PROJECT TITLE: FENCING OF LOT 326-B-1

LOCATION: BRGY. MIRANDA, PONTEVEDRA, NEGROS OCC.


OWNER: GRACE CONCEPCION R. DAVIDO

BILL OF MATERIALS
QTY UNIT DESCRIPTION UNIT COST TOTAL COST
I. Column & Footing
97 bags Portland Cement 230.00 22,310.00
10 cum Washed Sand 800.00 7,760.00
5 cum 3/4" Crushed Stone 1,500.00 7,275.00
20 kgs #16 Tie Wire 75.00 1,500.00
95 lgth 9mmØ x 6m Def. Bars 120.00 11,400.00
85 lgth 10mmØ x 6m Def. Bars 170.00 14,450.00
10 pcs Hacksaw Blade, Heavy Duty 75.00 750.00
40 pcs 1/4"(5mm) - 4 x 8 Marine Plywood, 350.00 14,000.00
40 pcs 2 x 2 x 10 G-Melina Lumber 120.00 4,800.00
Material cost - - 65,445.00

II. CHB Wall & Wall Footing


332 bags Portland Cement 275.00 91,300.00
25 cum Washed Sand 800.00 20,000.00
8 cum 3/4" Crushed Stone 1,500.00 11,550.00
37 kgs #16 Tie Wire 75.00 2,775.00
64 lgth 10mmØ x 6m Def. Bars 175.00 11,200.00
43 lgth 9mmØ x 6m Def. Bars 120.00 5,160.00
3 pcs Cyclone Wire 200.00 600.00
30 lgth 2"x2" Square Tube - -
10 pcs Hacksaw Blade, Heavy Duty 75.00 750.00
Material cost - - 143,335.00

TOTAL MATERIAL COST 208,780.00


LABOR 83,512.00
TOTAL COST 292,292.00

Prepared by: Approved by:

__________________________
Owner