Professional Documents
Culture Documents
Method Statement of Installation of RO PRESSURE VESSELS
Method Statement of Installation of RO PRESSURE VESSELS
Method Statement of Installation of RO PRESSURE VESSELS
DOCUMENT TITLE :
METHOD STATEMENT FOR
RO PRESSURE VESSELS INSTALLATION
TABLE OF CONTENT
1
Khobar Sea Water RO Desalination Plant
Salem Al Salem Cont. Est.
Method Statement for RO Pressure vessels
1. INTRODUCTION
2. SCOPE
3. PURPOSE
4. REFERENCE DOCUMENTS
5. DEFINITIONS
6. RESPONSIBILITIES
7. MATERIAL RECEIVING & HANDLING
8. PREPARATION FOR INSTALLATION
9. CODES AND STANDARDS
10. MOUNTING THE SHELL
11. PIPING CONNECTIONS
12. TECHNICAL DATA
13. INSPECTION & ACCEPTANCE
14. HEALTH, SAFETY AND RISK ASSESSMENT
2
Khobar Sea Water RO Desalination Plant
Salem Al Salem Cont. Est.
Method Statement for RO Pressure vessels
1. INTRODUCTION
This method statement covers the procedure involved in handling & installation
of RO pressure vessels.
2. SCOPE
This Scope is to describe the methodology for the Installation of RO
pressure vessels shown in IFC drawings works to be performed for KHOBAR
SEA WATER REVERSE OSMOSIS PLANT Project at Al Khobar City in
Kingdom of Saudi Arabia, in order to qualify and comply with all the Project
Specifications.
3. PURPOSE
The purpose of this method statement is to describe the necessary steps
to be followed during the Installation of RO pressure vessels.
4. REFERENCE DOCUMENTS
Approved IFC Drawings.
Project Specification-H652-DSL-EPC-0300-Rev.3
5. DEFINITIONS
All definitions mentioned in the documents have priority over other
standards and any deviations of these standards shall be brought to the
attention of the Company Representative for resolution. All terms are used in
the development of this procedure are defined below:
Project Khobar Reverse Osmosis Sea Water Desalination Plant
Client Saline Water Conversion Corporation
Consultant FICHTNER
Contractor ACCIONA
Sub-contractor Salem Al Salem Contracting Establishment
6. RESPONSIBILITIES
Following responsibilities need to be assured by the Sub-contractor’s
construction management under this section of works.
3
Khobar Sea Water RO Desalination Plant
Salem Al Salem Cont. Est.
Method Statement for RO Pressure vessels
4
Khobar Sea Water RO Desalination Plant
Salem Al Salem Cont. Est.
Method Statement for RO Pressure vessels
5
Khobar Sea Water RO Desalination Plant
Salem Al Salem Cont. Est.
Method Statement for RO Pressure vessels
6
Khobar Sea Water RO Desalination Plant
Salem Al Salem Cont. Est.
Method Statement for RO Pressure vessels
From the High pressure feed pumps. Those vessel components in contact with the
product stream shall be suitable for use with drinking water and meet requirements
NSF/ANSI 61 Drinking Water Components – Health Effects.
Vessels must be installed correctly to ensure safe use and long service
life.
Check that vessels mounted on horizontal support frame using compliant
black urethane saddles; hold-down straps snug, not tight.
Check that each vessel is free to expand under pressure; shell is not
clamped rigidly in place; piping vessel ports not connected using rigid
connections.
Check that each vessel does not support any other component.
All the vessels are of different capacities, they shall be clearly marked for
erection.
7
Khobar Sea Water RO Desalination Plant
Salem Al Salem Cont. Est.
Method Statement for RO Pressure vessels
Technical Data
DESCRIPTION DATA
Manufacturer Harbin ROPV Industrial Co.,
Manufacturer
Ltd.
Type Type R8040B1200S-7W
Size Size 8 “
Connection Lateral
TA
8
Khobar Sea Water RO Desalination Plant
Salem Al Salem Cont. Est.
Method Statement for RO Pressure vessels
DESCRIPTION DATA
Manufacturer Harbin ROPV Industrial Co.,
Manufacturer
Ltd.
Type R8040B450S-7W
Size 8“
Port Size 3”
Connection Lateral
9
Khobar Sea Water RO Desalination Plant
Salem Al Salem Cont. Est.
Method Statement for RO Pressure vessels
Final Check
After the RO pressure vessels have been installed it should be
Checked carefully as follows:
10
Khobar Sea Water RO Desalination Plant
Salem Al Salem Cont. Est.
Method Statement for RO Pressure vessels
11