—— 1 SITE TEST REPORT
FOR
400 KV -3 BAY EXTENTION OF EBOP
) ‘2 300 MW COAL BASED TPP
‘CHANDRAPUR
‘SUB CONTRACTOR:VEN
|W COAL BASED TPP CHANDRAPUR _
(Contract No : LOWPLLIPJINOWVENUS CONTROLS/00L
|" Date OF TESTING TEST REPORT FOR ich Yard 12 BAY
| 2014 ‘REACTOR i Page Nor 1
4. Equipment Details
Make BHEL
Rated power 63 MVAR
Rated voltage (V) 420
Rated current (A) 87
Impedance Ohm/phase 2800
Connection symbol YN
SI. No. + 6007251
Type of Cooling : ONAN
‘Year of Manufacture 2 2013
2. Location 63 MVAR Reactor 5: LINE-4
3. Insulation Resistance Measurement: (Using Equipment Details)
Make: CIE Range: 5000V SILNo. 60423 Calib due date: 25.06.2014
Main Winding
HV—Earth
Make :CIE Range :500V —S.No.66387 —Calib due date :25-06-2014
Megger used | Reference _ Measured value in (MO)
[ec-cL [>500 —
500 CCG [5500
- _ ck —
Checked by: wit
Wis: VOLTECH Oo
Rahul Chawa?
Sig:
Date:
Phases
— Fa
| 11 (ta
elsSITE TEST REPORT
FOR
a 400 KV -3 BAY EXTENTION OF EBOP
be ‘2x 300 MW COAL BASED TPP
CHANDRAPUR
SUB CONTRACTOR:VENUS CONTROLS AND SWITCHGEAR PVT LTD
| Fioject:__2300 MW COAL BASED
Location / Switch Yard
Page No: 2
DATE OF TESTING
18-03-2014
REACTOR TRANSFORMER
4. Magnetizing Current Test: (Using Equipment Details)
SI. No. 15592785 Calib due date: 11.04 2014
Make: FLUKE Range: 1000V
Calib due date: 06.06.2014
‘SI. No: W8082876
Make: Kyoritsu Range: 100A
Applied Voltage in HV Side(V) HV Side (mA)
qUIV aviw | Awiu Ww
407 | 405 400_ 86.6 |
5. Winding Resistance Test;
Make: Scope Range:10000 ~—_— SI. No.2304.08Y633__Callib due date: 21-05-2014
i Measured Primary Winding Resistance in Ohms
ie/t [i
i 4ViN
2.482 i 2.487 veel
| Trbecied caeah 4-498 4 Laeta L466 A |
wa)
L i 7 J
6. Remarks :The fearioy is ready for Commissioning
__Checked by: Witnessed by =
Mis: VOLTECH it
Name: / j ON
a obs Y i Draiteng Hace eae
ig? 4 {Sig Tig: PSiguit
Date: 1 Date: Dato:
LIAli4