Grain Size Analysis of Soil

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 17

EPC Contractor Authority Engineer

Yooshin Engineering Corporation JV with


MultiMedia Consultants Pvt. Ltd. In
Megha Engineering & Infrastructures Ltd
Association JS Environics Consultants Pvt.
Ltd.

Construction of Access Controlled Nagpur-Mumbai Super Communicat


(Maharashtra Samruddhi Mahamarg) in the State of Maharashtra un
Package-9 : From Km 390.445 to Km 444.845
Section:Village Bendiwada to Village Fatiyabad, District : Aura

GRAIN SIZE ANALYSIS OF SOIL


As per IS:2720 (Part-4)

Lab. Ref. :……………………………

Type of Material :……………………………

Location / Source:……………………………

Weight of Cumulative Wt.


IS Sieve Cumulative % of
Retained of Retained
Size Retained
(gms) (gms)

75 mm

19 mm

4.75 mm

2.00mm

425 µ

75 µ
Pan

Gravel (%): ……………… Sand (%): …………..….

Remarks: ……………………………………………………...………………………………

EPC Contractor's Representative. Authority Engin


SPV Sponsor

Nagpur-Mumbai Maharashtra State


Super Communication Road Development
Expressway Ltd. Corporation Ltd.

ed Nagpur-Mumbai Super Communication Expressway


hamarg) in the State of Maharashtra under EPC mode
: From Km 390.445 to Km 444.845
ada to Village Fatiyabad, District : Aurangabad

SIZE ANALYSIS OF SOIL


As per IS:2720 (Part-4)

Date of :…………………..

Date of :…………………..

Wt. of S :…………………..

Percentage
Remarks
of passing
Silt & Clay(%) : ………….

…………………...………………………………

Authority Engineer/Client's Representative.


EPC Contractor Authority Engineer SPV Sponsor

Yooshin Engineering Corporation JV with


Nagpur-Mumbai Super Maharashtra State
MultiMedia Consultants Pvt. Ltd. In
Megha Engineering & Infrastructures Ltd Communication Road Development
Association JS Environics Consultants Pvt.
Expressway Ltd. Corporation Ltd.
Ltd.

Construction of Access Controlled Nagpur-Mumbai Super Communication Expressway


(Maharashtra Samruddhi Mahamarg) in the State of Maharashtra under EPC mode.

Package-9 : From Km 390.445 to Km 444.845


Section:Village Bendiwada to Village Fatiyabad, District : Aurangabad
MODIFIED PROCTOR COMPACTION TEST
As Per IS:2720 (Part-8)

Lab. Ref. Date of Sampling

Location / Source 420 Date of Testing:

Type of Material No. of Blows 55

Mould Volume (W2) 2250 Mould Wt. (W1) 6020

Rammer Wt. 4.9


Sl.
TEST NO. Unit 1 2 3 4 5 6
No
1 Water Add. (%) (%) 4 6 8 10 12

2 Wt. of mould + compacted soil (W3) gm 10749 10896 11124 11092 10950

3 Wt. of compacted soil W4 = (W3-W1 gm 4729 4876 5104 5072 4930

4 Wet Density W5 = (W4/W2) gm/ cc 2.1 2.16 2.26 2.25 2.19

5 Cointainer No. 74 36 34 33 35

6 Weight of Container(W6) gm 37 39 35 39 39

7 Wt. of Container + Wet Soil (W7) gm 157 164 150 160 163

8 Wt. of Container + Dry Soil - (W8) gm 148 154 138 148 150

9 Wt. of Water W9 = (W7-W8) gm 9 10 12 12 13

10 Wt. of Dry Soil W10 = (W8-W6) gm 111 115 103 109 111
Moisture Content W11 =
11 % 8.1 8.69 11.65 11 11.71
(W9/W10)x100
12 Dry Density W12 = W5 / {1+(W11/1gm/ cc 1.942 1.987 2.024 2.027 1.96
Dry Density (g/cc)

M.D.D (g/cc) :

O.M.C (%)

Water Content (%)

Remarks: ………………………...…………………….……………………………………………………….

EPC Contractor's Representative. Authority Engineer/Client's Representative.


EPC Contractor Authority Engineer SPV Sponsor

Yooshin Engineering Corporation JV with Nagpur-Mumbai Super Maharashtra State Road


Megha Engineering &
MultiMedia Consultants Pvt. Ltd. In Association Communication Development Corporation
Infrastructures Ltd
JS Environics Consultants Pvt. Ltd. Expressway Ltd. Ltd.

Construction of Access Controlled Nagpur-Mumbai Super Communication Expressway


(Maharashtra Samruddhi Mahamarg) in the State of Maharashtra under EPC mode.

Package-9 : From Km 390.445 to Km 444.845


Section:Village Bendiwada to Village Fatiyabad, District : Aurangabad

FREE SWELL INDEX OF SOIL


As per IS 2720 ( Part- 40)

Lab Ref. : ……………………….. Date of Sampling : ……………………….

Type of Material: ……………………….. Date of Testing : ……………………….

Location / Sourc: ………………………..

TEST NUMBERS
DESCRIPTION UNIT
1 2 Average

1 Mass of dry soil passing 425 micron sieve gm

2 Volume of soil in water After 24 hrs (Vw) ml

3 Volume of soil in Kerosene after 24 hrs (Vk) ml

4 Free Swell Index = (Vw - Vk) / Vk X 100 %

Remarks : ---------------------------------------------------------------------------------

Authority Engineer/Client's
EPC Contractor's Representative. Representative.
EPC Contractor Authority Engineer SPV Sponsor

Yooshin Engineering Corporation JV with Nagpur-Mumbai Super Maharashtra State


Megha Engineering & Infrastructures Ltd. MultiMedia Consultants Pvt. Ltd. In Association JS Communication Road Development
Environics Consultants Pvt. Ltd. Expressway Ltd. Corporation Ltd.

Construction of Access Controlled Nagpur-Mumbai Super Communication Expressway


(Maharashtra Samruddhi Mahamarg) in the State of Maharashtra under EPC mode.

Package-9 : From Km 390.445 to Km 444.845


Section:Village Bendiwada to Village Fatiyabad, District : Aurangabad

ATTERBERGS LIMITS (CONE PENETRATION METHOD)


As per IS:2720 (Part-5)
Lab. Ref. :……………………. Date of Sampli:………………..

Location / Sour:……………………. Date of Testing:………………..

Type of Materia
:…………………….
LIQUID LIMIT (LL) PLASTIC LIMIT (PL)
Determination No. Unit
1 2 3 4 1 2 Average

Penetration in mm -

Container No. -

Wt. of Container (W1) gms.

Wt. of Container + wet Soil (W2) gms.

Wt. of Container + Oven Dry Soil (W3 gms.

Wt. of Water W4 = (W2-W3) gms.

Wt. of Dry Soil W5 = (W3-W1) gms.


Moisture Content W6 =
%
(W4/W5)X100
Moisture Content (%)

Determination of Liquid Limit

LL (%) =

PL (%) =

PI (%) =

Penetration in mm
Remarks: …………………………………………………………………………………………..

EPC Contractor's Representative. Authority Engineer/Client's Representative.


EPC Contractor Authority Engineer SPV Sponsor

Yooshin Engineering Corporation JV with MultiMedia Nagpur-Mumbai Super Maharashtra State


Megha Engineering & Infrastructures Ltd Consultants Pvt. Ltd. In Association JS Environics Communication Road Development
Consultants Pvt. Ltd. Expressway Ltd. Corporation Ltd.

Construction of Access Controlled Nagpur-Mumbai Super Communication Expressway


(Maharashtra Samruddhi Mahamarg) in the State of Maharashtra under EPC mode.

Package-9 : From Km 390.445 to Km 444.845


Section:Village Bendiwada to Village Fatiyabad, District : Aurangabad

ATTERBERGS LIMITS (CASAGRANDE METHOD)


As per IS:2720 (Part-5 )

Lab. Ref. :……………………. Date of Sampling :………………..

Location / Source :……………………. Date of Testing :………………..

Type of Material :…………………….


LIQUID LIMIT (LL) PLASTIC LIMIT (PL)
Determination No. Unit
1 2 3 4 1 2 Average

No. of Blows -

Container No. -

Wt. of Container (W1) gms.

Wt. of Container + wet Soil (W2) gms.

Wt. of Container + Oven Dry Soil (W3) gms.

Wt. of Water W4 = (W2-W3) gms.

Wt. of Dry Soil W5 = (W3-W1) gms.

Moisture Content W6 = (W4/W5)X100 %


% of Moisture C ontent

100

90

80 LL (%) =
70

60
PL (%) =
50

40
PI (%) =
30

20

10

0
1 1;
10 0 2 3 4 5 6; 0 7 8 9 100

No. of Blows

Remarks: …………………………………………………………………………………………..

EPC Contractor's Representative. Authority Engineer/Client's Representative.


EPC Contractor Authority Engineer SPV Sponsor

Yooshin Engineering Corporation JV with MultiMedia Nagpur-Mumbai Super Maharashtra State


Megha Engineering & Infrastructures Ltd Consultants Pvt. Ltd. In Association JS Environics Communication Road Development
Consultants Pvt. Ltd. Expressway Ltd. Corporation Ltd.

Construction of Access Controlled Nagpur-Mumbai Super Communication Expressway


(Maharashtra Samruddhi Mahamarg) in the State of Maharashtra under EPC mode.

Package-9 : From Km 390.445 to Km 444.845


Section:Village Bendiwada to Village Fatiyabad, District : Aurangabad

FIELD DENSITY TEST


BY SAND REPLACEMENT METHOD
As per IS : 2720 ( Part-28 )

RFI No. :…………………………. Source of Material :………………………….

Date :…………………………. MDD (g/cc), (Ymdd) :………………………….

Location :…………………………. OMC (%) :………………………….

Layer :…………………………. Bulk Density of sand,:…………………..(g/cc)

Sand Pouring Cylinder No.:……….. Dia.: Wt. of Sand in cone :…………………..(gm.)


1. Description Test Hole No. 1 2 3 4 5 6 7 8 9 10

A Location of Test

B Offset from C/L

C Depth of Hole, ( mm )

2. Determination of Wet Unit Weight

D Wt. of Wet Sample from Hole, ( g )

E Wt.of Sand+Cylinder before Pourin

F Wt.of Sand+Cylinder after Pouring,

G Wt of Sand in Cone, from calibrati

H Wt. of Sand in Hole, ( g ) (E-F-G)

I Volume of Sand, (cc) ( H/Ys )

Wet Density of Sample,


J
Ywet, ( g/cc) (D/I)

3. Determination of Water Content

K Container No.

L Container wt., g

M Wt.of wet Soil + Container, g ( W1)

N Wt.of Dry Soil + Container, g ( W2

Moisture Content %,
O
W = ((W1-W2)/W2)*100

P Dial Gauge Reading, ( Div )

Moisture Content ( % )
Q
from RMM Calibration chart

4. Degree of Compaction

Dry Density, (g/cc)


R
Yd = Ywet / (1 + W/100)
Degree of Compaction, ( % )
S
(( Yd/Ymdd)*100)

T Compaction Required, ( % )

Acceptance Criteria: Meanvalue > Specified value +(1.65-1.65/√n)xSDEV

Remarks : ……………………………………………………………………………………………………………………………….

EPC Contractor's Representative. Authority Engineer/Client's Representative.


EPC Contractor Authority Engineer

Yooshin Engineering Corporation JV with Mu


Megha Engineering & Infrastructures Ltd Consultants Pvt. Ltd. In Association JS Env
Consultants Pvt. Ltd.

Construction of Access Controlled Nagpur-Mumbai Super


(Maharashtra Samruddhi Mahamarg) in the State of Mah
Package-9 : From Km 390.445 to Km
Section:Village Bendiwada to Village Fatiyabad, D

CALIFORNIA BEARING RAT


As per IS 2720 (Part-16
Lab. Ref. No. :……………………………..

Type of Material :……………………………..

Location / Source: :……………………………..

Type of Compaction : Static / Dynamic

Volume of Mould (V) cc :


Before Before
Condition of Sample After Soaking
Soaking Soaking
No. of Blows

Mould No.

Wt. of Mould (W1) gms.

Wt. of wet sample + Mould (W2) gms

Wt. of wet sample W3 = (W2-W1) gm

Wet Density W4 = (W3/ V v)

Moisture Determination

Cantainer No.

Wt. of container (W5) gms.


Wt. of Wet sample + container (W6)

Wt. of Dry sample + container (W7)

Wt. of Water W8 = (W6-W7) gms.

Wt. of Dry sample W9 = (W7-W5) gm

% Moisture Content W10 = (W8/W9

Dry Density W11=((W4) / (100+W10

Proving Ring Correction Factor :

Penetration Mould No : Mould


Standard Load PR Reading Load in PR Reading
in mm
(Div) (kg) (Div)
0.0

0.5

1.0

1.5

2.0
Standard Load : 1370
2.5
kg

4.0
Standard Load : 2055
5.0
kg

7.5

10.0

12.5

Remarks: …………………………………………………………………………………………………

EPC Contractor's Representative.


uthority Engineer SPV Sponsor

ng Corporation JV with MultiMedia Nagpur-Mumbai Super Maharashtra State Road


Ltd. In Association JS Environics Communication Expressway Development Corporation
onsultants Pvt. Ltd. Ltd. Ltd.

Nagpur-Mumbai Super Communication Expressway


arg) in the State of Maharashtra under EPC mode.
om Km 390.445 to Km 444.845
to Village Fatiyabad, District : Aurangabad

BEARING RATIO (CBR)


r IS 2720 (Part-16 )
Date of Casting :…………………………

Date of Testing :…………………………

Period of Soaking :…………………………

MDD (g/cc) :…………………………

OMC (%) :…………………………


Before Brfore
After Soaking After Soaking
Soaking Soaking
Mould No : Mould No :
PR Reading Load in PR Reading Load in
(Div) (kg) (Div) (kg)

………………………………………………………………………

Authority Engineer/Client's Representative.


EPC Contractor Authority Engineer

Yooshin Engineering Corporation JV with Nagpur-


Megha Engineering & Infrastructures Ltd MultiMedia Consultants Pvt. Ltd. In Association Com
JS Environics Consultants Pvt. Ltd. Expr

Construction of Access Controlled Nagpur-Mumbai Super Communication


(Maharashtra Samruddhi Mahamarg) in the State of Maharashtra under
Package-9 : From Km 390.445 to Km 444.845
Section:Village Bendiwada to Village Fatiyabad, District : Aurang

CALIFORNIA BEARING RATIO (CBR


IS : 2720 ( Part-16 )
Type of Material: ……………………. Date of Sampling
Location / Source : ………………… Date of Testing :

40

37.5

35

32.5

30

27.5
Load (kg.)

25

22.5

20

17.5
15

12.5

10

7.5

2.5

0
0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6 6.5 7 7.5 8 8.5 9 9.5 10 10.5 11 11

Penetration (mm)

EPC Contractor's Representative. Authority E


SPV Sponsor

Nagpur-Mumbai Super Maharashtra State


Communication Road Development
Expressway Ltd. Corporation Ltd.

ur-Mumbai Super Communication Expressway


n the State of Maharashtra under EPC mode.
Km 390.445 to Km 444.845
llage Fatiyabad, District : Aurangabad

ARING RATIO (CBR)


20 ( Part-16 )
Date of Sampling : …………………
Date of Testing : ……………………
7 7.5 8 8.5 9 9.5 10 10.5 11 11.5 12 12.5 13 13.5 14 14.5 15

enetration (mm)

Authority Engineer/Client's Representative.

You might also like