Penyelidikan Tanah Page

PROJECT
Jalan Tol Cisumdawu
SITE Desa Nagrak /Paseh Kaler Sumedang
LOCATION Provinsi Jawa Barat
ELEVATION ABOVE MSL(m) Coordinate UTM X= Y=
BORE HOLE NO. STA 37+025, S1 DEPTH OF GWL (m) -
Machine Type GOUDA Date 2016
Max. Capacity 2.5 Tons Operator Pak Ujang
Manometer type 0-25,0-60,0-250 kg/cm2 Rate of Penetration(mm/second) 20
Piston/Cone Area Ratio (Apc) 1 Piston/Sleeve Area Ratio (Aps) 0.09
Rod-Weight Corr. Factors A-Factor 0.138 B-Factor 0.22 C-Factor 0.0124 D-Factor 0.023

Depth qc Tf Kw qc fs qc-c fs-c Lf Tf Rf


d Tw-Cw Cw.Apc. Kw.Aps. qc+(A.d fs+(C.d fs-cX S fs-c (fs-c/qc-c)
98 98 +B).98 +D).98 0.2 X100
(m) (kg/cm2) (kg/cm2) (kg/cm2) (kPa) (kPa) (kPa) (kPa) (kN/m) (kN/m) (%)
0.00
0.20 0.00 0 0.000 24.265 2.497 0.499 0.499 10.291
0.40 8.00 10.00 2.00 784 17.584 810.970 20.324 4.065 4.564 2.506
0.60 6.00 8.00 2.00 588 17.584 617.674 20.568 4.114 8.678 3.330
0.80 9.00 11.00 2.00 882 17.584 914.379 20.811 4.162 12.840 2.276
1.00 60.00 65.00 5.00 5880 43.961 5915.084 47.430 9.486 22.326 0.802
1.20 57.00 63.00 6.00 5586 52.753 5623.789 56.465 11.293 33.619 1.004
1.40 40.00 44.00 4.00 3920 35.169 3960.494 39.124 7.825 41.444 0.988
1.60 61.00 66.00 5.00 5978 43.961 6021.198 48.159 9.632 51.076 0.800
1.80 72.00 77.00 5.00 7056 43.961 7101.903 48.402 9.680 60.756 0.682
2.00 83.00 89.00 6.00 8134 52.753 8182.608 57.438 11.488 72.244 0.702
2.20 95.00 101.00 6.00 9310 52.753 9361.313 57.681 11.536 83.780 0.616
2.40 116.00 122.00 6.00 11368 52.753 11422.018 57.924 11.585 95.365 0.507
2.60 101.00 107.00 6.00 9898 52.753 9954.722 58.167 11.633 106.998 0.584
2.80 110.00 117.00 7.00 10780 61.545 10839.427 67.202 13.440 120.438 0.620
3.00 128.00 200.00 72.00 12544 633.038 12606.132 638.938 127.788 248.226 5.068
3.20
3.40
3.60
3.80
4.00
Remarks/Sketch Approved by Engineer
Depth qc Tf Kw qc fs qc-c fs-c Lf Tf Rf
d Tw-Cw Cw.Apc. Kw.Aps. qc+(A.d fs+(C.d fs-cX S fs-c (fs-c/qc-c)
98 98 +B).98 +D).98 0.2 X100
(m) (kg/cm2) (kg/cm2) (kg/cm2) (kPa) (kPa) (kPa) (kPa) (kN/m) (kN/m) (%)
4.20
4.40
4.60
4.80
5.00
5.20
5.40
5.60
5.80
6.00
6.20
6.40
6.60
6.80
7.00
7.20
7.40
7.60
7.80
8.00
8.20
8.40
8.60
8.80
9.00
9.20
9.40
9.60
9.80
10.00
10.20
10.40
10.60
10.80
11.00
11.20
11.40
11.60
11.80
12.00
Remarks/Sketch Approved by Engineer
Depth qc Tf Kw qc fs qc-c fs-c Lf Tf Rf
d Tw-Cw Cw.Apc. Kw.Aps. qc+(A.d fs+(C.d fs-cX S fs-c (fs-c/qc-c)
98 98 +B).98 +D).98 0.2 X100
(m) (kg/cm2) (kg/cm2) (kg/cm2) (kPa) (kPa) (kPa) (kPa) (kN/m) (kN/m) (%)
12.20
12.40
12.60
12.80
13.00
13.20
13.40
13.60
13.80
14.00
14.20
14.40
14.60
14.80
15.00
15.20
15.40
15.60
15.80
16.00
16.20
16.40
16.60
16.80
17.00
17.20
17.40
17.60
17.80
18.00
18.20
18.40
18.60
18.80
19.00
19.20
19.40
19.60
19.80
20.00
20.20
20.40
20.60
20.80
21.00
21.20
21.40
21.60
21.80
22.00
Remarks/Sketch Approved by Engineer
Depth qc Tf Kw qc fs qc-c fs-c Lf Tf Rf
d Tw-Cw Cw.Apc. Kw.Aps. qc+(A.d fs+(C.d fs-cX S fs-c (fs-c/qc-c)
98 98 +B).98 +D).98 0.2 X100
(m) (kg/cm2) (kg/cm2) (kg/cm2) (kPa) (kPa) (kPa) (kPa) (kN/m) (kN/m) (%)
Depth qc Tf Kw qc fs qc-c fs-c Lf Tf Rf
d Tw-Cw Cw.Apc. Kw.Aps. qc+(A.d fs+(C.d fs-cX S fs-c (fs-c/qc-c)
98 98 +B).98 +D).98 0.2 X100
(m) (kg/cm2) (kg/cm2) (kg/cm2) (kPa) (kPa) (kPa) (kPa) (kN/m) (kN/m) (%)
22.20
22.40
22.60
22.80
23.00
23.20
23.40
23.60
23.80
24.00
24.20
24.40
24.60
24.80
25.00
25.20
25.40
25.60
25.80
26.00
26.20
26.40
26.60
26.80
27.00
27.20
27.40
27.60
27.80
28.00
28.20
28.40
28.60
28.80
29.00
29.20
29.40
29.60
29.80
30.00
30.20
30.40
30.60
30.80
31.00
31.20
31.40
31.60
Remarks/Sketch Approved by Engineer
Depth qc Tf Kw qc fs qc-c fs-c Lf Tf Rf
d Tw-Cw Cw.Apc. Kw.Aps. qc+(A.d fs+(C.d fs-cX S fs-c (fs-c/qc-c)
98 98 +B).98 +D).98 0.2 X100
(m) (kg/cm2) (kg/cm2) (kg/cm2) (kPa) (kPa) (kPa) (kPa) (kN/m) (kN/m) (%)
Penyelidikan Tanah Page
PROJECT
Jalan Tol Cisumdawu
SITE Desa Nagrak /Paseh Kaler Sumedang
LOCATION Provinsi Jawa Barat
ELEVATION ABOVE MSL(m) Coordinate UTM X= Y=
BORE HOLE NO. STA 37+025, S1 DEPTH OF GWL (m)
Machine Type GOUDA Date 2016
Max. Capacity 2.5 Tons Operator Pak Ujang
Manometer type 0-25,0-60,0-250 kg/cm2 Rate of Penetration(mm/second) 20
Piston/Cone Area Ratio (Apc) 1 Piston/Sleeve Area Ratio (Aps) 0.09
Rod-Weight Corr. Factors A-Factor 0.138 B-Factor 0.22 C-Factor 0.0124 D-Factor 0.023

Nilai Konus (qc) kPa Rf (%)

0 5000 10000 15000 20000 25000 0 2 4 6 8 10


0.00 0 .0 0

2.00 2 .0 0
Kedalaman (meter)

4.00 4 .0 0

6.00 6 .0 0

8.00 8 .0 0

10.00 1 0 .0 0

12.00 1 2 .0 0

14.00 1 4 .0 0

16.00 1 6 .0 0

18.00 1 8 .0 0

20.00 2 0 .0 0

0 500 1000 1500 2000 2500

Jumlah Hambatan Lekat (tf) kN/m

qc
tf
DAYA DUKUNG PONDASI TIANG DARI DATA SONDIR
Penyelidikan Tanah
PROJECT
Jalan Tol Cisumdawu
SITE Desa Nagrak /Paseh Kaler Sumedang
LOCATION Provinsi Jawa Barat
ELEVATION ABOVE MSL(m) Coordinate UTM X= Y=
BORE HOLE NO. STA 37+025, S1 DEPTH OF GWL (m)
Machine Type GOUDA Date 2016
Max. Capacity 2.5 Tons Operator Pak Ujang
Manometer type 0-25,0-60,0-250 kg/cm2 Rate of Penetration(mm/second) 20
Piston/Cone Area Ratio (Apc) 1 Piston/Sleeve Area Ratio (Aps) 0.09
Rod-Weight Corr. Factors A-Factor 0.138 B-Factor 0.22 C-Factor 0.0124 D-Factor 0.023

Daya Dukung (Ton)

0 50 100 150 200 250 300


0.00

D = 30 cm
D = 40 cm
D = 50 cm
Kedalaman (m)

1.00 D = 60 cm
D = 80 cm

2.00

3.00

4.00