon PVC 1" 8,300.00 33,200.00
16.0000 m' Pralon PVC 3/4" 6,500.00 104,000.00
0.2000 set perlengkapan + asesories 350,000.00 70,000.00
16.0000 m' kabel listrik 5,000.00 80,000.00
16.0000 m' tambang plastik 4,500.00 72,000.00
744,200.00
2.0000 OH pekerja 28,500.00 57,000.00
2.0000 OH tukang pipa 60,000.00 120,000.00
1.0000 OH mandor pipa - -
177,000.00
921,200.00

Di Hit. 8 1.0000 set Memasang tangki air dan perlengkapannya

dengan spesifikasi
- Kapasitas air maks : 225 ltr
- Ukuran (mm) :
- kisaran harga pasar internet Rp. 420.000 belum pajak

- Kapasitas air maks : 300 ltr


- Ukuran (mm) :
- kisaran harga pasar internet Rp. 480.000 belum pajak

- Kapasitas air maks : 520 ltr


- Ukuran (mm) :
- kisaran harga pasar internet Rp. 720.000 belum pajak
NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH JUMLAH TOTAL
UPAH
1 2 3 4 5 6 7 8=4x7 9

- Kapasitas air maks : 650 ltr


- Ukuran (mm) :
- kisaran harga pasar internet Rp. 770.000 belum pajak

- Kapasitas air maks : 1050 ltr


- Ukuran (mm) :
- kisaran harga pasar internet Rp. 1.135.000 belum pajak
sumber kaskus.com/kamarmandiku.com atau anekamaju.com

Tangki air 300 liter sekualitas merk penguin


1.1000 bh Tangki air 300 liter 480,000.00 528,000.00
10.0000 m' Pralon PVC 3/4" 6,500.00 65,000.00
0.2000 set perlengkapan + asesories 480,000.00 96,000.00
689,000.00
2.0000 OH pekerja 28,500.00 57,000.00
1.0000 OH tukang pipa 60,000.00 60,000.00
1.0000 OH mandor pipa - -
117,000.00
806,000.00
RENCANA ANGGARAN BIAYA

PEKERJAAN : Menara air dengan satu tiang dengan pondasi cakaran standart

VOLUME
ANALIS HARGA
NO URAIAN PEKERJAAN RENCAN SAT. JUMLAH
A SATUAN
A
1 2 3 4 5 6 7
I PEKERJAAN TANAH
1 Galian tanah biasa 2.160 m3 T.1 31,500.00 68,040.00
2 Urugan kembali 0.720 m3 T.13 10,500.00 7,560.00
3 Urugan pasir hurug bawah pondasi 0.072 m3 T.14 119,280.00 8,588.16
4 Urugan pasir hurug bawah lantai 0.144 m3 T.14 119,280.00 17,176.32
SUB TOTAL I : 101,364.48
II PEKERJAAN PLESTERAN
1 Plesteran 1Pc : 3 Ps tbl 15 mm 5.600 m2 PL.1 43,757.20 245,040.32
2 skoneng 1 Pc : 2 Ps 32.000 m' taksir 4,500.00 144,000.00
SUB TOTAL II : 389,040.32
III PEKERJAAN BETON
1 Membuat beton tumbuk mutu k.100 0.216 m3 B.1 775,956.60 167,606.63
2 Cor beton footplat (F1) k.225 (120x120) 0.46 m3 B.4 964,710.32 442,802.04
3 Penulangan beton footplat (F1) 73.26 kg B.7 13,320.00 975,823.20
4 Pasang bekisting beton footplat (F1) 1.32 m2 B.12 65,380.00 86,301.60
5 Cor beton Kolom (K1) k. 225 30/30 0.34 m3 B.4 964,710.32 329,930.93
6 Penulangan Beton kolom (K1) 49.71 kg B.7 13,320.00 662,140.40
7 Pasang bekisting beton kolom (K1) 4.56 m2 B.12 65,380.00 298,132.80
8 Cor beton plat lantai k.225 tb = 12 cm 0.173 m3 B.4 964,710.32 166,701.94
9 Penulangan beton plat lantai tb = 12 cm 17.770 kg B.7 13,320.00 236,691.07
10 Pasang bekisting beton plat lantai tb = 12 cm 1.440 m2 B.9 157,240.00 226,425.60
11 Cor beton balok (C) k. 275 20/40 0.192 m3 B.4 964,710.32 185,224.38
12 Penulangan beton balok (C) 21.525 kg B.7 13,320.00 286,714.60
13 Pasang bekisting beton balok (C) 2.400 m2 B.12 65,380.00 156,912.00
SUB TOTAL III : 4,221,407.19
IV PEKERJAAN BESI DAN ALUMUNIUM
1 Pasang pipa galvanis 2" 0.000 m' taksir 25,300.00 -
SUB TOTAL IV : -
V PEKERJAAN PENGECATAN
1 Mengecat dinding dengan Decolith 5.600 m2 C.11 18,645.00 104,412.00
SUB TOTAL V : 104,412.00

JUMLAH HARGA TOTAL 4,816,223.99

You might also like