Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

How to Check RCU status

using LMT
Firstly, You have to Login with LMT, and right click to BS8900 and choose Scan AISG
Device
Scan AISG Device window will appear and then Right click and choose Scan AISG
Device.
Choose All racks and apply OK.
It will scan AISG device for about 7 min. You have to wait at this moment
doing nothing.
This is the sample result of successful installed RCU Device. If your
installation was Wrong or Device faulty, You will not see like this result.
If your checked result is ok, You call OMC Engineer and
request to Calibrate RET.
If the calibration Result is successful, All Tasks of RCU
installation are finished.
If Calibration Results of some Sectors are failed, The
‘external extended device is faulty’ alarm will show in RRU.
If so, you need to check related RCU connection cable and
device again.

Hlwan Moe Aung


BSC/RNC Engineer
ZTE(Mandalay)

You might also like