PURPOSE : This procedure is used as work instruction for Starting/Stopping of Coal Mill & Coal Feeder.
SCOPE : This procedure is applicable to Coal Mill & Coal Feeder located in STPP 2X600 MW.
RESPONSIBILITY : Boiler operator , Desk Engineer, Unit Control Engineer & Shift In charge.
PROCEDURE:
LINE UP PROCEDURE:
1) No PTW is pending.
2) All manholes are closed.
3) Check sufficient coal in bunker.
4) Feeder inlet gate open.
5) Bunker outlet gate open.
6) Seal air valve to feeder & mill is open.
7) Open cold air gate
8) Open burner isolation gate at corner 1, 2, 3&4 and confirm 'open' limit is acting to DCS.
9) Ensure mill discharge valve should be open.
10) Open feeder outlet gate.
11) Feeder module is ON.
12) Feeder selection is in Remote (on feeder panel).
13) Clean out conveyor is in ON position.(on feeder panel).
14) Open Tramp iron spout valve.(KGV-1)
15) Lube oil level is normal.
16) LOP suction, discharge valves are open.
17) Line-up cooling water to lube oil coolers.( DMCW supply , return valves are open )
18) Lube oil pump- A&B modules are ON and in remote.
19) Breaker in service and in remote.
20) Motor protection relay is healthy.
21) PA fan in service.
22) Seal air fan in service.
23) All Instruments are lined up.
24) Mill reject system is ready.
25) Ensure Mill inert steam is lined-up.
3) Starts Mill and observe any abnormal sound. Motor current and vibration is normal.
4) Open feeder outlet gate.
5) Open hot air gate.
6) Open HAD and CAD, Maintain air flow 80 t/h, Mill discharge temperature 66 to 850C.
7) Start feeder.
8) Load the mill by increasing feeder rate and hot/cold air damper to maintain mill outlet
temperature.
1) Isolate CAG.
2) Close feeder outlet gate.
3) Close bunker outlet gate.
4) Close feeder inlet gate
5) Close seal air valve to feeder & Mill.
6) Rack out the breaker and switch OFF DC supply.
7) Close Pulverize discharge damper.
8) Switch off LOP-A&B modules.
9) Switch off feeder module.
10) Switch off bunker outlet gate module.
1) Oil flow (>200 lpm), Pressure (>2.4 kg/cm2) to Planetary gear box, and Filter DP (<0.8bar).
2) Mill outlet temp within limit (66 to 85 0C).
3) Mill bowl DP is normal.
4) All Bearings temp are normal.
5) All Bearings vibrations are normal.
6) Lube oil level is normal..
STPP 2X600 MW SOP Page 4
SINGARENI THERMAL POWER PLANT
2X 600 MW POWER PLANT
SOP FOR COAL MILL AND COAL FEEDER
RECORDS: The records are maintained in field log book and in CCR log book.