Professional Documents
Culture Documents
Cost and Revenue Analysis Blank-Commercial
Cost and Revenue Analysis Blank-Commercial
Cost and Revenue Analysis Blank-Commercial
Projections
for
Date of Preparation
NAME OF EGS-LINKED ENTERPRISE
Address: NAME OF EGS-LINKED ENTERPRISE
TABLE OF CONTENTS
Sheet Name
Cover
Definition of Terms
Summary Table
Assumptions
Projected Income and Expenses
Sensitivity Analysis
Financial Statements
Other Financial Data
Production Data
Payment for Environmental Services (PES)
Demographics
Connection
Consumption
Data Sources
Description
This is a report sheet containing summary of analysis using key performance indicators
This is an input sheet containing management parameters used in projections.
This is a report sheet containing projected revenues and expenses
This sheet isan input and computation sheet for sensitivity of analysis and what if scenarios.
This is an input sheet where the audited income statement and balance sheet data are entered.
This sheet is an input and a computation sheet for other financial data/information
This sheet is an input and computation sheet where production data are entered
This sheet is an input and computation sheet where allocations for watershed activities are entered
This sheet is used to compute for the current and projected number of population in the service area
This sheet is used to compute for the current and projected number of connections
This sheet is an input and computation sheet. The current consumption per consumer is computed in this
sheet
This sheet identifies the sources of data
Scenario 1
Less 20% of Income
2018 2019 2020
Total Revenue
Total Cost
Net Income
Scenario 2
Plus 20% of Cost
2018 2019 2020
Scenario 3
Plus 20% Cost and Less 20% Revenue
2018 2019 2020
Total Revenue
Total Cost
Net Income
20% of Income
2021 2022 2023
s 20% of Cost
2021 2022 2023
Income Statement
2016 2017
Revenues
Total 0 -
Expenses
Salaries
Total 0 0
Net Income 0 0
Balance Sheet
ASSETS
-
Less: Accumulated Depreciation
Net Utility Plant - -
Deferred Debits/Assets
Total 0 -
-
-
-
-
-
-
-
-
-
2018 2019 2020
Fixed Cost
Fixed Cost per unit
Variable Cost
Variable Cost per unit
Contribution Margin
Average Price
Note:
Production Volume
Volume Sold
Loss
% of Loss
Allowable Loss
Production assets
PROJECTED
- - -
2018 Actual Projecte
Allocated Cost 2019
PES /Environment Protection
Total Annual Allocation to Environment Protection
% of Environmental Allocation to Revenues
% of Environmental allocation to Total Cost
PES/Environmental Allocation Cost Per Cu.m Produced
PES/Watershed Allocated Cost Per Cu.m Produced
Projected
2020 2021 2022 2023
- - - -
- - - -
Base Year PROJECT
2018 2019 2020
Water Volume Produced
Allowed water production (per water permit)
% of excess production vis-à-vis allowed production
PROJECTED
2021 2022 2023
Name of Asset Date Acquired Acquisition Cost
2016 2017 2018 2019 2020 2021
Existing Loan
Projected Loans
Monthly Data Sheet MDS
Annual Financial Statements
Water Permits
Production Logbook
Business Plan
Feasibility Study